This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S., Inc. for environmental services at the DMS Facility in Starke, Bradford County, Florida (Site ERIC_6157). The task assignment is issued pursuant to Contract Number HW680 and represents an indefinite delivery vehicle under which specific work tasks are assigned. Key parties include the FDEP as the contracting state agency, with Jeff Newton serving as the Department Project Manager, and Arcadis U.S., Inc., with Gus Suarez as the Contractor's Project Manager.
The scope of work encompasses site assessment activities including GPR/utility location and clearance, bush hogging of access pathways, installation of three monitor wells (MW-115 (35-45), MW-115 (45-55), and MW-116 (40-50)), professional survey of well locations, generation of off-site notification materials, semi-annual groundwater monitoring, and management of investigation derived waste (IDW). The total Task Assignment value is $80,613.17 on a fixed unit rate basis. Deliverables are scheduled across four invoicing periods with amounts of $1,784.12 (Off-Site Notification Package), $33,438.32 (MW Installation Field Event Summary), $32,954.05 (Semi-Annual GW Monitoring Event Summary), and $12,436.68 (Project Management and Semiannual Groundwater Monitoring Report), with a completion date of July 14, 2024. The cost estimate includes labor, overhead, travel, equipment rental, subcontractor services (including drilling, surveying, utility location, and IDW disposal), and field expenses.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
SA293 Completion July 14, 2024
Arcadis will conduct site assessment, as outlined in the Nov. 30, 2023 (updated 1/22/24) Proposal for Supplemental Site Assessment and Semi-annual Groundwater Monitoring Activities, DMS Facility- Starke letter. Activities will include GPR/utility locate and clearance, bush hogging of access pathways to monitor well locations, monitor well installation, professional survey of wells, generation of Off-site Notification materials, Semi-Annual Groundwater Monitoring event, and T&D of IDW. Arcadis will generate brief field event summaries, and a Semi-Annual Groundwater Monitoring Report that will summarize the results of field activities and will include tables and figures, sample analytical reports, and field documentation.
Jeff Newton 850-245-8955 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-353-5778
ERIC_6157
14281 US Highway 301, Starke, Bradford Co.
DMS Facility - Starke MW Installation and Sampling Jan. 2024
✔ $ 80,613.17
$ 80,613.17
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2024.01.24 14:45:30 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.01.24 14:29:22 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2- Off-Site Notification Package Information 02/09/2024
Subtask 3- MW Installation Field Event Summary, Drum Log 02/22/2024
Subtask 4- Semi-Annual GW Monitoring Event Summary, Drum Log 03/15/2024
Subtask 1 and 5- Project Management and Semiannual Groundwater Monitoring Report, Waste Manifests 05/03/2024
Subtask 2- Off-Site Notification Package Information $ 1,784.12
Subtask 3- MW Installation Field Event Summary, Drum Log $ 33,438.32
Subtask 4- Semi-Annual GW Monitoring Event Summary, Drum Log $ 32,954.05
Subtask 1 and 5- Project Management and Semiannual Groundwater Monitoring Report, Waste Manifests $ 12,436.68
$ 80,613.17
HW680
SA293
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Site # ERIC_6157
DMS Facility - Starke Site File
FROM: Jeff Newton, Project Manager
SUBJECT: Negotiation Summary
HW680 SA293
DATE: January 24, 2024
Arcadis will conduct site assessment, as outlined in the Nov. 30, 2023 (updated 1/24/24) Proposal for Supplemental Site Assessment and Semi-annual Groundwater Monitoring Activities, DMS Facility- Starke letter. Activities will include GPR/utility locate and clearance, bush hogging of access pathways to monitor well locations, monitor well installation, professional survey of wells, generation of Off-site Notification materials, Semi-Annual Groundwater Monitoring event, and T&D of IDW.
Arcadis will generate brief field event summaries, and a Semi-Annual Groundwater Monitoring Report that will summarize the results of field activities and will include tables and figures, sample analytical reports, and field documentation.
Total task amount is $80,613.17. Arcadis’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. Due to issues with EnviroServe and drum removal, the second lowest IDW hauler was selected. Four drilling bids were sought, with two no bids due to equipment availability. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable is due May 3, 2024. Task completion date is July 14, 2024.
ATTACHMENT 3
CEF-LOE
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: *1/24/2024
Task #: SubTask 1 Project Management SubTask 6 Site: DMS Starke SubTask 2 Off-Site Impacts Figures SubTask 7
Activity/Phase: Notice, SSA, GW Monito SubTask 3 MW Installation SubTask 8 Project Manager: Gus Suarez SubTask 4 Semi-Annual GW Monitoring SubTask 9
SubTask 5 Semi-Annual GW Monitoring Report SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$85.87 Project Manager Suarez, Gus (GS) 20 20.0 $100.00 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0 0 0 0 0 0 $88.68 Principal Engineer Burtnett, Susan (SB) 0 0 0 0 0 0 0 0 0 0 $85.87 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0 0 0 0 0 0 $81.66 Principal Scientist McManus, Andrew (ATM) 0 0 0 0 0 0 0 0 0 0 $80.79 Principal Scientist McMillan, Britt (BM) 0 0 0 0 0 0 0 0 0 0 $78.62 Principal Engineer Navon, Daria (DN) 0 0 0 0 0 0 0 0 0 0 $72.56 Principal Scientist Day, Chris (CD) 0 0 0 0 0 0 0 0 0 0 $67.07 Principal Scientist Burke, Brian (BRB) 0 0 0 0 0 0 0 0 0 0 $67.07 Principal Scientist McGlone, Douglas (DMc) 0 0 0 0 0 0 0 0 0 0 $66.87 Principal Scientist Dellay, Leah (LD) 0 0 0 0 0 0 0 0 0 0 $60.88 Principal Scientist O'Sullivan, Michael (MOS) 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 $67.57 Principal Engineer Perella, John (JP) 16 2 3 3 8 0 0 0 0 0 $50.00 Senior Engineer Cardoso, Antonio (AC) 0 0 0 0 0 0 0 0 0 0 $50.00 Senior Engineer Gattenby, Jessica (JG) 0 0 0 0 0 0 0 0 0 0 $50.00 Senior Scientist Larenas, Athnony (AOL) 0 0 0 0 0 0 0 0 0 0 $50.00 Senior Scientist O'Connell, Patrick (PJO) 0 0 0 0 0 0 0 0 0 0 $50.00 Senior Scientist Gillespie, Julie (JG) 0 0 0 0 0 0 0 0 0 0 $50.00 Senior Engineer Cansler, Theresa (TC) 0 0 0 0 0 0 0 0 0 0 $50.00 Senior Engineer Hanna, Chad (CH) 0 0 0 0 0 0 0 0 0 0 $44.00 Project Engineer Romero Cotrino, Camilo (CR) 0 0 0 0 0 0 0 0 0 0 $44.00 Project Engineer Hays, Timothy (TH) 0 0 0 0 0 0 0 0 0 0 $39.34 Staff Scientist Mott, Lyndi (LM) 0 0 0 0 0 0 0 0 0 0 $39.34 Staff Scientist Riley, Joel (JR) 0 0 0 0 0 0 0 0 0 0 $39.34 Staff Scientist Chest, Mark (MC) 0 0 0 0 0 0 0 0 0 0 $39.34 Staff Engineer Vail, Zackary (ZTV) 44 8 4 8 24 0 0 0 0 0 $39.34 Staff Scientist Singer, Jennifer (JS) 0 0 0 0 0 0 0 0 0 0 $35.93 Survey Manager Schacht, Roland (RS) 0 0 0 0 0 0 0 0 0 0 $35.19 Staff Scientist Boros, Anthony (AB) 0 0 0 0 0 0 0 0 0 0 $28.94 Scientist Brooks, Eric (EAB) 12 0 0 0 12 0 0 0 0 0 $28.94 Scientist Salinas, Kendall (KS) 0 0 0 0 0 0 0 0 0 0 $28.94 Scientist Bishton, Dan (DB) 0 0 0 0 0 0 0 0 0 0 $28.94 Scientist Cochran, Laura (LC) 0 0 0 0 0 0 0 0 0 0 $28.94 Scientist Guarino, Andrew (AG) 0 0 0 0 0 0 0 0 0 0 $28.94 Scientist Martineau, Duncan (DM) 0 0 0 0 0 0 0 0 0 0 $28.94 Scientist Brutscher, Katherine (KEB) 0 0 0 0 0 0 0 0 0 0 $28.94 Scientist Nicke, Bert (BN) 29 0 29 0 0 0 0 0 0 0 $28.94 Scientist Escobar, Erica (EE) 0 0 0 0 0 0 0 0 0 0 $28.94 Scientist Taggert, Andrew (AT) 57 0 0 57 0 0 0 0 0 0 $28.94 Scientist Hernandez, Christopher (CH) 0 0 0 0 0 0 0 0 0 0 $28.94 Scientist Sykes, Amy (AS) 0 0 0 0 0 0 0 0 0 0 $28.94 Scientist Bajorek, Amaya (AB1) 57 0 0 57 0 0 0 0 0 0 $28.15 Scientist Estrada, Elena (EE1) 0 0 0 0 0 0 0 0 0 0 $27.02 Scientist Ross, Mackenzie (MR) 0 0 0 0 0 0 0 0 0 0 $26.77 Scientist Munoz, Jesus (JM) 0 0 0 0 0 0 0 0 0 0 $34.89 Technician Welch, David (DJW) 57 0 0 57 0 0 0 0 0 0 $33.40 Technician Dankerl, David (DJD) 57 0 0 57 0 0 0 0 0 0 $30.80 Technician Fortner, Kendrix (KLF) 0 0 0 0 0 0 0 0 0 0 $29.13 Technician Rhodes, John (JAR) 25 0 25 0 0 0 0 0 0 0 $33.80 Technician Fox, Brian (BF) 0 0 0 0 0 0 0 0 0 0 $33.80 Technician Perez, Rachel (RP) 0 0 0 0 0 0 0 0 0 0 $32.26 Technician Kontodaskalakis, Ryan (CK) 0 0 0 0 0 0 0 0 0 0 $21.20 Technician Ward, John (JW) 0 0 0 0 0 0 0 0 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 19 3 0 0 16 0 0 0 0 0 $34.40 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0 0 0 0 0 0 $35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0 0 0 0 0 0 $30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0 0 0 0 0 0 $37.25 Project Assistant Cruz, Michele (MC) 15 2 2 3 8 0 0 0 0 0
Total Hours 408 20 15 63 242 68 0 0 0 0 0
Direct Labor $14,951.08 $1,720.04 $643.37 $2,002.08 $7,820.87 $2,764.72 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 79.00% $11,811.35 $1,358.83 $508.26 $1,581.64 $6,178.49 $2,184.13 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 36.00% $5,382.38 $619.21 $231.61 $720.75 $2,815.51 $995.30 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.10% $5,546.84 $638.13 $238.69 $742.77 $2,901.54 $1,025.71 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $37,691.65 $4,336.21 $1,621.93 $5,047.24 $19,716.41 $6,969.86 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: *1/24/2024
Task #: SubTask 1 Project Management SubTask 6 Site: DMS Starke SubTask 2 Off-Site Impacts Figures SubTask 7
Activity/Phase: Notice, SSA, GW Monito SubTask 3 MW Installation SubTask 8 Project Manager: Gus Suarez SubTask 4 Semi-Annual GW Monitoring SubTask 9
SubTask 5 Semi-Annual GW Monitoring Report SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Travel Vehicle Rental $2,640.00 $0.00 $720.00 $1,920.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $4,220.00 $0.00 $844.00 $3,376.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $6,860.00 $0.00 $1,564.00 $5,296.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) Leppo Rents $1,973.05 $0.00 $1,973.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $1,973.05 $0.00 $1,973.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $197.31 $0.00 $197.31 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,170.36 $0.00 $2,170.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) PDS Drilling (Conventional) $15,635.00 $0.00 $15,635.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Landmark Surveying $1,500.00 $0.00 $1,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Cliff Berry* IDW $3,525.00 $0.00 $3,525.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Blood Hound Utilities $560.00 $0.00 $560.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $21,220.00 $0.00 $21,220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $2,122.00 $0.00 $2,122.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $23,342.00 $0.00 $23,342.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $360.00 $0.00 $160.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $650.00 $0.00 $650.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $5,470.00 $0.00 $0.00 $5,470.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $300.00 $0.00 $0.00 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $6,780.00 $0.00 $810.00 $5,970.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $76,844.01 $4,336.21 $1,621.93 $32,933.60 $30,982.41 $6,969.86 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $3,769.16 $433.62 $162.19 $504.72 $1,971.64 $696.99 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $80,613.17 $4,769.83 $1,784.12 $33,438.32 $32,954.05 $7,666.85 $0.00 $0.00 $0.00 $0.00 $0.00
*Arcadis solicited bids from three licensed waste haulers for the off-site transportation and disposal of IDW. Although
EnviroServe was the low bid, recent service issues resulted in selecting Cliff Berry, Inc. as the winning bidder.
REV: 02/03 CEF ARCADIS Page 2
SITE : DMS Starke SUBTASK 2: Off-Site Impacts Figures
DATE: *1/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title) Principal (JP) PE review 2
Staff Eng (ZV) Figure and table development 8
Drafter-Designer / BO Drafting 3
Project Asst / MMc Report deliverable preparation 2
TOTAL LABOR 15
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals NAME OF COMPANY Direct-push services $0.00 Lump Sum 1 $0.00 NAME OF COMPANY Drilling services (DPT, MAG wells, SBs, VPs) $0.00 Lump Sum 0 $0.00 NAME OF COMPANY IDW $0.00 Drum 1 $0.00 NAME OF COMPANY On-site Mobile Laboratory analysis $0.00 Lump Sum 0 $0.00 NAME OF COMPANY Utility Locate / GPR Survey $0.00 Lump Sum 0 $0.00 NAME OF COMPANY Utilities -Telemetry $0.00 Per Month 0 $0.00
Handling Fee $0.00 Per Month 1 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous $150.00 1.00 0 $0.00 TRPH FL PRO Soil $88.00 1.00 0 $0.00 SVOCs 8270 Soil/Sediment $260.00 1.00 0 $0.00 1 RCRA Metal (Pb) 6020 Soil/Sediment $14.00 1.00 0 $0.00 1 RCRA Metal (Hg) 7470 Soil/Sediment $28.00 1.00 0 $0.00 Herbicides 8151 Soil $155.00 1.00 0 $0.00 Organochlorine Pesticides / PCBs 8081/8082 Soil/Sediment $175.00 1.00 0 $0.00 Dioxins/Dibenzofurans 8290 Soil $950.00 1.00 0 $0.00 total Cyanide 335.4 Soil/Sediment $43.00 1.00 0 $0.00 total Phenols 420.2 Soil $35.00 1.00 0 $0.00 Priority Pollutant Organics Full Suite Aqueous $735.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00 Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals PPE Level D $35.00 Per Man Day 0 $0.00 PPE Level C $150.00 Per Man Day 0 $0.00 PPE Level B $230.00 Per Man Day 0 $0.00
Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items PID/FID Combo or FID $125.00 Per Day 0 $0.00 PID/FID Combo or FID $500.00 Per Week 0 $0.00 Thermal Anemometer $33.00 Per Day 0 $0.00 Vacuum Gauges (low, med & high) $19.00 Per Day 0 $0.00 Bailer, HDPE, Disp $7.00 Per Bailer 0 $0.00 Water Level: Electric Tape $25.00 Per Day 0 $0.00 Water Level: Electric Tape $100.00 Per Week 0 $0.00 Bladder Pump $134.00 Per Day 0 $0.00 Peristaltic Pump (w/bat) $30.00 Per Day 0 $0.00 Submersible Pump, 2" electric $80.00 Per Day 0 $0.00 Multimeter (pH, Temp, Cond, DO, Orp) $105.00 Per Day 0 $0.00 Turbidity Meter $27.00 Per Day 0 $0.00 Hand Auger $12.00 Per Day 0 $0.00 Terra Cores $11.00 Each 0 $0.00 Tedlar Bags $20.00 Each 0 $0.00 Survey Station transit/rod/level/tape 50 Per Day 0 $0.00
Portable Compressor 50 Per Day 0 $0.00
Portable Generator 5KW 70 Per Day 0 $0.00
Padlocks 3.4 Each 0 $0.00
Tubing, Poly/HDPE $0.30 Per Foot 0 $0.00 Tubing, Silicon 3/16x3/8 $3.00 Per Foot 0 $0.00 Miscellaneous Expendables $40.00 Per Day 0 $0.00 PID (ppbRae) $110.00 Per Day 0 $0.00 55-gallon Drum $100.00 Each 0 $0.00 Regenerative Blower $180.00 Per Day 0 $0.00 ColorTec Sampling Pump $80.00 Per Week 0 $0.00 PCE ColorTec tubes (hi or low range) $90.00 Box of 10 0 $0.00 [add'l equipment] $0.00 [Unit] 0 $0.00
Total Equipment Items: $0.00 Equipment Kits Site Reconnaissance Kit $150.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 0 $0.00
Hydrogeological Evaluation Kit $295.00 Day 0 $0.00
Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00
Deep Groundwater Sampling Kit $415.00 Day 0 $0.00
Shallow Groundwater / Soil Vapor Screening Kit $290.00 Day 0 $0.00
Soil Assessment Kit $175.00 Day 0 $0.00 Soil Vapor Sampling Kit $290.00 Day 0 $0.00 Construction/O&M Supplies $75.00 Day 0 $0.00 Soil Sampling Kit (through concrete) $235.00 Day 0 $0.00 Construction/O&M/Pilot Test Kit $360.00 Day 0 $0.00 MAGS Investigation Kit $500.00 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIP 0
SUBTASK 3: MW Installation
DATE: *1/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title) Principal (JP) Field & FDEP Communications,owner communications 3
Staff Eng (ZV) Field support (4) 4
Scientist (BN) Prep (2), Round Trip Travel (5), Utility Clearance Oversight (4), Drilling oversight (16) 29
Technician (JAR) Prep (2), Round Trip Travel (5), Mowing Site (16) demob, paperw 25
Project Asst / MMc Data tracking 2
TOTAL LABOR 63
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
BN Van/Truck $120.00 Per Day 3 $360.00 $360.00
JAR Van/Truck $120.00 Per Day 3 $360.00 $360.00
TOTAL VEHICLE $720.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
BN $36.00 Per Day 2 $72.00
JAR $36.00 Per Day 2 $72.00
Hotel Category/Staff Rate Unit Usage Totals
BN $175.00 Per Day 2 $350.00
JAR $175.00 Per Day 2 $350.00
Total Meal/Hotel: $844.00
TOTAL PER DIEM $844.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals Leppo Rents Bush Hogging equip $1,973.05 Lump Sum 1 $1,973.05
Total Equip.: $1,973.05 Services Procurement
Name Purpose Rate Units Usage Totals PDS Drilling Services $15,635.00 Lump Sum 1 $15,635.00 Cliff Berry* IDW $3,525.00 Lump Sum 1 $3,525.00 Landmark Professiona land survey $1,500.00 Lump Sum 1 $1,500.00 Blood Hound Utility Locate / GPR Survey $560.00 Lump Sum 1 $560.00 NAME OF COMPANY Utilities -Telemetry $0.00 Per Month 0 $0.00
Handling Fee $0.00 Per Month 1 $0.00
Total Services: $21,220.00
TOTAL $23,193.05
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous $150.00 1.00 0 $0.00
TRPH FL PRO Soil $88.00 1.00 0 $0.00
SVOCs 8270 Soil/Sediment $260.00 1.00 0 $0.00
1 RCRA Metal (Pb) 6020 Soil/Sediment $14.00 1.00 0 $0.00
1 RCRA Metal (Hg) 7470 Soil/Sediment $28.00 1.00 0 $0.00
Herbicides 8151 Soil $155.00 1.00 0 $0.00
Organochlorine Pesticides / PCBs 8081/8082 Soil/Sediment $175.00 1.00 0 $0.00
Dioxins/Dibenzofurans 8290 Soil $950.00 1.00 0 $0.00 total Cyanide 335.4 Soil/Sediment $43.00 1.00 0 $0.00 total Phenols 420.2 Soil $35.00 1.00 0 $0.00
Priority Pollutant Organics Full Suite Aqueous $735.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Item Rate Unit Usage Totals PPE Level D $35.00 Per Man Day 0 $0.00
PPE Level C $150.00 Per Man Day 0 $0.00
PPE Level B $230.00 Per Man Day 0 $0.00
Total PPE: $0.00 Expendables Miscellaneous Expendables 2 staff, 2 days each $40.00 Per Day 4 $160.00
Total Expendables: $160.00 Equipment Items PID/FID Combo or FID $125.00 Per Day 0 $0.00
PID/FID Combo or FID $500.00 Per Week 0 $0.00
Thermal Anemometer $33.00 Per Day 0 $0.00
Vacuum Gauges (low, med & high) $19.00 Per Day 0 $0.00
Bailer, HDPE, Disp $7.00 Per Bailer 0 $0.00
Water Level: Electric Tape $25.00 Per Day 0 $0.00
Water Level: Electric Tape $100.00 Per Week 0 $0.00
Bladder Pump $134.00 Per Day 0 $0.00
Peristaltic Pump (w/bat) $30.00 Per Day 0 $0.00
Submersible Pump, 2" electric $80.00 Per Day 0 $0.00
Multimeter (pH, Temp, Cond, DO, Orp) $105.00 Per Day 0 $0.00
Turbidity Meter $27.00 Per Day 0 $0.00
Hand Auger $12.00 Per Day 0 $0.00
Terra Cores $11.00 Each 0 $0.00
Tedlar Bags $20.00 Each 0 $0.00
Survey Station transit/rod/level/tape $50.00 Per Day 0 $0.00
Portable Compressor $50.00 Per Day 0 $0.00
Portable Generator 5KW $70.00 Per Day 0 $0.00
Padlocks $3.40 Each 0 $0.00
Tubing, Poly/HDPE $0.30 Per Foot 0 $0.00
Tubing, Silicon 3/16x3/8 $3.00 Per Foot 0 $0.00
Miscellaneous Expendables $40.00 Per Day 0 $0.00
PID (ppbRae) $110.00 Per Day 0 $0.00
55-gallon Drum $100.00 Each 0 $0.00
Regenerative Blower $180.00 Per Day 0 $0.00
ColorTec Sampling Pump $80.00 Per Week 0 $0.00
PCE ColorTec tubes (hi or low range) $90.00 Box of 10 0 $0.00
[add'l equipment] $0.00 [Unit] 0 $0.00
Total Equipment Items: $0.00 Equipment Kits
Site Reconnaissance Kit $150.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 2 $650.00
Hydrogeological Evaluation Kit $295.00 Day 0 $0.00
Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00
Deep Groundwater Sampling Kit $415.00 Day 0 $0.00
Shallow Groundwater / Soil Vapor Screening Kit $290.00 Day 0 $0.00
Soil Assessment Kit $175.00 Day 0 $0.00
Soil Vapor Sampling Kit $290.00 Day 0 $0.00
Construction/O&M Supplies $75.00 Day 0 $0.00
Soil Sampling Kit (through concrete) $235.00 Day 0 $0.00
Construction/O&M/Pilot Test Kit $360.00 Day 0 $0.00
MAGS Investigation Kit $500.00 Day 0 $0.00
Total Equipment Kits: $650.00
TOTAL EQUIPME 810
SUBTASK 4: Semi-Annual GW Monitoring
DATE: *1/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title) Principal (JP) Field & FDEP Communications,owner communications 3
Staff Eng (ZV) Field support (8) 8
Technician (DW) Prep (2), Round Trip Travel (5), WLs and MW Sampling Event (48) demob, paperwork (2) 57
Technician (DD) Prep (2), Round Trip Travel (5), WLs and MW Sampling Event (48) demob, paperwork (2) 57
Scientist (AT) Prep (2), Round Trip Travel (5), WLs and MW Sampling Event (48) demob, paperwork (2) 57
Scientist (AB1) Prep (2), Round Trip Travel (5), WLs and MW Sampling Event (48) demob, paperwork (2) 57
Project Asst / MMc Data tracking 3
TOTAL LABOR 242
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
4 staff, 1 week Van/Truck $480.00 Per Week 4 $1,920.00 $1,920.00
TOTAL VEHICLE $1,920.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
DW $36.00 Per Day 4 $144.00
AB1 $36.00 Per Day 4 $144.00
DD $36.00 Per Day 4 $144.00
AT $36.00 Per Day 4 $144.00
Hotel Category/Staff Rate Unit Usage Totals
DW $175.00 Per Day 4 $700.00
AB1 $175.00 Per Day 4 $700.00
DD $175.00 Per Day 4 $700.00
AT $175.00 Per Day 4 $700.00
Total Meal/Hotel: $3,376.00
TOTAL PER DIEM $3,376.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals NAME OF COMPANY Direct-push services $0.00 Lump Sum 1 $0.00 NAME OF COMPANY Drilling services (DPT, MAG wells, SBs, VPs) $0.00 Lump Sum 0 $0.00 EnviroServe IDW $110.00 Drum 0 $0.00 NAME OF COMPANY On-site Mobile Laboratory analysis $0.00 Lump Sum 0 $0.00 NAME OF COMPANY Utility Locate / GPR Survey $0.00 Lump Sum 0 $0.00 NAME OF COMPANY Utilities -Telemetry $0.00 Per Month 0 $0.00
Handling Fee $0.00 Per Month 1 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs USING FDEP LAB
Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous $150.00 1.00 0 $0.00
TRPH FL PRO Soil $88.00 1.00 0 $0.00
SVOCs 8270 Soil/Sediment $260.00 1.00 0 $0.00
1 RCRA Metal (Pb) 6020 Soil/Sediment $14.00 1.00 0 $0.00
1 RCRA Metal (Hg) 7470 Soil/Sediment $28.00 1.00 0 $0.00
Herbicides 8151 Soil $155.00 1.00 0 $0.00
Organochlorine Pesticides / PCBs 8081/8082 Soil/Sediment $175.00 1.00 0 $0.00
Dioxins/Dibenzofurans 8290 Soil $950.00 1.00 0 $0.00 total Cyanide 335.4 Soil/Sediment $43.00 1.00 0 $0.00 total Phenols 420.2 Soil $35.00 1.00 0 $0.00
Priority Pollutant Organics Full Suite Aqueous $735.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Item Rate Unit Usage Totals PPE Level D $35.00 Per Man Day 0 $0.00
PPE Level C $150.00 Per Man Day 0 $0.00
PPE Level B $230.00 Per Man Day 0 $0.00
Total PPE: $0.00 Expendables Miscellaneous Expendables 5 days $40.00 Per Day 5 $200.00
Total Expendables: $200.00 Equipment Items PID/FID Combo or FID $125.00 Per Day 0 $0.00
PID/FID Combo or FID $500.00 Per Week 0 $0.00
Thermal Anemometer $33.00 Per Day 0 $0.00
Vacuum Gauges (low, med & high) $19.00 Per Day 0 $0.00
Bailer, HDPE, Disp $7.00 Per Bailer 0 $0.00
Water Level: Electric Tape $25.00 Per Day 0 $0.00
Water Level: Electric Tape $100.00 Per Week 0 $0.00
Bladder Pump $134.00 Per Day 0 $0.00
Peristaltic Pump (w/bat) $30.00 Per Day 0 $0.00
Submersible Pump, 2" electric $80.00 Per Day 0 $0.00
Multimeter (pH, Temp, Cond, DO, Orp) $105.00 Per Day 0 $0.00
Turbidity Meter $27.00 Per Day 0 $0.00
Hand Auger $12.00 Per Day 0 $0.00
Terra Cores $11.00 Each 0 $0.00
Tedlar Bags $20.00 Each 0 $0.00
Survey Station transit/rod/level/tape $50.00 Per Day 0 $0.00
Portable Compressor $50.00 Per Day 0 $0.00
Portable Generator 5KW $70.00 Per Day 0 $0.00
Padlocks $3.40 Each 0 $0.00
Tubing, Poly/HDPE $0.30 Per Foot 0 $0.00
Tubing, Silicon 3/16x3/8 $3.00 Per Foot 0 $0.00
Miscellaneous Expendables $40.00 Per Day 0 $0.00
PID (ppbRae) $110.00 Per Day 0 $0.00
55-gallon Drum $100.00 Each 3 $300.00
Regenerative Blower $180.00 Per Day 0 $0.00
ColorTec Sampling Pump $80.00 Per Week 0 $0.00
PCE ColorTec tubes (hi or low range) $90.00 Box of 10 0 $0.00
[add'l equipment] $0.00 [Unit] 0 $0.00
Total Equipment Items: $300.00 Equipment Kits
Site Reconnaissance Kit $150.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 0 $0.00
Hydrogeological Evaluation Kit $295.00 Day 0 $0.00
Shallow Groundwater Sampling Kit $1,160.00 Week 4 $4,640.00
Deep Groundwater Sampling Kit $415.00 Day 2 $830.00
Shallow Groundwater / Soil Vapor Screening Kit $290.00 Day 0 $0.00
Soil Assessment Kit $175.00 Day 0 $0.00
Soil Vapor Sampling Kit $290.00 Day 0 $0.00
Construction/O&M Supplies $75.00 Day 0 $0.00
Soil Sampling Kit (through concrete) $235.00 Day 0 $0.00
Construction/O&M/Pilot Test Kit $360.00 Day 0 $0.00
MAGS Investigation Kit $500.00 Day 0 $0.00
Total Equipment Kits: $5,470.00
TOTAL EQUIP 5970
SUBTASK 5: Semi-Annual GW Monitoring Report
DATE: *1/24/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title) Principal / JP Finalize Report, PE Review 8
Staff Eng/ ZV Semi-Annual Report Development 24
Staff Sci / EAB Semi-Annual Report Development 12
Drafter-Designer / BO Report figures 16
Project Asst / MMc Report deliverable preparation 8
TOTAL LABOR 68
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals NAME OF COMPANY Direct-push services $0.00 Lump Sum 1 $0.00 NAME OF COMPANY Drilling services (DPT, MAG wells, SBs, VPs) $0.00 Lump Sum 0 $0.00 NAME OF COMPANY IDW $0.00 Drum 1 $0.00 NAME OF COMPANY On-site Mobile Laboratory analysis $0.00 Lump Sum 0 $0.00 NAME OF COMPANY Utility Locate / GPR Survey $0.00 Lump Sum 0 $0.00 NAME OF COMPANY Utilities -Telemetry $0.00 Per Month 0 $0.00
Handling Fee $0.00 Per Month 1 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous $150.00 1.00 0 $0.00
TRPH FL PRO Soil $88.00 1.00 0 $0.00
SVOCs 8270 Soil/Sediment $260.00 1.00 0 $0.00
1 RCRA Metal (Pb) 6020 Soil/Sediment $14.00 1.00 0 $0.00
1 RCRA Metal (Hg) 7470 Soil/Sediment $28.00 1.00 0 $0.00
Herbicides 8151 Soil $155.00 1.00 0 $0.00
Organochlorine Pesticides / PCBs 8081/8082 Soil/Sediment $175.00 1.00 0 $0.00
Dioxins/Dibenzofurans 8290 Soil $950.00 1.00 0 $0.00 total Cyanide 335.4 Soil/Sediment $43.00 1.00 0 $0.00 total Phenols 420.2 Soil $35.00 1.00 0 $0.00
Priority Pollutant Organics Full Suite Aqueous $735.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Item Rate Unit Usage Totals PPE Level D $35.00 Per Man Day 0 $0.00
PPE Level C $150.00 Per Man Day 0 $0.00
PPE Level B $230.00 Per Man Day 0 $0.00
Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items PID/FID Combo or FID $125.00 Per Day 0 $0.00
PID/FID Combo or FID $500.00 Per Week 0 $0.00
Thermal Anemometer $33.00 Per Day 0 $0.00
Vacuum Gauges (low, med & high) $19.00 Per Day 0 $0.00
Bailer, HDPE, Disp $7.00 Per Bailer 0 $0.00
Water Level: Electric Tape $25.00 Per Day 0 $0.00
Water Level: Electric Tape $100.00 Per Week 0 $0.00
Bladder Pump $134.00 Per Day 0 $0.00
Peristaltic Pump (w/bat) $30.00 Per Day 0 $0.00
Submersible Pump, 2" electric $80.00 Per Day 0 $0.00
Multimeter (pH, Temp, Cond, DO, Orp) $105.00 Per Day 0 $0.00
Turbidity Meter $27.00 Per Day 0 $0.00
Hand Auger $12.00 Per Day 0 $0.00
Terra Cores $11.00 Each 0 $0.00
Tedlar Bags $20.00 Each 0 $0.00
Survey Station transit/rod/level/tape 50 Per Day 0 $0.00
Portable Compressor 50 Per Day 0 $0.00
Portable Generator 5KW 70 Per Day 0 $0.00
Padlocks 3.4 Each 0 $0.00
Tubing, Poly/HDPE $0.30 Per Foot 0 $0.00
Tubing, Silicon 3/16x3/8 $3.00 Per Foot 0 $0.00
Miscellaneous Expendables $40.00 Per Day 0 $0.00
PID (ppbRae) $110.00 Per Day 0 $0.00
55-gallon Drum $100.00 Each 0 $0.00
Regenerative Blower $180.00 Per Day 0 $0.00
ColorTec Sampling Pump $80.00 Per Week 0 $0.00
PCE ColorTec tubes (hi or low range) $90.00 Box of 10 0 $0.00
[add'l equipment] $0.00 [Unit] 0 $0.00
Total Equipment Items: $0.00 Equipment Kits Site Reconnaissance Kit $150.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 0 $0.00
Hydrogeological Evaluation Kit $295.00 Day 0 $0.00
Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00
Deep Groundwater Sampling Kit $415.00 Day 0 $0.00
Shallow Groundwater / Soil Vapor Screening Kit $290.00 Day 0 $0.00
Soil Assessment Kit $175.00 Day 0 $0.00
Soil Vapor Sampling Kit $290.00 Day 0 $0.00
Construction/O&M Supplies $75.00 Day 0 $0.00
Soil Sampling Kit (through concrete) $235.00 Day 0 $0.00
Construction/O&M/Pilot Test Kit $360.00 Day 0 $0.00
MAGS Investigation Kit $500.00 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIP 0
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
Arcadis U.S., Inc.
4300 W Cypress Street Suite 450 Tampa Florida 33607 Phone: 813 903 3100 Fax: 813 350 9046 www.arcadis.com
FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062
1/5
Mr. Jeff Newton Site Investigation Section Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4515 Tallahassee, Florida 32399-2400
Date: November 30, 2023 Our Ref: TBD Subject: Proposal for Supplemental Site Assessment and Semi-annual
Groundwater Monitoring Activities DMS Facility - Starke 14281 US Highway 301 South Starke, Bradford County, FL
ERIC_6157 (56SL)
Dear Mr. Newton, Arcadis U.S., Inc. (Arcadis) is pleased to submit the following proposal/cost estimate to complete the following activities at the DMS Facility in Starke, FL (Site): off-site notification of impacted properties, monitor well installation, Site mowing, semi-annual groundwater monitoring, and preparation of a Semi-Annual Monitoring Report.
This proposal includes the scope of work pursuant to recent communications with the Florida Department of Environmental Protection (FDEP) and estimated costs with a schedule for completion. The following tasks were developed in accordance with Chapter 62-780 F.A.C. and the applicable standard operating procedures (SOP)
(DEP-SOP-001/01).
SCOPE OF WORK
Task 1: Project Management
Project management includes technical support and general administrative and health and safety tasks related to the items below.
Task 2: Off-Site Notification Package
Based on the analytical results from the supplemental site assessment and groundwater sampling events conducted between April 2023 and May 2023, an additional eight Off-Site properties not included within the current Temporary Point of Compliance (TPOC) boundaries have been identified. This task includes the effort to provide FDEP a plume map showing dashed lines around the monitor wells (MW-106 & MW-109 cluster) and the creation of a table showing all the previously notified properties within the historical TPOC extents, the newly impacted properties, and adjacent properties that can be inferred to be impacted. This information will be used in the future for the preparation of off-site notification update packages per Rule 62-780.220 F.A.C. A proposal for costs associated with the actual TPOC notification update package will be provided under separate cover when requested by FDEP.
Florida Department of Environmental Protection November 30, 2023
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
2/5
Task 3: Monitor Well Installation
Based on the data collected during the May 2023 semi-annual groundwater monitoring event, Arcadis has identified the need for installation of additional monitor wells to further define the Constituent of Concern (COC) impacts associated with the Site. Three additional monitor wells, as depicted on the attached figure (Figure 1, Attachment 1), are recommended to be installed prior to the performance of the next semiannual monitoring event to delineate plume extents and to determine the distribution of COC mass more accurately within the constituent plumes. Specifically, the following monitor wells are proposed:
Two monitor wells (MW-115 (35-45) and MW-115 (45-55)) are proposed within the Lower Shallow Zone and Intermediate Zone downgradient of the MW-109 well cluster. Arcadis recommends installing the additional wells within the western right-of-way (ROW) of SE 44th Avenue.
One monitor well (MW-116 (40-50)) is proposed south of MW-106. Access and final location of this well will be coordinated with FDEP.
All monitor wells will be constructed of 2-inch Schedule-40 PVC, with the lower 10- feet comprised of 10-slot screen. The monitor wells will be installed with a 20/30 filter sand pack, a two-foot 30/65 choker sand seal, and grouted to surface. The monitor wells will be installed within 8-inch bolt-down manhole, in a 2-foot by 2-foot concrete pad. A summary of monitor well construction is provided in the table below:
Table 1 – Proposed Monitor Well Details
Well ID Aquifer Zone Well Diameter (inches)
Screened Interval (ft-bls)
MW-115 (35-45) Shallow Upper Aquifer Zone 2.00 35 to 45
MW-115 (45-55) Intermediate Aquifer Zone 2.00 45 to 55
MW-116 (40-50) Intermediate Aquifer Zone 2.00 40 to 50
Monitor well construction details proposed are based on available data, final construction details of the monitor wells will be determined based on soil lithology data (collected from the deepest boring at each proposed cluster) and field observations. Arcadis solicited four bids from qualified and licensed drillers to perform the work. Two of the drillers were unable to provide a bid, as they did not have a sonic drill rig. Based on cost and availability, Preferred Drilling Solutions (PDS) was selected as the winning bidder. Monitor wells will be developed for approximately 30-60 minutes, until the purged water is relatively clear and sediment-free. It is estimated that four drums of non-hazardous Investigation Derived Waste (IDW) groundwater and ten drums of non-hazardous IDW soils will be generated during the well installation/ development event. Arcadis solicited bids from three licensed waste haulers for the off-site transportation and disposal of IDW. Although EnviroServe was the low bid, recent service issues resulted in selecting Cliff Berry, Inc. as the winning bidder.
Prior to beginning intrusive work for the installation of the monitor wells, in addition to initiating utility marking via Sunshine 811, a Ground Penetrating Radar (GPR) survey will be performed to minimize the potential for utility strikes within the right-of-way and on the private property location. Arcadis requested bids from three GPR companies and selected Blood Hound as the winning bidder.
Following installation and development, the three new monitor wells will be surveyed by a surveyor licensed in the state of Florida. The surveyor will collect latitudinal and longitudinal coordinates and the top of casing (TOC)
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
3/5 elevation from each monitor well. Bids were solicited from three qualified professional land surveyors, with Landmark Engineering & Surveying Corporation selected as the winning bid.
As the site is no longer occupied, routine maintenance of the Site is no longer performed. Prior to monitor well installation activities, Arcadis will perform the bush hogging of access pathways to monitor wells on the Site property in preparation for monitor will installation and groundwater monitoring activities. Bids were solicited from three equipment rental companies, with Lepp Rents selected as the winning bid.
Arcadis will provide FDEP with a brief field work summary memorandum (with field documentation and photographs) approximately 10 days following the completion of the monitor well installation event. Bids from the various subcontractors are included as Attachment 2.
Task 4: Semi-Annual Groundwater Monitoring Event
As performed during the May 2023 monitoring event, depth-to-water (DTW) levels will be collected from all accessible monitor wells (approximately 140 locations) utilizing a water level probe relative to each top of well casing. The data will be used to determine relative groundwater elevations and gradient conditions within each of the respective aquifer zones.
Following the completion of the groundwater elevation gauging, 86 (81 existing MWs sampled in May 2023 + 2 existing MWs recommended in September 2023 GMR +3 proposed MWs) Site monitor wells will be sampled during the event. The 83 existing monitor wells will be sampled using the low-flow sampling methodology (equipment volume purge) to improve efficiency and minimize the volume of IDW generated. As discussed with FDEP, the conventional well volume purge technique will be utilized to sample the three new/ proposed monitor wells. At these three locations a minimum of one well volume will be purged and then parameter readings will be collected at ¼-well volume intervals until stabilization has been achieved. As previously discussed with FDEP, five monitor wells (MW-107 (105-115), MW-108 (115-125), CMW-D (115-125), CMW-G (115-125)), will be sampled using bailers due to the small diameter of the wells and observed DTWs (approximately 60 ft bls).
Samples will be submitted to the FDEP Central Lab for analysis. All samples will be analyzed for CVOCs per USEPA Method 8260B, four samples will be analyzed for 1,4-dioxane by 8260 SIM-ID, and 31 samples will be analyzed for total organic carbon (TOC) by standard method SM 5310B. Monitor wells selected for 1,4-dioxane analysis were those with detections above 0.35 ug/L (Florida Department of Health Advisory Level) and monitor wells selected for TOC analysis were those that exhibited at least one CVOC compound above its’ respective FDEP GCTL during the May 2023 monitoring event. A total of six duplicate samples (4 – CVOC and 2 – TOC) will be collected for QA/QC analysis. This proposal assumes that approximately 3 drums of non-hazardous purge water will be generated during the implementation of Task 4. It is assumed that Arcadis can utilize the existing waste profile for the disposal of purge water.
Arcadis will provide FDEP with a brief field work summary memorandum (with field documentation and photographs) approximately 10 days following the completion of the sampling event.
Task 5: Reporting
A Semi-Annual Monitoring Report will be prepared, certified by a Professional Engineer or Geologist, and submitted to FDEP within 60 days of the receipt of laboratory data. This report will summarize the results of field activities completed at the Site and include tables and figures, sample analytical reports, field documentation, and recommendations for further assessment or closure options.
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
4/5
SCHEDULE
Arcadis will begin coordinating schedules immediately following receipt of a signed Task Assignment. The proposed deliverable schedule based on Arcadis receipt of the Task Assignment (TA) by October 31, 2023, and is as follows:
Off-Site notification package to FDEP – November 10, 2023 (10 days after receipt of TA)
Monitor Well Installation Field Summary – December 1, 2023 (10 days after drilling completion).
Semi-Annual Groundwater Monitoring Field Summary – December 31, 2023 (10 days after groundwater sampling completion).
Semi-Annual Groundwater Monitoring Report (SGWMR) – estimated April 19, 2024 (60 days after receiving groundwater sampling data from the laboratory. It is assumed that data will be received 60 days after completion of the monitoring event).
COST ESTIMATE
Level of Effort (LOE) Forms and a Cost Estimate Form (CEF) that present estimated project costs are enclosed as Attachment 3.
This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.
www.arcadis.com DMS Site SSA Proposal - Nov 2023
5/5
CLOSING REMARKS
Arcadis appreciates the opportunity to assist the FDEP-SOLCP at this Site. If you have any questions or wish to discuss this proposal, please contact the undersigned.
Sincerely, Arcadis U.S., Inc.
Gus Suarez, P.E.
Project Manager
Email: gus.suarez@arcadis.com Direct Line: 813.353.5778 Mobile: 813.205.4703
CC. John F. Perella, P.E. (Arcadis Project Engineer)
Enclosures:
Attachment 1 - Proposed Monitoring Wells Location Map Attachment 2 - Subcontractor Quotes Attachment 3 - CEF-LOE
ATTACHMENT 1
Proposed Monitoring Wells Location Map
US HIGHWAY 301 N.
US HIG
HW
AY 301 S.
US HIGHW
AY 301 N.
SE 48 AVE.
SW 136 WAY
SE
ST
DMS
PROPERTY
DEERWOOD
SUBDIVISION
MW-U
MW-105
(45-55)
MW-105
(18-28)
MW-S
MWINT-10
MWSLZ-4
MWINT-7
MWSLZ-1MWSUR-12MWSUR-6
MWSUR-4
MWSUR-5
MWSUR-7
MWSUR-17 MWSUR-8
MWSUR-9
MWSUR-10
MWSUR-11
MWSUR-14MWSUR-13
MWSUR-15
MWSUR-16
MWINT-11
MWSLZ-5
MWINT-1
CMW-CMWSLZ-2
CMW-B
MW-103
MWINT-3
CMW-D-53
CMW-D
MW-102
(26-36)
MWINT-13
MWSLZ-7
CMW-F
MWINT-12
MWSLZ-6
CMW-G
MWINT-14
CMW-H
CMW-Y
CMW-Z
CMW-VCMW-L
CMW-Q
CMW-P
CMW-O
CMW-N
CMW-J
CMW-M
CMW-K
CMW-I
CMW-R
MW-107
(55-65)
MW-107
(105-115)
MW-108
(55-65)
MW-108
(115-125)
CMW-W
MW-X
SE
AV
E.
LONE VALLEY
SE 137 TERR.
SE 137 ST.
CMW-E
CMW-T
MWSLZ-3
MWINT-9
CMW-A
MWINT-2
MWINT-1
MWINT-8
MW-101
MW-100
MW-106
MW-104
MW-102
(35-45)
MW-112
MW-111
MW-109
MW-110
MW-114
MW-113
230 98
16 170 110 110
140 350 300 [290]
9.1 7.5 [7.3]
4.2 26 10 39
85 19 9.2 17
69 130 50 22 360 360 360 350
7.3 14 11 8.1 9.2
200 150 180 170 480 640 650 660 12 14 20 21
1.5 2.1 2 2.8
60 59 38 821715 14 17
8.5
13 12 14 18 3.0 18 13 12
8.2 10 13
110 180 220 170 30 42 46 41
4.2 4.7 62 67 27.7 10
16 13 100 110
6.0 7.2 6.5 3.8 22 36 25 18
87.2
48.5 90
39 36
19 20 22 16
MW-116
(40-50)
MW-115
(35-45)
MW-115
(45-55)
PROPOSED
MONITOR WELL LAYOUT
FDEP-SIS DMS FACILITY-STARKE, ERIC_6157
14281 U.S. HIGHWAY 301 SOUTH
STARKE, BRADFORD COUNTY, FLORIDA
SEMI-ANNUAL GROUNDWATER MONITORING REPORT
1C
IT
Y:
B
B, F
L
D
IV
/G R
O U
P:
E
N
B:
B .O
LI
VA
O pt
P
IC
O pt
P
M
R eq d)
T M
: Z .V
AI
LY
R :(O pt )O
N
;O
FF
R
EF
C :\U se rs
\b ol iv a\
AC
C
D oc s\ Ar ca di s\
AU
S-
FD
EP
-S
IS
-D
EE
R
W O
O D
S U
BD
IV
IS
IO
N -S
TA
R
KE
F lo rid a\ Pr oj ec t F ile s\
\0
1- In
P ro gr es s\
-D W
G \F
D
EP
SI
S-
D ee rw oo d
-S
M .d w g
L
AY
O U
T:
O
C T2
3- F1
_P M
W -G
W Q
I 2
S
AV
ED
: 1
0/ 5/
1:
A
AC
AD
VE
R
: 2 4.
1S (L
M S
TE
C
H
P
AG
ES
ET
U P:
P
LO
TS
TY
LE
TA
BL
E:
AC
S-
C O
LO
R
_A N
AL
YT
IC
AL
.C
TB
PL
O
TT
ED
: 1
0/ 5/
2:
P
BY
: O
LI
VA
, B R
IA
N
FIGURE
LEGEND
PARCEL BOUNDARY
SUBJECT PROPERTY PARCEL BOUNDARY
GENERAL NOTES:
1. Aerial image from USGS Digital Orthographic Quarter
Quadrangle, 2022.
2. Parcel boundaries from Bradford County Property
Appraiser GIS database.
SURFICIAL ZONE MONITOR WELL
SHALLOW UPPER ZONE MONITOR WELL
SHALLOW LOWER ZONE MONITOR WELL
INTERMEDIATE ZONE MONITOR WELL
HAWTHORN MONITOR WELL
CLUSTER MONITOR WELL
INJECTION WELL
PRIVATE WELL
APPROXIMATE EXTENT OF PCE
IN GROUNDWATER ABOVE FDEP GCTL (3 ug/L)
APPROXIMATE EXTENT OF TCE
IN GROUNDWATER ABOVE FDEP GCTL (3 ug/L)
APPROXIMATE EXTENT OF 1,1-DCE
IN GROUNDWATER ABOVE FDEP GCTL (7 ug/L)
APPROXIMATE EXTENT OF VC
IN GROUNDWATER ABOVE FDEP GCTL (1 ug/L)
APPROXIMATE EXTENT OF CIS-1,2-DCE
IN GROUNDWATER ABOVE FDEP GCTL (70 ug/L)
LEGEND NOTES:
1. Bold values indicate FDEP GCTL exceedance
2. Bold/Shaded values indicate FDEP NADC exceedance,
3. "I" indicates result is between laboratory Practical Quantitation Limit
(PQL) and laboratory Method Detection Limit (MDL),
4. "U" indicates compound was analyzed for but not detected.
5. "V" indicates laboratory estimated value.
6. "[ ]" indicates a field duplicate sample.
7. All results reported in micrograms per liter (ug/L).
8. GCTL=Florida Department of Environmental Protection
Groundwater Cleanup Target Level per Chapter 62-777 F.A.C.
9. NADC=Florida Department of Environmental Protection Natural
Attenuation Default Concentration Level per Chapter 62-777 F.A.C.
450' 900'0
GRAPHIC SCALE
PROPOSED INTERMEDIATE ZONE
MONITOR WELL
PROPOSED CLUSTER MONITOR WELL
ATTACHMENT 2
Subcontractor Quotes
Clean Harbors Environmental Services, Inc.
7001 Kilo Avenue Bartow, FL 33830 www.cleanharbors.com
October 3, 2023
Attn: Mr. Zackary Vail, P.E.
Arcadis 4300 West Cypress Street Tampa, FL 33607
Quote #4431044, Florida Department of Environmental Protection, Starke, FL
Dear Mr. Vail:
Thank you for considering Clean Harbors Environmental Services, Inc. (Clean Harbors) for your waste management needs. We are pleased to provide you with pricing for the following waste streams. This quotation is based upon the information that you have provided.
We offer our clients a broad spectrum of environmental services and the ability to dispose of hazardous material at or through a Clean Harbors' owned and operated facility. In addition to managing your waste streams, a Clean Harbors' professional can assist you with:
• Waste Transportation & Disposal
• Laboratory Chemical Packing
• Field Services
• 24-Hour Environmental Emergency Response
• Industrial Services
• InSite Services
Clean Harbors has the appropriate permits and licenses for the acceptance and disposal of the waste streams identified within this quotation.
I look forward to servicing your environmental needs. When you are ready to place an order, please contact our Customer Service group at 800.444.4244. If you have any questions or need further assistance, you may reach me at the number below.
Sincerely, Tim Lester Clh Account Mgr Phone: 863.370.9585 LESTER.TIMOTHY@cleanharbors.com
"People and Technology Creating a Safer, Cleaner Environment"
DISPOSAL
Profile/ Waste Code Waste Description Qty UOM Price Total
CNO NON HAZARDOUS SOLID 7 55 gallon drum $133.00 $931.00
CNOS NON HAZARDOUS SEMI-SOLIDS 10 55 gallon drum $144.00 $1,440.00
Total $2,371.00
LABOR, EQUIPMENT, AND MATERIALS
Amount Description Qty UOM Days Price Total
1 Loading Demurrage 1 hour n/a $103.00 $103.00
Total $103.00
TRANSPORTATION
Dispatch Location Qty Price UOM Total
Bartow, FL Hub 17 $60.00 container *$1,020.00
*Minimum charge $588.00 per trip.
A demurrage charge of $115.00 per hour will apply as…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .