This document is a Task Assignment Change Order (TACO 1) issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S. Inc. for groundwater monitoring services at the Majik Touch Cleaners facility located at 1420 Seven Springs Boulevard, New Port Richey, Pasco County, Florida. The primary contract number is HW680, with the task assignment designated as DC042A. The department's project manager is Theresa Pepe (850-245-8966), and the contractor's project manager is Gus Suarez (813-205-4703).

The change order adjusts subcontractor costs for Investigation Derived Waste (IDW) handling, reducing the total task assignment value from $10,919.45 to $10,839.15, representing a cost reduction of $80.30. This reduction reflects a change in IDW subcontractors during fieldwork, with the difference accounting for costs between the original subcontractor (EnviroServe at $198.00 per drum) and the actual subcontractor who performed the work (Erwin Remediation at $125.00 per drum), including applicable handling fees. The task assignment completion date remains March 29, 2024, with no time extensions. The deliverable is an Annual Monitoring Report/IDW manifest/Project Management, with a due date of March 1, 2024, and invoice approval contingent upon FDEP acceptance. Arcadis may invoice the full amount of $10,839.15 upon delivery and approval of the monitoring report.

View the file

Other files

File Type Posted
CN-370000-HW680-DC48ACO2.pdf PDF
CN-370000-HW680-DC038C.pdf PDF
CN-370000-HW680-HW11ACO3.pdf PDF
CN-370000-HW680-DC003A.pdf PDF
CN-370000-HW680-HW03ACO1.pdf PDF
CN-370000-HW680-DC46ACO2.pdf PDF
CN-370000-HW680-DC031C.pdf PDF
CN-370000-HW680-DC49ACO3.pdf PDF
CN-370000-HW680-HW04DCO1.pdf PDF
CN-370000-HW680-DC015B.pdf PDF
CN-370000-HW680-DC015D.pdf PDF
CN-370000-HW680-DC18BCO1.pdf PDF
CN-370000-HW680-HW10ACO3.pdf PDF
CN-370000-HW680-HW001D.pdf PDF
CN-370000-HW680-DC031D.pdf PDF
CN-370000-HW680-DC05ACO1.pdf PDF
CN-370000-HW680-DC05BCO1.pdf PDF
CN-370000-HW680-DC06CCO1.pdf PDF
CN-370000-HW680-DC25BCO1.pdf PDF
CN-370000-HW680-DC034A.pdf PDF
CN-370000-HW680-DC009A.pdf PDF
CN-370000-HW680-DC31BCO1.pdf PDF
CN-370000-HW680-DC046B.pdf PDF
CN-370000-HW680-DC047B.pdf PDF
CN-370000-HW680-HW003D.pdf PDF
CN-370000-HW680-DC039B.pdf PDF
CN-370000-HW680-HW22ACO4.pdf PDF
CN-370000-HW680-DC14BCO7.pdf PDF
CN-370000-HW680-SA159CO2.pdf PDF
CN-370000-HW680-HW09ACO1.pdf PDF
CN-370000-HW680-HW05CCO2.pdf PDF
CN-370000-HW680-DC004C.pdf PDF
CN-370000-HW680-DC009C.pdf PDF
CN-370000-HW680-HW05CCO1.pdf PDF
CN-370000-HW680-HW11ACO5.pdf PDF
CN-370000-HW680-HW023A.pdf PDF
CN-370000-HW680-DC042B.pdf PDF
CN-370000-HW680-DC50ACO1.pdf PDF
CN-370000-HW680-DC004B.pdf PDF
CN-370000-HW680-DC40BCO1.pdf PDF
CN-370000-HW680-DC011D.pdf PDF
CN-370000-HW680-DC020B.pdf PDF
CN-370000-HW680-SA293.pdf PDF
CN-370000-HW680-SA322CO4.pdf PDF
CN-370000-HW680-DC43ACO1.pdf PDF
CN-370000-HW680-PA376CO4.pdf PDF
CN-370000-HW680-DC03BCO2.pdf PDF
CN-370000-HW680-DC37ACO3.pdf PDF
CN-370000-HW680-SA177.pdf PDF
CN-370000-HW680-DC15ACO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

DC042A 1 HW680

This change order adjusts subcontractor costs for IDW removal.

Theresa Pepe 850-245-8966 Arcadis U.S. Inc.

Gus Suarez 813-205-4703

ERIC_5244

Majik Touch Cleaners

$ 10,839.15 $ 10,919.45

$ 10,839.15 $ 10,919.45

03/29/2024 03/29/2024 0

1 1 1

Arcadis U.S. Inc.

Gus Suarez

Contract Manager

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2024.03.25 17:08:00 -04'00' Dave Phillips Digitally signed by Dave Phillips

Date: 2024.03.25 16:16:42 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Noah Valenstein Secretary

Memorandum

TO: Negotiation File Majik Touch Cleaners

FACID NO. 51-9502292; ERIC_5244

New Port Richey, Pasco County FROM: Theresa C. Pepe, Project Manager SUBJECT: Task Assignment Change Order DC042A-1 (HW680) DATE: March 22, 2024

This change order adjusts subcontractor costs for Investigation Derived Waste (IDW).

Additional information can be found in the March 21, 2024, change order request memo from Chad Hanna of Arcadis.

The original task assignment equaled $10,919.45. This change reduces costs by $80.30 for a new total of $10,839.15. There is no time change to the task assignment. Arcadis may invoice according to the attached schedule.

Clarifications to the affected subtasks are described below.

Subtask 2: Groundwater Monitoring The IDW subcontractor changed during fieldwork. This change order reflects the difference in costs between the original subcontractor and the subcontractor who actually performed the work. This change includes appropriate handling fees. No other changes are required.

FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.

Date: 10/28/2023

Task #: HW013B SubTask 1 Project Management Site: Majik Touch Cleaners SubTask 2 Field Activities

Activity/Phase: NAM SubTask 3 NAM Report Project Manager: Gus Suarez SubTask 4

SubTask 5

Totals 1 2 3 4 5

Labor Rate Category

$85.87 Project Manager Suarez, Gus (GS) 4 3.7

$67.07 Principal Scientist Burke, Brian (BRB) 5 2 3 0 0

$50.00 Senior Engineer Hanna, Chad (CH) 19 3 16 0 0

$34.89 Technician Welch, David (DJW) 26 26 0 0 0

$39.67 Drafter/Designer Oliva, Brian (BO) 4 0 4 0 0

$30.00 Document Technician Embras, Susan (SRE) 4 2 2 0 0

Total Hours 62 4 33 25 0 0

Direct Labor $2,792.42 $321.25 $1,251.28 $1,219.89 $0.00 $0.00

Overhead 79.00% $2,206.01 $253.79 $988.51 $963.71 $0.00 $0.00

Gen & Admin 36.00% $1,005.27 $115.65 $450.46 $439.16 $0.00 $0.00

Fringe 37.10% $1,035.98 $119.18 $464.22 $452.58 $0.00 $0.00

Total Labor $7,039.68 $809.87 $3,154.47 $3,075.34 $0.00 $0.00

Travel

Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $360.00 $360.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00

EnviroServe IDW $125.00 $125.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

GPR $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $125.00 $125.00 $0.00 $0.00 $0.00

Handling Fee $12.50 $12.50 $0.00 $0.00 $0.00

Total Subcontractor Cost $137.50 $137.50 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $1,241.00 $1,241.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00

Total Laboratory $1,351.00 $1,351.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $120.00 $120.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $1,027.00 $1,027.00 $0.00 $0.00 $0.00

Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $1,247.00 $1,247.00 $0.00 $0.00 $0.00

Subtotal $10,135.18 $809.87 $6,249.97 $3,075.34 $0.00 $0.00

Completion Fee $703.97 $80.99 $315.45 $307.53 $0.00 $0.00

Total Estimated Cost $10,839.15 $890.86 $6,565.42 $3,382.87 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

SITE : Majik Touch Cleaners SUBTASK 2: Field Activities

DATE: 10/28/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities and Email Updates

Principal Geologist - Burke Field readiness with project team (1hr), PG oversight (1hr) 2

Senior Engineer - Hanna Field scheduling / support (1hr), Field readiness with field crew (1hr), prep paperwk/figure, analyze field logs/notes (1hr) 3

Field Technician - Welch FRR & Prep (2 hrs), Travel (2 hrs), gauge wells (4 hrs), sample 17 wells for VOCs (17 hrs), IDW management (1 hr) 26

Administrator - Embras Admin support (1hr), field documentation processing (1hr) 2

TOTAL LABOR 33

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 3 $360.00 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

Meals

Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel

Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00

$150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00

Total Equip.: $0.00 Services Procurement

Name Purpose Rate Units Usage Totals NAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00 NAME OF COMPANY Drilling services (DPT, MAG wells, SBs, VPs) $0.00 Lump Sum 0 $0.00 Erwin IDW $125.00 Drum 1 $125.00

Handling Fee $0.00 Per Month 0 $0.00

Total Services: $125.00

TOTAL $125.00

LABORATORY COSTS

Analytical Costs

Parameter Method Media Rate Turn Around Total Samples Totals

VOC 8260 Aqueous $73.00 1.00 17 $1,241.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $1,241.00

Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 1 $110.00

Total Shipping: $110.00

TOTAL LAB $1,351.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage Totals

Total PPE: $0.00

Expendables

Miscellaneous Expendables $40.00 Per Day 3 $120.00

Total Expendables: $120.00

Equipment Items

Tubing, Poly/HDPE $0.30 Per Foot 450 $135.00

Tubing, Silicon 3/16x3/8 $3.00 Per Foot 8 $24.00

55-gallon Drum $100.00 Each 1 $100.00

PDBs $36.00 Each 8 $288.00

Total Equipment Items: $547.00

Equipment Kits

Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00

Total Equipment Kits: $580.00

TOTAL EQUIPMENT $1,247.00

Task #: HW013B SubTask 1 Project Management Site: Majik Touch Cleaners SubTask 2 Field Activities

Activity/Phase: NAM SubTask 3 NAM Report Project Manager: Gus Suarez SubTask 4

SubTask 5

Totals 1 2 3 4 5

Labor Rate Category

$85.87 Project Manager Suarez, Gus (GS) 0 0.0

$67.07 Principal Scientist Burke, Brian (BRB) 0 0 0 0 0

$50.00 Senior Engineer Hanna, Chad (CH) 0 0 0 0 0

$34.89 Technician Welch, David (DJW) 0 0 0 0 0

$39.67 Drafter/Designer Oliva, Brian (BO) 0 0 0 0 0

$30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0

Total Hours 0 0 0 0 0 0

Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 79.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 36.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 37.10% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00

EnviroServe IDW ($73.00) ($73.00) $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

GPR $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal ($73.00) ($73.00) $0.00 $0.00 $0.00

Handling Fee ($7.30) ($7.30) $0.00 $0.00 $0.00

Total Subcontractor Cost ($80.30) ($80.30) $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal ($80.30) $0.00 ($80.30) $0.00 $0.00 $0.00

Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost ($80.30) $0.00 ($80.30) $0.00 $0.00 $0.00

DATE: 10/28/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities and Email Updates

Principal Geologist - Burke Field readiness with project team (1hr), PG oversight (1hr) 0

Senior Engineer - Hanna Field scheduling / support (1hr), Field readiness with field crew (1hr), prep paperwk/figure, analyze field logs/notes (1hr) 0

Field Technician - Welch FRR & Prep (2 hrs), Travel (2 hrs), gauge wells (4 hrs), sample 17 wells for VOCs (17 hrs), IDW management (1 hr) 0

Administrator - Embras Admin support (1hr), field documentation processing (1hr) 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 0 $0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Meals

Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel

Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00

$150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00

Total Equip.: $0.00 Services Procurement

Name Purpose Rate Units Usage Totals NAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00 NAME OF COMPANY Drilling services (DPT, MAG wells, SBs, VPs) $0.00 Lump Sum 0 $0.00 EnviroServe IDW ($73.00) Drum 1 ($73.00)

Handling Fee $0.00 Per Month 0 $0.00

Total Services: ($73.00)

TOTAL ($73.00)

LABORATORY COSTS

Analytical Costs

Parameter Method Media Rate Turn Around Total Samples Totals

VOC 8260 Aqueous $73.00 1.00 0 $0.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00

Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage Totals

Total PPE: $0.00

Expendables

Miscellaneous Expendables $40.00 Per Day 0 $0.00

Total Expendables: $0.00

Equipment Items

Tubing, Poly/HDPE $0.30 Per Foot 0 $0.00

Tubing, Silicon 3/16x3/8 $3.00 Per Foot 0 $0.00

55-gallon Drum $100.00 Each 0 $0.00

PDBs $36.00 Each 0 $0.00

Total Equipment Items: $0.00

Equipment Kits

Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00

Total Equipment Kits: $0.00

TOTAL EQUIPMENT $0.00

Task #: SubTask 1 Project Management Site: Majik Touch Cleaners SubTask 2 Field Activities

Activity/Phase: NAM SubTask 3 NAM Report Project Manager: Gus Suarez SubTask 4

SubTask 5

Totals 1 2 3 4 5

Labor Rate Category

$85.87 Project Manager Suarez, Gus (GS) 4 3.7

$67.07 Principal Scientist Burke, Brian (BRB) 5 2 3 0 0

$50.00 Senior Engineer Hanna, Chad (CH) 19 3 16 0 0

$34.89 Technician Welch, David (DJW) 26 26 0 0 0

$39.67 Drafter/Designer Oliva, Brian (BO) 4 0 4 0 0

$30.00 Document Technician Embras, Susan (SRE) 4 2 2 0 0

Total Hours 62 4 33 25 0 0

Direct Labor $2,792.42 $321.25 $1,251.28 $1,219.89 $0.00 $0.00

Overhead 79.00% $2,206.01 $253.79 $988.51 $963.71 $0.00 $0.00

Gen & Admin 36.00% $1,005.27 $115.65 $450.46 $439.16 $0.00 $0.00

Fringe 37.10% $1,035.98 $119.18 $464.22 $452.58 $0.00 $0.00

Total Labor $7,039.68 $809.87 $3,154.47 $3,075.34 $0.00 $0.00

Travel

Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $360.00 $360.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00

EnviroServe IDW $198.00 $198.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

GPR $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $198.00 $198.00 $0.00 $0.00 $0.00

Handling Fee $19.80 $19.80 $0.00 $0.00 $0.00

Total Subcontractor Cost $217.80 $217.80 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $1,241.00 $1,241.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00

Total Laboratory $1,351.00 $1,351.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $120.00 $120.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $1,027.00 $1,027.00 $0.00 $0.00 $0.00

Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $1,247.00 $1,247.00 $0.00 $0.00 $0.00

Subtotal $10,215.48 $809.87 $6,330.27 $3,075.34 $0.00 $0.00

Completion Fee $703.97 $80.99 $315.45 $307.53 $0.00 $0.00

Total Estimated Cost $10,919.45 $890.86 $6,645.72 $3,382.87 $0.00 $0.00

DATE: 10/28/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities and Email Updates

Principal Geologist - Burke Field readiness with project team (1hr), PG oversight (1hr) 2

Senior Engineer - Hanna Field scheduling / support (1hr), Field readiness with field crew (1hr), prep paperwk/figure, analyze field logs/notes (1hr) 3

Field Technician - Welch FRR & Prep (2 hrs), Travel (2 hrs), gauge wells (4 hrs), sample 17 wells for VOCs (17 hrs), IDW management (1 hr) 26

Administrator - Embras Admin support (1hr), field documentation processing (1hr) 2

TOTAL LABOR 33

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 3 $360.00 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

Meals

Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel

Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00

$150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00

Total Equip.: $0.00 Services Procurement

Name Purpose Rate Units Usage Totals EnviroServe IDW $198.00 Drum 1 $198.00

Handling Fee $0.00 Per Month 0 $0.00

Total Services: $198.00

TOTAL $198.00

LABORATORY COSTS

Analytical Costs

Parameter Method Media Rate Turn Around Total Samples Totals

VOC 8260 Aqueous $73.00 1.00 17 $1,241.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $1,241.00

Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 1 $110.00

Total Shipping: $110.00

TOTAL LAB $1,351.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage Totals

Total PPE: $0.00

Expendables

Miscellaneous Expendables $40.00 Per Day 3 $120.00

Total Expendables: $120.00

Equipment Items

Tubing, Poly/HDPE $0.30 Per Foot 450 $135.00

Tubing, Silicon 3/16x3/8 $3.00 Per Foot 8 $24.00

55-gallon Drum $100.00 Each 1 $100.00

PDBs $36.00 Each 8 $288.00

Total Equipment Items: $547.00

Equipment Kits

Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00

Total Equipment Kits: $580.00

TOTAL EQUIPMENT $1,247.00

SUBTASK 3: NAM Report

DATE: 10/28/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal Geologist - Burke P.G. Author Final Deliverable (3 hrs) 3

Senior Engineer - Hanna Prepare report (10 hrs), update tables (2 hrs), figures (2 hrs), trends (2 hrs) 16

CAD Drafter - Oliva Figure updates (4 hrs) 4

Administrator - Embras Reporting support and submittal (2 hrs) 2

TOTAL LABOR 25

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 0 $0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Meals

Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel

Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00

$150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00

Total Equip.: $0.00 Services Procurement

Name Purpose Rate Units Usage Totals Utilities -Electric $20.00 Per Month 0 $0.00 Handling Fee $20.00 Per Month 0 $0.00

Total Services: $0.00

TOTAL $0.00

LABORATORY COSTS

Analytical Costs

Parameter Method Media Rate Turn Around Total Samples Totals

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00

Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage Totals

Total PPE: $0.00

Expendables

Miscellaneous Expendables $40.00 Per Day 0 $0.00

Total Expendables: $0.00

Equipment Items

Total Equipment Items: $0.00

Equipment Kits

Total Equipment Kits: $0.00

TOTAL EQUIPMENT $0.00

From: Hanna, Chad To: Pepe, Theresa Cc: Burke, Brian Subject: RE: Majik Touch (ERIC_5244) 2023 NAM Report (TA DC042A) Date: Thursday, March 21, 2024 7:14:31 PM Attachments: image001.png image002.png image003.png image004.png image005.png Att.1-MajikTouch_GWM-HW680 CEF (ARC)_2023.10-original.xlsx Att.1-MajikTouch_GWM-HW680 CEF (ARC)_2024.03-TACO1-delta.xlsx Att.1-MajikTouch_GWM-HW680 CEF (ARC)_2024.03-TACO1-final.xlsx 2024.01_IDW_T&D_InvoiceAUS089_APPRVD_01.09.2024.pdf

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Hi Theresa, Please see attached TACO1 to back out the IDW costs. Thank you for the clarification on the noticing and reminders on the IDW TACOs.

Chad Hanna Senior Environmental Specialist Arcadis U.S., Inc.

4300 West Cypress Street, Suite 450 | Tampa, FL | 33607 | USA T +1 813 353 5765 M +1 813 480 8498 www.arcadis.com

Be green, leave it on the screen.

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW680

DC042A Completion March 29, 2024

Arcadis will conduct groundwater monitoring from select wells at the site. All activities will be performed according to the October 28, 2023, Work Plan submitted by Arcadis.

Theresa Pepe 850-245-8966 Contractor Arcadis U.S. Inc. Contractor

Contractor Gus Suarez Contractor 813-205-4703

ERIC_5244

1420 Seven Springs Blvd, New Port Richey, Pasco County

Majik Touch Cleaners

Contractor Contractor

$ 10,919.45

$ 10,919.45

Scope of Work

Arcadis U.S. Inc.

Contractor

Gus Suarez

Contract Manager

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2023.11.01 15:32:57 -04'00'

Kelly Crain

Kelly Crain Digitally signed by Kelly Crain Date: 2023.11.01 14:53:15 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Annual Monitoring Report/IDW manifest/Project Management 02/29/2024

FDEP approval of Annual Monitoring Report/IDW manifest/Project Management $ 10,919.45

$ 10,919.45