About this file

This is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S. Inc. under Contract Number HW680. The Task Assignment Number is HW001D and authorizes Arcadis to conduct an environmental assessment of the adjacent property to the Climatrol facility located at 529 South Industry Road, Cocoa, Brevard County, Florida. The project, identified as ERIC_3938, is managed by FDEP Project Manager Theresa Pepe and Arcadis Project Manager Gus Suarez. The assessment is designed to determine if contamination source material exists beyond the Climatrol site boundary and to refine the site conceptual model in preparation for potential remediation activities.

The total Task Assignment value is $35,422.97 on a fixed unit rate basis, with work to be completed by November 21, 2025. The scope includes three subtasks: Project Management (calculated as a percentage of total labor), Off-site Assessment (full-site ground penetrating radar survey, soil and groundwater screening, monitor well installation, and sampling of a pre-existing well if located), and preparation of an Off-Site Assessment Report. Key subcontractors include Cascade Drilling for drilling services ($9,423.00), Site Lines for utility location and GPR survey ($1,700.00), and Erwin for IDW transport and disposal ($500.00). Laboratory analytical costs total $4,745.00 for volatile organic halocarbons testing. The invoice schedule divides payment into two milestones: $28,983.98 upon FDEP approval of fieldwork activities (due 08/29/2025) and $6,438.99 upon approval of the assessment report and supporting documentation (due 10/24/2025).

View the file

Other files

File Type Posted
CN-370000-HW680-DC48ACO2.pdf PDF
CN-370000-HW680-DC038C.pdf PDF
CN-370000-HW680-HW11ACO3.pdf PDF
CN-370000-HW680-DC003A.pdf PDF
CN-370000-HW680-HW03ACO1.pdf PDF
CN-370000-HW680-DC46ACO2.pdf PDF
CN-370000-HW680-DC031C.pdf PDF
CN-370000-HW680-DC49ACO3.pdf PDF
CN-370000-HW680-HW04DCO1.pdf PDF
CN-370000-HW680-DC015B.pdf PDF
CN-370000-HW680-DC015D.pdf PDF
CN-370000-HW680-DC18BCO1.pdf PDF
CN-370000-HW680-HW10ACO3.pdf PDF
CN-370000-HW680-DC031D.pdf PDF
CN-370000-HW680-DC05ACO1.pdf PDF
CN-370000-HW680-DC05BCO1.pdf PDF
CN-370000-HW680-DC06CCO1.pdf PDF
CN-370000-HW680-DC25BCO1.pdf PDF
CN-370000-HW680-DC034A.pdf PDF
CN-370000-HW680-DC009A.pdf PDF
CN-370000-HW680-DC31BCO1.pdf PDF
CN-370000-HW680-DC046B.pdf PDF
CN-370000-HW680-DC047B.pdf PDF
CN-370000-HW680-HW003D.pdf PDF
CN-370000-HW680-DC039B.pdf PDF
CN-370000-HW680-HW22ACO4.pdf PDF
CN-370000-HW680-DC14BCO7.pdf PDF
CN-370000-HW680-SA159CO2.pdf PDF
CN-370000-HW680-HW09ACO1.pdf PDF
CN-370000-HW680-HW05CCO2.pdf PDF
CN-370000-HW680-DC004C.pdf PDF
CN-370000-HW680-DC009C.pdf PDF
CN-370000-HW680-HW05CCO1.pdf PDF
CN-370000-HW680-HW11ACO5.pdf PDF
CN-370000-HW680-HW023A.pdf PDF
CN-370000-HW680-DC042B.pdf PDF
CN-370000-HW680-DC50ACO1.pdf PDF
CN-370000-HW680-DC004B.pdf PDF
CN-370000-HW680-DC40BCO1.pdf PDF
CN-370000-HW680-DC011D.pdf PDF
CN-370000-HW680-DC020B.pdf PDF
CN-370000-HW680-DC42ACO1.pdf PDF
CN-370000-HW680-SA293.pdf PDF
CN-370000-HW680-SA322CO4.pdf PDF
CN-370000-HW680-DC43ACO1.pdf PDF
CN-370000-HW680-PA376CO4.pdf PDF
CN-370000-HW680-DC03BCO2.pdf PDF
CN-370000-HW680-DC37ACO3.pdf PDF
CN-370000-HW680-SA177.pdf PDF
CN-370000-HW680-DC15ACO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW680

HW001D Completion November 21, 2025

Arcadis will conduct an assessment of the adjacent property. All activities will be performed according to the May 21, 2025, Work Plan submitted by Arcadis.

Theresa Pepe 850-245-8966 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Arcadis U.S. Inc.

Arcadis U.S. Inc.

Gus Suarez 813-205-4703

ERIC_3938

529 South Industry Road, Cocoa, Brevard County

Climatrol

✔ $ 35,422.97

$ 35,422.97

Scope of Work

Gus Suarez

Contract Manager

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2025.05.23 11:24:51 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.05.23 09:58:38 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Fieldwork Activities 08/29/2025

Off-site assessment report/IDW manifest/Project Management 10/24/2025

FDEP approval of Fieldwork Activities $ 28,983.98

FDEP approval of Off-site assessment report/IDW manifest/Project Management $ 6,438.99

$ 35,422.97

HW680

HW001D

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Alexis A. Lambert

Secretary

Memorandum

TO: Negotiation File Climatrol State Site No. 168; ERIC_3938 Cocoa, Brevard County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment HW001D (HW680) DATE: May 21, 2025

This Task Assignment authorizes Arcadis to complete an assessment of the former Lombardo property, immediately adjacent to the Climatrol site. The purpose of the assessment is to determine if source material exists beyond the Climatrol site boundary and to refine the site conceptual model in preparation for possible remediation. The new owner of the former Lombardo property provided signed site access to DEP on May 9, 2025. Arcadis anticipates completing the fieldwork in approximately five days.

An off-site assessment report will be submitted as the final deliverable. All work will be performed in accordance with the May 21, 2025, work plan submitted by Doug McGlone of Arcadis.

The final task assignment total is $35,422.97. Arcadis may invoice according to the attached schedule.

Specific negotiated subtasks are as follows:

Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.

Subtask 2: Off-site Assessment This subtask provides funds for a full-site GPR survey, soil and groundwater screening, and monitor well installation at the facility. Additionally, Arcadis will search for reported pre-existing well (MW-15) and sample the well, if found.

Site Lines will provide a GPR survey to check for underground utilities and abnormalities, based on their low bid of three bids solicited.

Climatrol

(ERIC_3938)

Cascade Drilling was selected as the drilling subcontractor based on their low bid of three bids solicited.

Erwin will transport and dispose of IDW. Note: IDW is presumed to be non-hazardous but will be characterized before disposal.

Subtask 3: Off-Site Assessment Report All activities and analytical results obtained during assessment fieldwork will be submitted to DEP as a written report. This report will include appropriate figures, graphs, data tables, etc., and recommendations for additional actions, as needed. IDW manifests will also be provided to DEP as part of the final deliverable.

FDEP COST ESTIMATE

Contractor: Arcadis, U.S., Inc.

Date: 5/21/25

Task #: SubTask 1 Project Management Site: Climatrol SubTask 2 Field Assessment

Activity/Phase: Assessment SubTask 3 Reporting Project Manager: Doug McGlone SubTask 4

SubTask 5

Totals 1 2 3 4 5 Labor Rate Category

$73.04 Project Manager McGlone, Douglas (DMc) 8 8.3 $89.78 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0$83.83 Principal Engineer Navon, Daria (DN) 0 0 0 0 0 $73.04 Principal Scientist McGlone, Douglas (DMc) 11 5 6 0 0 $44.00 Project Scientist Boros, Anthony (AB) 75 55 20 0 0 $39.34 Staff Engineer Tran, Thuy-Min (MT) 0 0 0 0 0 $39.67 Drafter/Design Oliva, Brian (BO) 6 0 6 0 0$35.97 Drafter/Design Berndgen, Wendy (WDB) 0 0 0 0 0 $39.94 Project Assistant Cruz, Michele (MC) 8 4 4 0 0

$0.00 0 0 0 0 0 Total Hours 108 8 64 36 0 0

Direct Labor $5,266.91 $605.93 $2,944.96 $1,716.02 $0.00 $0.00

Overhead 79.00% $4,160.86 $478.68 $2,326.52 $1,355.66 $0.00 $0.00 Gen & Admin 36.00% $1,896.09 $218.13 $1,060.19 $617.77 $0.00 $0.00 Fringe 37.10% $1,954.02 $224.80 $1,092.58 $636.64 $0.00 $0.00 Total Labor $13,277.88 $1,527.54 $7,424.25 $4,326.09 $0.00 $0.00

Travel Vehicle Rental $600.00 $600.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $930.00 $930.00 $0.00 $0.00 $0.00 Total Travel $1,530.00 $1,530.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $9,423.00 $9,423.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 IDW Erwin $500.00 $500.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00

GPR $1,700.00 $1,700.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $11,623.00 $11,623.00 $0.00 $0.00 $0.00 Handling Fee $1,162.30 $1,162.30 $0.00 $0.00 $0.00 Total Subcontractor Cost $12,785.30 $12,785.30 $0.00 $0.00 $0.00

Laboratory Analytical Costs $4,745.00 $4,745.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $300.00 $300.00 $0.00 $0.00 $0.00 Total Laboratory $5,045.00 $5,045.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $200.00 $200.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $27.00 $27.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $1,230.00 $1,230.00 $0.00 $0.00 $0.00 Total Field Expenses $1,457.00 $1,457.00 $0.00 $0.00 $0.00

Subtotal $34,095.18 $1,527.54 $28,241.55 $4,326.09 $0.00 $0.00 Completion Fee $1,327.79 $152.75 $742.43 $432.61 $0.00 $0.00

Total Estimated Cost $35,422.97 $1,680.29 $28,983.98 $4,758.70 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

SITE : Climatrol SUBTASK 2: Field Assessment

DATE: 5/21/25

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

(Subtask Title) Principal (DMc) Owner interaction and access, correspondence with FDEP and field crew 5 Project Engineer (TH) Project Scientist (AB) Prep for field work (1 hr), mob/demob (6 hrs), GPR survey (8 hrs), Soil/GW sampling and well installations (36 hrs), monitor well sampling (3 hrs), pack/ship 55 Project Asst (MMc) Process field notes, sample tracking, data entry 4 Drafter/Designer(BO)

TOTAL LABOR 64

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 5 $600.00 $600.00

TOTAL VEHICLE $600.00

PER DIEM STAFF RATE UNIT USEAGE

Meals Category/Staff Rate Unit Usage Totals

Project Scientist (AB) $36.00 Per Day 5 $180.00 $36.00 Per Day 0 $0.00

Hotel Category/Staff Rate Unit Usage Totals

Project Scientist (AB) $150.00 Per Day 5 $750.00 $150.00 Per Day 0 $0.00

Total Meal/Hotel: $930.00

TOTAL PER DIEM $930.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals EESI AWS $0.00 Per Day 0 $0.00

Total Equip.: $0.00 Services Procurement

Name Purpose Rate Units Usage Totals PDS Drilling services (DPT, MAG wells, SBs, VPs) $9,423.00 Lump Sum 1 $9,423.00 Erwin IDW $125.00 Drum 4 $500.00 Site Lines Utility Locate / GPR Survey $1,700.00 Lump Sum 1 $1,700.00NAME OF COMPANY Utilities -Telemetry $0.00 Per Month 0 $0.00

Handling Fee $0.00 Per Month 0 $0.00

Total Services: $11,623.00

TOTAL $11,623.00

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals

VOH 8260 Aqueous $73.00 1.00 38 $2,774.00 VOH 8260 Soil $73.00 1.00 27 $1,971.00Aluminum 6010 Aqueous $13.50 1.00 0 $0.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $4,745.00 Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 2 $300.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $300.00

TOTAL LAB $5,045.00

EQUIPMENT

Personal Protection Item Rate Unit Usage Totals

Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 5 $200.00

Total Expendables: $200.00 Equipment ItemsPID/FID Combo or FID $125.00 Per Day 0 $0.00 Tubing, Poly/HDPE $0.30 Per Foot 60 $18.00 Tubing, Silicon 3/16x3/8 $3.00 Per Foot 3 $9.00

Total Equipment Items: $27.00 Equipment Kits Site Reconnaissance Kit $150.00 Day 1 $150.00 Monitor Well Installation Kit $325.00 Day 1 $325.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Soil Assessment Kit $175.00 Day 1 $175.00

Total Equipment Kits: $1,230.00

Total Equipment Kits: $1,457.00

SITE : Climatrol SUBTASK 3: Reporting

DATE: 5/21/25

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

(Subtask Title) Principal (DMc) Technical review; sign and seal report 6 Project Scientist (AB) Data evaluation and preparation of report 20 Staff Scientist (JR) Project Asst (MMc) Process field notes, data entry, report assembly 4 Drafter/Designer(BO) Prepare figures for report 6

TOTAL LABOR 36

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 0 $0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Meals Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00

Total Equip.: $0.00 Services Procurement

Name Purpose Rate Units Usage TotalsNAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00 Handling Fee $0.00 Per Month 0 $0.00

Total Services: $0.00

TOTAL $0.00

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00 Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Personal Protection Item Rate Unit Usage Totals

Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00

Total Expendables: $0.00 Equipment ItemsPID/FID Combo or FID $125.00 Per Day 0 $0.00

Total Equipment Items: $0.00 Equipment Kits

Total Equipment Kits: $0.00

Total Equipment Kits: $0.00

Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.

Arcadis U.S., Inc.

1500 Gateway Boulevard Suite 200 Boynton Beach Florida 33426 Phone: 561 697 7000 Fax: 561 369 4731 www.arcadis.com

FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062

1/3

Ms. Theresa Pepe, Project Manager Hazardous Waste Cleanup Section Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4520 Tallahassee, Florida 32399-2400

Date: May 21, 2025 Our Ref: [Add Reference] Subject: Proposal for Offsite Assessment and Reporting Former Climatrol Facility 529 S. Industry Road, Cocoa Beach, Florida

ERIC_3938

Dear Ms. Pepe, As requested, Arcadis U.S., Inc. (Arcadis) is submitting this proposal to perform limited offsite assessment (665 S.

Industry Road) and the preparation of a Limited Offsite Assessment Report. A proposed scope of work, schedule and cost estimate are included in this proposal.

Scope of Work Based on review of the site historical groundwater quality, teleconference discussions with the FDEP, and Chapters 62-780 and 62-777, (FAC), the following three tasks are proposed:

Task 1: Project Management This task includes project management activities for implementing the scope of work.

Task 2: Geophysical Survey and Soil and Groundwater Assessment A geophysical survey including ground penetrating radar to identify subsurface anomalies will be performed across the entire accessable property. Underground utilities such as water, sewer, gas and electric will also be located and marked. The geophysical contractor will provide a sketch of the findings. Enclosed Figures 1 and 2 show the area to be surveyed.

This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.

www.arcadis.com Climatrol Proposal 5-21-25

2/3

Theresa Pepe Florida Department of Environmental Protection May 21, 2025

Nine soil borings will be installed at the locations shown in Figure 2. Soil samples will be collected for laboratory analysis of volatile organic halocarbons (VOHs) per EPA Test Method 8260 from each boring in 2-foot intervals (0-2’, 2-4’, 4-6’). The water table is expected to be encountered at approximately 4 feet below ground (fbg).

Seven groundwater vertical profiles will be installed at the locations shown in Figure 1 and groundwater samples collected in 10-foot intervals (3-7’, 13-17’, 23-27’, 33-37’, 43-47’) from the water table to approximately 50 fbg. The groundwater samples will be analyzed for VOHs by EPA Test Method 8260.

Two permanent monitor wells will be installed, one screened 2-12 fbg and one to 30-35 fbg to provide repeatable groundwater sampling points on the property. An effort will also be made to locate and sample the reported historical well (MW-15) on the property. Each well will be sampled and analyzed by EPA Test Method 8260. All soil cuttings will be backfilled and purge water will be drummed for offsite disposal.

Task 3: Limited Offsite Assessment Report A brief report documenting the sampling methodologies and results, including tables summarizing the analytical results, and figures illustrating the extent and magnitude of the VOHs identified in soil and groundwater and copies of sample lab reports, will be provided to the FDEP. The report will be signed and sealed by a Florida registered professional geologist.

Schedule Arrangements for the completion of the offsite assessment will be conducted immediately upon receipt of a Task Assignment from the FDEP. Initiation of this event is expected in July 2025. The field work is expected to take 5 days to complete. The Limited Offsite Assessment Report will be submitted to the FDEP within 60 days of the completion of the field work.

Estimated Cost A Cost Estimate Form (CEF) Level of Effort (LOE) Form that present estimated project costs is enclosed.

Arcadis appreciates the opportunity to assist the Florida Department of Environmental Protection in the successful investigation and remediation of the solvent contamination in the subsurface at this site. If you have any questions or wish to discuss this proposal, please contact us.

Sincerely, Arcadis U.S., Inc.

Douglas J. McGlone, P.G.

Theresa Pepe Florida Department of Environmental Protection May 21, 2025

This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.

www.arcadis.com Climatrol Proposal 5-21-25

3/3

Principal Hydrogeologist

Email: douglas.mcglone@arcadis.com Direct Line: 561-697-7040 Mobile: 561-662-7978 Enclosures: CEFLOE

CBS WAREHOUSE

(former Climatrol, Inc. facility)

G R

A S

S

G R

A S

S

G R

A S

S

WOOD FRAME

GUARD HOUSE

ASPHALT

ASPHALT

CONCRETE

ASPHALT

(ROOFED)

F E

N C

E

FENCE

BLDG.

ASPHALT

G

ATE

UP

UP

T.O.B.

UP

UP

SEPTIC

TANK/DRAINFIELD

STORM DRAIN

BLDG.

BLDG.

INDUSTRY RD. SOUTH

SURFACE

IMPOUNDMENT

MW028

MW028I

MW028D

MW027

MW027I

MW027D

MW-15

MW020I

MW020

MW018

MW018I

MW018D

MW012D

MW-1

MW011D

MW-14

MW-3

MW-7

MW016

MW017

MW026

MW021

MW026D

MW021D

MW026I

MW027E

MW027F

MW018E

LOMBARDO

PROPERTY

FIGURE

PROPOSED

GROUNDWATER SAMPLE LOCATIONS

CHARLOTTE JOSEPHINE LOMBARDO PROPERTY

665 SOUTH INDUSTRY ROAD

COCOA, BREVARD COUNTY, FLORIDA

GROUNDWATER AND SOIL SAMPLING WORK PLAN

C I T

Y W

P B

F

L

D

I V

G

R O

U P

E

N W

F E

B B

O

L I V

A

B

O

L I

P

C

W

V

O G

E L

S O

N G

M W

V

O G

E L

S O

T

D

M

C G

L O

E

Y R

O p t O

N

O

F F

R

E F

C U s e r s b o l i v a

B

A r c a d i s A

L O

R I D

A

D

E P

T

O

F

E

N V

I R

O N

M E

N T

R O

T E

C T

I O

N P r o j e c t

F i l e s C l i m a t r o l

D

W G

S

M d w g

Y

O U

T

S

E P

F

P R

O

W

S

V

E D

C A

D V

E R

S

L

C

H

G

E S

E T

U P

O

T S

T Y

L E

T A

B L

E

A

C S

C

O L

O R

A

N A

L Y

T I C

A L

C

O

T T

E D

O

L I V

A

B

R I A

N

EXISTING SHALLOW MONITOR WELL LOCATION

EXISTING DEEP MONITOR WELL LOCATION

LEGEND

SHALLOW MONITOR WELL LOCATION (5/10)

(screened 2-15' BG)

INTERMEDIATE MONITOR WELL LOCATION (5/10)

(screened 20-30' BG)

DEEP MONITOR WELL LOCATION (5/10)

(screened 48-55' BG)

MW018

MW018I

MW018D

40'

80'0

GRAPHIC SCALE 1" = 40'

PROPOSED GROUNDWATER VERTICAL PROFILE

SAMPLE LOCATION

MW-1

MW-11D

CBS WAREHOUSE

(former Climatrol, Inc. facility)

G R

A S

S

G R

A S

S

G R

A S

S

WOOD FRAME

GUARD HOUSE

ASPHALT

ASPHALT

CONCRETE

ASPHALT

(ROOFED)

F E

N C

E

FENCE

BLDG.

ASPHALT

G

ATE

UP

UP

T.O.B.

UP

UP

SEPTIC

TANK/DRAINFIELD

STORM DRAIN

BLDG.

BLDG.

INDUSTRY RD. SOUTH

SURFACE

IMPOUNDMENT

MW028

MW028I

MW028D

MW027

MW027I

MW027D

MW-15

MW020I

MW020

MW018

MW018I

MW018D

MW012D

MW-1

MW011D

MW-14

MW-3

MW-7

MW016

MW017

MW026

MW021

MW026D

MW021D

MW026I

MW027E

MW027F

MW018E

LOMBARDO

PROPERTY

FIGURE

PROPOSED

SOIL SAMPLE LOCATIONS

CHARLOTTE JOSEPHINE LOMBARDO PROPERTY

665 SOUTH INDUSTRY ROAD

COCOA, BREVARD COUNTY, FLORIDA

GROUNDWATER AND SOIL SAMPLING WORK PLAN

C I T

Y W

P B

V

G

R O

U P

E

N W

F E

B

O

L I

B

O

L I

C

W

V

O G

E L

S O

W

V

O G

E L

S O

D

M

C G

L O

R

O p t O

N

O

F F

R

E F

C U s e r s b o l i v a

B

A r c a d i s A

L O

R I D

A

D

E P

T

O

F

E

N V

I R

O N

M E

N T

R O

T E

C T

I O

N P r o j e c t

F i l e s C l i m a t r o l

D

W G

S

M d w g

Y

O U

T

S

E P

F

P R

V

E D

C A

D V

E R

S

L

C

H

G

E S

E T

U P

O

T S

T Y

L E

T A

B L

E

A

C S

C

O L

O R

A

N A

L Y

T I C

A L

C

O

T T

E D

O

L I V

A

B

R I A

N

EXISTING SHALLOW MONITOR WELL LOCATION

EXISTING DEEP MONITOR WELL LOCATION

LEGEND

SHALLOW MONITOR WELL LOCATION (5/10)

(screened 2-15' BG)

INTERMEDIATE MONITOR WELL LOCATION (5/10)

(screened 20-30' BG)

DEEP MONITOR WELL LOCATION (5/10)

(screened 48-55' BG)

MW018

MW018I

MW018D

40'

80'0

GRAPHIC SCALE 1" = 40'

PROPOSED SOIL BORING LOCATION

MW-1

MW-11D

ARCADIS 5/19/2025

7000 North Federal Hwy 202408 Boca Raton, FL 33487 5/21/2025

Project Name Commercial Site - Cocoa, FL

Douglas McGlone Project Address 665 South Industry Road douglas.mcglone@arcadis.com Project City Cocoa 561-662-7978 Project State FL

Project Zip 32926

Cascade Rep Contact Information

Scope of Work

Quantity Unit Sales Price Subtotal

1 Lump Sum 2,350.00$ 2,350.00$

2 Day 2,250.00$ 4,500.00$

2 Day 200.00$ 400.00$

18 Each 4.00$ 72.00$

35 Each 20.00$ 700.00$

3 Each 85.00$ 255.00$

47 Foot 18.00$ 846.00$ 2 Each 125.00$ 250.00$

Pre-Tax Total

Tax Percentage

Taxes

Quote Total $9,423.00

Number

Prepared By Zachary Fordley, Project Manager Email zfordley@cascade-env.com

Cascade will provide a track mounted Geoprobe unit with a 2-man crew to provide the following.

- Collect ground water samples using the SP-16 sampler at Seven (7) locations. Each location will get Five ground water samples at 10' intervals. We will install Two (2) 1" PVC wells. One to 12' BLG and the otehr to 35' BLG. Each well will get 10' of screen and finished with a flush mount road box. We will be prepared to develop each well.

- Collect soil samples at Nine (9) locations from 0-6' BLG

- All water and soil will be drummed.

- All locations will be backfilled and patched to existing.

- This is NOT a prevailing wage site.

Description

$9,423.00

Mobilization/Demobilization

DPT Rig, Crew

Per diem

MC Liners

SP-16 ground water sample

Drums

1" MW install

Flush mounts

Account Name Bid Date Address Quote Number

Quote Revision Date

Bill To Account

Contact Name Email Phone

Preferred Drilling Solutions, Inc.

8820 66th St. North, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

DIRECT PUSH TECHNOLOGY QUOTE FORM

Date: 5/15/25 FAC ID#:

Unit Unit Rate Number of Units Extended Price whole day $1,975.00 3 5,925.00$ half day $1,475.00 -$ per foot $25.00 47 1,175.00$ each $110.00 -$ each $50.00 -$ each $35.00 -$ per well $150.00 2 300.00$ roundtrip $750.00 1 750.00$ per crew / per night $575.00 2 1,150.00$ each $75.00 4 300.00$ per day $150.00 1 150.00$ each $75.00 1 75.00$ lump sum $350.00 -$ per day $50.00 -$

TOTAL QUOTE PRICE $9,825.00

Notes: 1. Includes saw cuts, development, standby time, and decon.

Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: Rose Hood , Rose Hood Estimating & Scheduling Manager Date: 5/15/25

Days to Complete Scope of Work: 3

Direct Push Daily Rate 1 - on-site day

Equipment Type: Geoprobe 8040DT, 3230DT, 7822DT

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Other (specify)

Steam Cleaner

Decon Pad

GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)

DOT Approved 55-gal Drum

Per Diem Mobilization

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

Permits

Site Name and Location: Lombardo Property

Consultant Name: Arcadis

PROPOSED SCOPE OF WORK:

(7) DPT borings to 47', grab (5) groundwater samples each, backfill with cuttings, restore grade

(9) DPT borings to 6', soil sampling, backfill with cuttings, restore grade

(1) 1" x 35' MW with 5' .010 screen, soil sampling as needed, drum cuttings, pad and 8" manhole

665 S Industry Rd, Cocoa, Brevard County, FL

Well Completion (includes 8" MH w/ cover, concrete pad, and locking well cap)

Well Riser (includes all materials) ID 1" 5' Length

Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"

Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"

Auger Attachment, 1" Well Install

Direct Push Half-Day Rate 1 - on-site half day

(1) 1" x 12' MW with 10' .010 screen, soil sampling as needed, drum cuttings, pad and 8" manhole

EARTH TECH DRILLING

2703 NW 19TH STREET, POMPANO BEACH, FL 33069

954.974.2424 FAX:954.974.2423

Date: 5/15/2025

FAC ID#:

PROPOSED SCOPE OF WORK:

Estimated (7) Drums

Unit Unit Rate Number of Units Extended Price

Equipment Type: _ DPT Track Rig

DPT/Combo Rig whole day $1,750.00 4 $7,000.00 DPT/Combo Rig half day $0.00 1" Well Installation per foot $30.00 47 $1,410.00 Pre-Packed Well Screen (includes all materials) ID __1"____ x 5' Length each $0.00 Slotted PVC Well Screen (includes all materials) 5' Length Pack OD _______ each $0.00 Well Riser (includes all materials) ID ___1"___ 5' Length each $0.00 Well Completion (includes 8" B-D MH w/ cover, concrete pad, and locking well cap) per well $225.00 2 $450.00

Mobilization roundtrip $1,200.00 1 $1,200.00 Per Diem per crew / per night $575.00 3 $1,725.00 DOT Approved 55-gal Drum each $80.00 7 $560.00

Permits 2 (Drilling or abandonment only; cost according to WMD & Local Municipalities) each $60.00 2 $120.00 Pre-Drill Teleconference each $0.00 Water Sample each $65.00 35 $2,275.00 Well Development w/ PVC Stickup - Pull Well and abandon each $0.00

$0.00

TOTAL QUOTE PRICE $14,740.00

Notes:

Project No.: ___________________________

Date: 5/15/2025Signature and Title of Person Submitting Quote: Charles Bucher

ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.

(1) MW 1" x 12' w/ 10' .010" Screen (20/30 Sand) & 8" BD Completion

Contractor Name: Arcadis Doug McGlone - 561 662-7978

Site Name : Climatrol - 529 South Industry Rd. Cocoa, FL

Days to Complete Scope of Work: 4 Days

Subcontract Company Name: EARTH TECH DRILLING. Inc.

Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

9 - Soil Borings to 6' - Backfill & Patch

7 - Water Sample Borings with samples at 7', 17', 27', 37' & 47' (5 Samples per boring with a total of 35 Samples)

(1) MW 1" x 35' w/ 5' .010" Screen (20/30 Sand) & 8" BD Completion

Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push

SITE LINES PROPOSAL ACCEPTANCE

SIGNATURE PAGE

Site Lines Proposal Number: 01652p Proposal Date: May 21, 2025

Project Site: Climatrol Site – 665 South Industry Road, Cocoa, FL

Project Fee: $1,400.00 for utility and drum locate, $300.00 for electronic deliverable = $1,700.00

Payment Terms: [PAYABLE WITHIN 30-DAYS OF INVOICE]

INVOICE TO:

Client: ARCADIS Address: 1500 Gateway Blvd., Suite 200, Boynton Beach, FL 33426 Attention: Douglas J. McGlone, P.G.

Phone: 561-662-7978 Email: Douglas.McGlone@ARCADIS.com

Special Instructions:

In witness thereof, the parties hereto have made and executed this agreement

FOR [CLIENT] FOR SITE LINES LLC

Signature: Signature:

By: By: William L. Hardy II

Title: Title: President

Date Signed: Date Signed: May 21, 2025

115578Estimate Number

8/12/2025Expiration Date

5/14/2025Created Date

ESTIMATE

Blood Hound 6500 Technology Center Dr.

Suite 200 Indianapolis, IN 46278

Email: BHI@bhug.com bhug.com Website:

Phone #: 888-858-9830 888-858-9829 Fax #:

Customer has requested an estimate for the following scope of work:

Client has requested an estimate to horizontally locate private detectable underground utilities within the referenced property, as outlined in Red on the provided exhibit. To include scanning the entire vacant lot in a tight grid, approximately .5 acre, investigating for anomalies consistent with buried structures and debris fields. Estimate does not include locating public utilities within the public ROW.

Customer has requested approximate depths to be noted on site sketch. Please note that all depths are approximate and can only be verified using vacuum excavation.

· All estimated values are subject to change (+/-) once the technician arrives on site and conducts a proper site assessment. A Not to Exceed amount can be provided upon request, this will increase the estimate.

· Client will only be invoiced for time needed to complete the stated SOW with a (2) TWO-HOUR MINIMUM plus trip charge where applicable. Customer is advised if less time onsite is required, invoicing will be reduced to no less than the minimum fee. Any additional time required on site to complete the task beyond the estimated / minimum time will be invoiced in 15-minute increments of the provided hourly rate, upon customer approval.

· Estimated time onsite does not include time for any site-specific training, escorting or ingress / egress time which if required, shall be an additional billable charge up to and including exceeding the estimate.

· The performance of BHUG’s services is limited to full and unobstructed access to include but not limited to mechanical rooms, manholes, hand holes, vaults, meter rooms, telecom rooms, fixtures (plumbing, electrical, communication), dispensers, fenced compounds, tanks and structures. It may be necessary to have parked vehicles or machinery moved to allow for a full scan and to access structures. Full cooperation from the on-site personnel is necessary to perform a complete survey.

· Any available as-builts, engineered or other record drawings, if available, should be supplied to us prior to providing an estimate and commencement of field work. Any drawings supplied to us after the estimate has been delivered to the customer will require a mandatory review of the estimate and potential revisions to the scope of work and associated pricing.

· Blood Hound will utilize a variation of electromagnetic (EM) equipment to locate detectable underground facilities on site as indicated by client. The following equipment will be employed:

BHUG SOW

$1,858.00Grand Total douglas.mcglone@arcadis.comEmail

561-697-7040Phone

Douglas McGloneName

665 S Industry Rd., Cocoa, FL, 32926Job Site Location

630 Plaza Drive, Suite 200 Highlands Ranch, CO 80129

US

Billing Address

Arcadis U.S., Inc.Customer

Product Invoice Description Quantity Sales Price Total Price

Advantage Locate (hourly) EM / GPR Locating (hourly rate) 7.00 $254.00 $1,778.00

Trip Charge Trip Charge 1.00 $80.00 $80.00

Scope of Work

GEOVIEW ASSOCIATES, INC.

PROPOSAL ACCEPTANCE SHEET

Project Name: Climatrol Site

Project Location Cocoa, Florida GeoView Proposal #: 11713p Proposal Date: May 15, 2025 Description of Services Provide a Geophysical Site Investigation Project Cost: $3,300 – see compensation, page 3

Payment Terms: Payable within 30 days of receipt of invoice

CHARGE INVOICE TO THE ACCOUNT OF:

Client: ARCADIS, U.S., Inc.

Address: 1500 Gateway Blvd, Suite 200

Boynton Beach, FL 33426 Attention: Douglas J. McGlone, P.G.

Phone (Office): (561) 697-7040 Phone (Cell): (561) 662-7978 Email: douglas.mcglone@arcadis.com

FOR APPROVAL OF CHARGES:

Firm:

Address:

Phone No.: Fax No:

Attention:

Special Instructions and/or Mutually Agreed Upon Changes to the Proposal:

In witness thereof, the parties hereto have made and executed this Agreement

Client: GeoView Associates, Inc.

Signature

By:

By:

Title: Title: Southeast Florida Manager

Date Signed: Date Signed: May 15, 2025

Peerless Cleaners #3416 Annual Monitoring Proposal 4-18-2022.pdf
Annual Groundwater Monitoring
Annual Groundwater Monitoring Report
Schedule
Cost Estimate
Closing Remarks
HW680_HW001D ns.pdf
Subtask 2: Off-site Assessment
Subtask 3: Off-Site Assessment Report
Climatrol Proposal 5-21-25.pdf
Scope of Work
Task 1: Project Management
Task 2: Geophysical Survey and Soil and Groundwater Assessment
Task 3: Limited Offsite Assessment Report
Schedule
Estimated Cost
30032858-SM-Sep20-F1_Prop GW.pdf
Sheets and Views
Sep20-F1_Prop GW
30032858-SM-Sep20-F2_Prop Soil.pdf
Sheets and Views
Sep20-F2_Prop Soil
PDS.pdf
Direct Push

File details come from the government source that posted it. Updated .