CN-370000-HW680-DC37ACO3.pdf

PDF 4 MB Posted

Attached to
Master Agreement FL|HW680|454e104ae8fbcb5641ac6acc30583968
Contract number
HW680
Issued by
Florida

About this file

This document comprises two Task Assignment Change Orders (TACO) issued by the State of Florida Department of Environmental Protection (FDEP) amending Contract Number HW680 with contractor Arcadis U.S., Inc. The first change order, TACO 2, dated January 26, 2024, authorizes a 30-day time extension for Investigation Derived Waste (IDW) manifests and approval of final deliverables, extending the completion date from January 29, 2024 to February 28, 2024, with no cost adjustment. The second change order, TACO 3, dated February 6, 2024, adjusts costs downward by $1,031.80 due to reduced IDW drum disposal requirements. The project concerns environmental investigation and remediation services at the Lori-Al (D140) Dry Cleaner facility in Coral Springs, Broward County, Florida (FACID 06-9701245; Project ERIC_4234).

The original task assignment valued at $19,430.67 is reduced to $18,398.87 under TACO 3, reflecting changes to Subtask 4 where the scope of IDW drums was reduced from six to two units and the IDW subcontractor changed during fieldwork. The cost reduction of $1,031.80 includes the difference between the original IDW disposal costs quoted by EnviroServe ($1,188.00) and actual costs from the replacement subcontractor Erwin Remediation ($250.00), plus proportional handling fees. The contract scope encompasses four primary deliverables: fieldwork activities, well installation and sampling, report preparation with IDW manifests, and project management. Invoice payments are conditioned upon FDEP approval, with the first $3,158.26 due upon fieldwork approval and the remaining $15,240.61 upon final deliverable approval. The project manager for FDEP is Theresa Pepe (850-245-8966), and the contractor's project manager is Gus Suarez (813-205-4703).

View the file

Other files

File Type Posted
CN-370000-HW680-DC48ACO2.pdf PDF
CN-370000-HW680-DC038C.pdf PDF
CN-370000-HW680-HW11ACO3.pdf PDF
CN-370000-HW680-DC003A.pdf PDF
CN-370000-HW680-HW03ACO1.pdf PDF
CN-370000-HW680-DC46ACO2.pdf PDF
CN-370000-HW680-DC031C.pdf PDF
CN-370000-HW680-DC49ACO3.pdf PDF
CN-370000-HW680-HW04DCO1.pdf PDF
CN-370000-HW680-DC015B.pdf PDF
CN-370000-HW680-DC015D.pdf PDF
CN-370000-HW680-DC18BCO1.pdf PDF
CN-370000-HW680-HW10ACO3.pdf PDF
CN-370000-HW680-HW001D.pdf PDF
CN-370000-HW680-DC031D.pdf PDF
CN-370000-HW680-DC05ACO1.pdf PDF
CN-370000-HW680-DC05BCO1.pdf PDF
CN-370000-HW680-DC06CCO1.pdf PDF
CN-370000-HW680-DC25BCO1.pdf PDF
CN-370000-HW680-DC034A.pdf PDF
CN-370000-HW680-DC009A.pdf PDF
CN-370000-HW680-DC31BCO1.pdf PDF
CN-370000-HW680-DC046B.pdf PDF
CN-370000-HW680-DC047B.pdf PDF
CN-370000-HW680-HW003D.pdf PDF
CN-370000-HW680-DC039B.pdf PDF
CN-370000-HW680-HW22ACO4.pdf PDF
CN-370000-HW680-DC14BCO7.pdf PDF
CN-370000-HW680-SA159CO2.pdf PDF
CN-370000-HW680-HW09ACO1.pdf PDF
CN-370000-HW680-HW05CCO2.pdf PDF
CN-370000-HW680-DC004C.pdf PDF
CN-370000-HW680-DC009C.pdf PDF
CN-370000-HW680-HW05CCO1.pdf PDF
CN-370000-HW680-HW11ACO5.pdf PDF
CN-370000-HW680-HW023A.pdf PDF
CN-370000-HW680-DC042B.pdf PDF
CN-370000-HW680-DC50ACO1.pdf PDF
CN-370000-HW680-DC004B.pdf PDF
CN-370000-HW680-DC40BCO1.pdf PDF
CN-370000-HW680-DC011D.pdf PDF
CN-370000-HW680-DC020B.pdf PDF
CN-370000-HW680-DC42ACO1.pdf PDF
CN-370000-HW680-SA293.pdf PDF
CN-370000-HW680-SA322CO4.pdf PDF
CN-370000-HW680-DC43ACO1.pdf PDF
CN-370000-HW680-PA376CO4.pdf PDF
CN-370000-HW680-DC03BCO2.pdf PDF
CN-370000-HW680-SA177.pdf PDF
CN-370000-HW680-DC15ACO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Name:

4. ☐ There are no changes to the TA compensation.

☐ The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO ☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. ☐ There are no changes to the TA Expiration Date.

☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. ☐ There are no changes to the Attachments.

☐ Attachment ___ is replaced with Attachment -____.

7. ☐ No Additional Changes.

☐ Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

DC037A 3 HW680

This change order adjusts costs for fewer IDW drums.

Theresa Pepe 850-245-8966 Contractor Contractor

Contractor Contractor

Contractor

Arcadis U.S. Inc.

Gus Suarez 813-205-4703

ERIC_4234

Lori-Al (D140) Dry Cleaner

✔ $ 18,398.87 $ 19,430.67

$ 18,398.87 $ 19,430.67 ✔ Completion

Completion 02/28/2024 22

✔ 1 1 3

Arcadis U.S. Inc.

Gus Suarez

Contract Manager

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2024.02.06 13:35:05 -05'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.02.06 11:30:30 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW680

DC037A

$ 18,398.87

Fieldwork Activities

Well Installation & Sampling Report/IDW manifest/Project Management

FDEP approval of Fieldwork Activities

FDEP approval of Well Installation & Sampling Report/IDW manifest/Project Management

09/29/2023

02/14/2024

$ 3,158.26

$ 15,240.61

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

Memorandum

TO: Negotiation File Lori-Al (D140) Dry Cleaner

FACID NO. 06-9701245; ERIC_4234

Coral Springs, Broward County FROM: Theresa C. Pepe, Project Manager SUBJECT: Task Assignment Change Order DC037A-3 (HW680) DATE: January 29, 2024

This change order adjusts subcontractor costs for Investigation Derived Waste (IDW).

Additional information can be found in the January 26, 2024, change order request memo from Doug McGlone of Arcadis.

The original task assignment equaled $19,430.67. This change reduces costs by $1,031.80 for a new total of $18,398.87. There is no time change to the task assignment. Arcadis may invoice according to the attached schedule.

Clarifications to the affected subtasks are described below.

Subtask 4: TACO The scope of work was reduced from six drums to two. Additionally, the IDW subcontractor changed during fieldwork. This change order reflects the difference in costs between the original IDW costs and the actual work performed. This change includes appropriate handling fees. No other changes are required.

FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.

Date: 1/29/2024

Task #: SubTask 1 Project Management Site: Lori AL D-140 SubTask 2 Site Access, Well Installation/Sampling

Activity/Phase: Well Installation SubTask 3 Reporting Project Manager: Doug McGlone SubTask 4 TACO

SubTask 5

Totals 1 2 3 4 5 Labor Rate Category

$67.07 Project Manager McGlone, Douglas (DMc) 4 4.3$100.00 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0 $85.87 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0$81.66 Principal Scientist McManus, Andrew (ATM) 0 0 0 0 0$67.07 Principal Scientist Burke, Brian (BRB) 0 0 0 0 0 $67.07 Principal Scientist McGlone, Douglas (DMc) 10 6 4 0 0 $39.34 Staff Scientist Riley, Joel (JR) 30 22 8 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 4 0 4 0 0 $34.40 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0 $35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0 $30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0 $37.25 Project Assistant Cruz, Michele (MC) 5 2 3 0 0

Total Hours 53 4 30 19 0 0

Direct Labor $2,481.29 $285.46 $1,342.40 $853.43 $0.00 $0.00

Overhead 79.00% $1,960.22 $225.51 $1,060.50 $674.21 $0.00 $0.00 Gen & Admin 36.00% $893.26 $102.77 $483.26 $307.23 $0.00 $0.00 Fringe 37.10% $920.56 $105.91 $498.03 $316.62 $0.00 $0.00 Total Labor $6,255.33 $719.65 $3,384.19 $2,151.49 $0.00 $0.00

Travel Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $8,970.00 $8,970.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 IDW EnviroServe $250.00 $1,188.00 $0.00 ($938.00) $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $9,220.00 $10,158.00 $0.00 ($938.00) $0.00 Handling Fee $922.00 $1,015.80 $0.00 ($93.80) $0.00 Total Subcontractor Cost $10,142.00 $11,173.80 $0.00 ($1,031.80) $0.00

Laboratory Analytical Costs $73.00 $73.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 Total Laboratory $183.00 $183.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $33.00 $33.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 Equipment (Other) $740.00 $740.00 $0.00 $0.00 $0.00 Total Field Expenses $953.00 $953.00 $0.00 $0.00 $0.00

Subtotal $17,773.33 $719.65 $15,933.99 $2,151.49 ($1,031.80) $0.00 Completion Fee $625.54 $71.97 $338.42 $215.15 $0.00 $0.00

Total Estimated Cost $18,398.87 $791.62 $16,272.41 $2,366.64 ($1,031.80) $0.00

Cost from Prior CEF: $19,430.67 Manual Entry

Cost from Delta CEF; ($1,031.80) Manual Entry

Cost (Prior + Delta): $18,398.87 Auto-Calculated

Rounding Error: $0.00 Auto-Calculated

Final Total Cost: $18,398.87 Auto-Calculated

REV: 02/03 CEF ARCADIS Page 1

SITE : Lori AL D-140

SUBTASK 4: TACO

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

(Subtask Title)

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 0 $0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Meals Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00

$150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00

Total Equip.: $0.00 Services Procurement

Name Purpose Rate Units Usage Totals Erwin IDW $938.00 Drum -1 ($938.00)

Handling Fee $20.00 Per Month 0 $0.00

Total Services: ($938.00)

TOTAL ($938.00)

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples TotalsVOC 8260 Aqueous $150.00 1.00 0 $0.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00 Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage TotalsPPE Level D $35.00 Per Man Day 0 $0.00

Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00

Total Expendables: $0.00 Equipment Items

Total Equipment Items: $0.00 Equipment Kits

Total Equipment Kits: $0.00

TOTAL EQUIPMENT $0.00

Date: 1/29/2024

Task #: SubTask 1 Project Management Site: Lori AL D-140 SubTask 2 Site Access, Well Installation/Sampling

Activity/Phase: Well Installation SubTask 3 Reporting Project Manager: Doug McGlone SubTask 4 TACO 1

SubTask 5

Totals 1 2 3 4 5 Labor Rate Category

$67.07 Project Manager McGlone, Douglas (DMc) 0 0.0$100.00 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0 $85.87 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0$81.66 Principal Scientist McManus, Andrew (ATM) 0 0 0 0 0$67.07 Principal Scientist Burke, Brian (BRB) 0 0 0 0 0 $67.07 Principal Scientist McGlone, Douglas (DMc) 0 0 0 0 0 $39.34 Staff Scientist Riley, Joel (JR) 0 0 0 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 0 0 0 0 0 $34.40 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0 $35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0 $30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0 $37.25 Project Assistant Cruz, Michele (MC) 0 0 0 0 0

Total Hours 0 0 0 0 0 0

Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 79.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 36.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.10% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 IDW EnviroServe ($938.00) $0.00 $0.00 ($938.00) $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal ($938.00) $0.00 $0.00 ($938.00) $0.00 Handling Fee ($93.80) $0.00 $0.00 ($93.80) $0.00 Total Subcontractor Cost ($1,031.80) $0.00 $0.00 ($1,031.80) $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal ($1,031.80) $0.00 $0.00 $0.00 ($1,031.80) $0.00 Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost ($1,031.80) $0.00 $0.00 $0.00 ($1,031.80) $0.00

SUBTASK 4: TACO 1

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

(Subtask Title)

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 0 $0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Meals Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00

$150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00

Total Equip.: $0.00 Services Procurement

Name Purpose Rate Units Usage TotalsNAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00 Enviroserve IDW $938.00 Drum -1 ($938.00)

Handling Fee $20.00 Per Month 0 $0.00

Total Services: ($938.00)

TOTAL ($938.00)

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals

VOC 8260 Aqueous $150.00 1.00 0 $0.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00 Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage TotalsPPE Level D $35.00 Per Man Day 0 $0.00

Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00

Total Expendables: $0.00 Equipment Items

Total Equipment Items: $0.00 Equipment KitsSite Reconnaissance Kit $150.00 Day 0 $0.00

Date: 6/15/2023

Task #: SubTask 1 Project Management Site: Lori AL D-140 SubTask 2 Site Access, Well Installation/Sampling

Activity/Phase: Well Installation SubTask 3 Reporting Project Manager: Doug McGlone SubTask 4

SubTask 5

Totals 1 2 3 4 5 Labor Rate Category

$67.07 Project Manager McGlone, Douglas (DMc) 4 4.3 $85.87 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0 $67.07 Principal Scientist McGlone, Douglas (DMc) 10 6 4 0 0 $39.34 Staff Scientist Riley, Joel (JR) 30 22 8 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 4 0 4 0 0 $34.40 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0 $35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0 $30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0 $37.25 Project Assistant Cruz, Michele (MC) 5 2 3 0 0

Total Hours 53 4 30 19 0 0

Direct Labor $2,481.29 $285.46 $1,342.40 $853.43 $0.00 $0.00

Overhead 79.00% $1,960.22 $225.51 $1,060.50 $674.21 $0.00 $0.00 Gen & Admin 36.00% $893.26 $102.77 $483.26 $307.23 $0.00 $0.00 Fringe 37.10% $920.56 $105.91 $498.03 $316.62 $0.00 $0.00 Total Labor $6,255.33 $719.65 $3,384.19 $2,151.49 $0.00 $0.00

Travel Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $8,970.00 $8,970.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 IDW EnviroServe $1,188.00 $1,188.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $10,158.00 $10,158.00 $0.00 $0.00 $0.00 Handling Fee $1,015.80 $1,015.80 $0.00 $0.00 $0.00 Total Subcontractor Cost $11,173.80 $11,173.80 $0.00 $0.00 $0.00

Laboratory Analytical Costs $73.00 $73.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 Total Laboratory $183.00 $183.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $33.00 $33.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 Equipment (Other) $740.00 $740.00 $0.00 $0.00 $0.00 Total Field Expenses $953.00 $953.00 $0.00 $0.00 $0.00

Subtotal $18,805.13 $719.65 $15,933.99 $2,151.49 $0.00 $0.00 Completion Fee $625.54 $71.97 $338.42 $215.15 $0.00 $0.00

Total Estimated Cost $19,430.67 $791.62 $16,272.41 $2,366.64 $0.00 $0.00

SUBTASK 2: Site Access, Well Installation/Sampling

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

(Subtask Title) Principal (DMc) Event oversight, site owner/tenant access, IDW management 6 Staff Scientist (JR) Mob/demob (3 hrs), Well installation (10 hrs) 13 Staff Scientist (JR) Mob/demob (3 hrs), survey TOC (1 hr) sampling, pack/ship (5 hrs) 9 Project Asst (MMc) Process field notes, data entry 2 Drafter/Designer(BO) 0

TOTAL LABOR 30

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 2 $240.00 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

Meals Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00

Hotel Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00

Total Equip.: $0.00 Services Procurement

Name Purpose Rate Units Usage Totals NAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00 PDS Drilling services $8,970.00 Lump Sum 1 $8,970.00 EnviroServe IDW $198.00 6 $1,188.00

Handling Fee $0.00 Per Month 0 $0.00

Total Services: $10,158.00

TOTAL $10,158.00

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals

VOC 8260 Aqueous $73.00 1.00 1 $73.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $73.00

Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 1 $110.00

Total Shipping: $110.00

TOTAL LAB $183.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage Totals Total PPE: $0.00

Expendables Miscellaneous Expendables $40.00 Per Day 2 $80.00

Total Expendables: $80.00 Equipment Items

Tubing, Poly/HDPE $0.30 Per Foot 100 $30.00 Tubing, Silicon 3/16x3/8 $3.00 Per Foot 1 $3.00 55-gallon Drum $100.00 Each 1 $100.00

Total Equipment Items: $133.00 Equipment Kits Monitor Well Installation Kit $325.00 Day 1 $325.00 Deep Groundwater Sampling Kit $415.00 Day 1 $415.00

Total Equipment Kits: $740.00

TOTAL EQUIPMENT $953.00

SUBTASK 3: Reporting

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

(Subtask Title) Principal (DMc) Prepare and submit field notes, lab report, sample forms and deliverable to FDEP; technical analysis 4

Project Engineer (TH) 0

Staff Scientist (JR) Data evaluation and preparation of deliverable 8

Project Asst (MMc) Assemble report, ADaPT upload 3

Drafter/Designer(BO) Figures production for report 4

TOTAL LABOR 19

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 0 $0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Meals Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00

$150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00

Total Equip.: $0.00 Services Procurement

Name Purpose Rate Units Usage Totals Handling Fee $20.00 Per Month 0 $0.00

Total Services: $0.00

TOTAL $0.00

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00 Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage Totals Total PPE: $0.00

Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00

Total Expendables: $0.00 Equipment Items

Total Equipment Items: $0.00 Equipment Kits

From: McGlone, Douglas To: Pepe, Theresa Subject: FW: Lori-Al D140 time extension for signature Date: Friday, January 26, 2024 2:38:39 PM Attachments: image002.png image010.png image011.png image012.png image013.png image003.png Arcadis Invoice - Lori-Al D140 - AUS099.pdf Arcadis Manifest - Lori-Al D140 Dry Cleaner - Coral Springs - 01.17.2024.pdf

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

See manifest and invoice for D-140. I think I owe you a Taco to reduce IDW cost?

Douglas J. McGlone PG Principal Geologist Arcadis U.S., Inc.

1500 Gateway Blvd., Suite 200 | Boynton Beach, Florida | 33426 | USA M. +1 561.662.7978 www.arcadis.com

Professional Geologist / PG-FL 2405

From: Silano, Miranda <miranda.silano@arcadis.com> Sent: Friday, January 26, 2024 2:29 PM To: McGlone, Douglas <Douglas.McGlone@arcadis.com> Subject: RE: Lori-Al D140 time extension for signature

Hi Doug, I’ve attached the manifest and invoice from Erwin for the Lori-Al D140 drums they picked up.

Sincerely, Miranda Silano Geologist Arcadis U.S., Inc.

1500 Gateway Blvd, Suite 200, Boynton Beach, FL 33426 T +1 (201) 693-2225 www.arcadis.com mailto:Douglas.McGlone@arcadis.com mailto:Theresa.Pepe@FloridaDEP.gov http://secure-web.cisco.com/1ixwb8rbWHQ9nASUdzav_8NcnCoF7gEnocSR4W1BijF8cq8KkvlY0C2kWgTP1XxxKMI7DnqBMoTP0EfAPFIi_7CtGDKwIX8vYHap2n18OYHwMDkU4nDR7lXlO7D3GAjIhGQweb-QdAmI63ULxh59ttjQ7vpVdl4v0CSvdzAcD4th_8ycZILDbGTDxa-2ndIi0QiLMqCGD_cH8JFT8ALnm6jHCHpY6QpfLQ7xOnQ5crkn5pXeAwR6jFeYFdkLoOyn3lqI5WkXPEi4PM_9X6dyCrFMcUcZveYQ8Nha-mVrVuNknM6xgcJZM6mHVoOZ5cGRC/http%3A%2F%2Fwww.arcadis.com%2F https://secure-web.cisco.com/1MTXaTMtzYL9qenJbbkohpWr595l_TWOMcIZvTVV3r_e5iBaGaYhaRsZCkN6SXSoaOUjzErEB9899nGs6p4V9cHKbvtt7BUCuxmJxCDbaV-J7gydpYpNu-rbnZBaXe74C7Jj1eWsfrhstJ0UtoFUZg2-ybFMNw-dtttWNhleM9Xy-K7k6v0uY6X-Xz_DzeL1tyqELFtn4VLYaFJfSC46N7EAfwfbsCKJWaqL3GTTssDbUUhcxlvMS6xs12csDCefRHxW-f0j53mQhOJ0CBJi9u5Eh4jlsKnsivNDmg9EktI6zCFR_hTxZVz50ox701hS2/https%3A%2F%2Fwww.linkedin.com%2Fshowcase%2Farcadis-north-america%2F https://secure-web.cisco.com/1o2_kmXzT2ddTU4cmPyr_yZCY74kRBB08zgJ1lGXAFxnCeL9795CfvhaiOIGq9dMeV8pNvPJYAdzGgHmrGx2tFBW-aOrGRtkMH8V0gC2jO31DvHjR4WQbGc8szgbaPHBJobQBmGruVC-cvTmA7uGSU5MMzq4j_hj1t-afwCXjBoZXTgoqLKh5h6L7Ftc0B28H-PPE6iUq-BbIWEe1exoQqWA3UrHUumyNU9H6kyUj36xCbM945EK6owTtO1PmKRWpWjG6WYj2gJbODASPAT3QNqlj8Ki1sYiuZXx176GgJaXijINewjgr6JAGCngeU_oS/https%3A%2F%2Ftwitter.com%2FArcadis_NA%3Fref_src%3Dtwsrc%255Egoogle%257Ctwcamp%255Eserp%257Ctwgr%255Eauthor https://secure-web.cisco.com/1h2_1Al1kXOUiob_KD-bIb-JHL8Ts-6QKlP0fSPyKhZ89k2HCOQb8Xf2OUtCNdDGwsAh0WMAE2VZ-EOp-ox9XmB8sMplE2DEioCpxElUkTdIM1xY_n2gUw4FpMKwsPHxr5oGHREXPerIRJKeNg-cO_WcsXvqgoX8feisoKrTD7VJxcEZ-EnEKW0xYHOL8A-ICnbLcFMqxnor5nYYnM2iHB5fVxVDIdBPX0X6PiyeQQrzIDCB6DueC1UkIqzMwoeh4j6gpv-wemKmUm-WJrnCpNTlXp-WUsWPaO2OC0Z2JqqCZJErIoC6iokUnteHiSh3E/https%3A%2F%2Fwww.facebook.com%2FArcadisNorthAmerica%2F https://secure-web.cisco.com/1PDIulfPVksqpVBTHx7nN-ZHNA4-MpnZ4JPZh2z13LHgjb-5IxWJsDlocjjMwv1zeFq2fpjvxnYuzY-FZnZ7aE7V0g8po-IPf4OURdOhTszGGDHsbRqyDSGRTDYS6mCvyWWtgFl0PFzDquvO87Zv62ExXQMJBXrXKeWXLYumnquCwoHOKTqAl4LNqAdGU2GmnDIJ2LGSFAyOJqTYcgGWez4NVuxn8OHZcmwJt1ezDtV1KetKEEa90_vMRnryiSeOZnlMvarSmV7AmaazOwWBibbWPfEo-OZLEXv4YmijzWYpiGGlE3F-9TxG1RfhxS72C/https%3A%2F%2Fwww.instagram.com%2Farcadisglobal%2F%3Fhl%3Den http://secure-web.cisco.com/1ixwb8rbWHQ9nASUdzav_8NcnCoF7gEnocSR4W1BijF8cq8KkvlY0C2kWgTP1XxxKMI7DnqBMoTP0EfAPFIi_7CtGDKwIX8vYHap2n18OYHwMDkU4nDR7lXlO7D3GAjIhGQweb-QdAmI63ULxh59ttjQ7vpVdl4v0CSvdzAcD4th_8ycZILDbGTDxa-2ndIi0QiLMqCGD_cH8JFT8ALnm6jHCHpY6QpfLQ7xOnQ5crkn5pXeAwR6jFeYFdkLoOyn3lqI5WkXPEi4PM_9X6dyCrFMcUcZveYQ8Nha-mVrVuNknM6xgcJZM6mHVoOZ5cGRC/http%3A%2F%2Fwww.arcadis.com%2F

Invoice

Date

1/23/2024

Invoice #

AUS099

Arcadis U.S., Inc.

Attn: Miranda Silano 1705 Metropolitan Boulevard Tallahassee, FL 32308 invoices_us@arcadis.com

P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511 ErwinRemediation@gmail.com

Site City

Coral Springs

Site Name

Lori-Al D140 Dry Cleaner

Total

Quantity Rate AmountDate Item

2 125.00 250.001/17/2024 Drum Disp - Non-Haz Groundwater

$250.00

1. Generator ID Number 3. Emergency Response Phone 4. Waste Tracking Number 1 of 1 3074

5. Generator's Name and Mailing Address Generator's Site Address (if different than mailing address)

Lori-Al D140 Dry Cleaner 9716 Shadow Wood Boulevard

Generator's Phone: Coral Springs, FL 33071

6. Transport 1 Company Name U.S. EPA ID Number

Erwin Remediation, Inc.

7. Transport 2 Company Name U.S. EPA ID Number

8. Designated Facility Name and Site Address U.S. EPA ID Number

Erwin Remediation, Inc.

408 Ditmar Street Pensacola, FL 32503

Facility's Phone: (850) 292-6511

9. Waste Shipping Name and Description 11. Total 12. Unit

Type Quanity Wt/Vol.

1.

2.

3.

4.

13. Special Handling Instructions and Additional Information

Generator's/Offeror's Printed/Typed Name Signature Month Day Year

15. International Shipments Port of Entry/Exit:

Transporter Signature (for exports only): Date Leaving U.S.:

16. Transport Acknowledgement of Receipt of Materials Transporter 1 Printed/Typed Name Signature Month Day Year

Transporter 2 Printed/Typed Name Signature Month Day Year

17. Discrepancy 17a. Discrepancy Indication Space

Manifest Reference Number:

17b. Alternate Facilty (or Generator)

Facility's Phone:

17c. Signature of Alternate Facilty (or Generator) Month Day Year

18. Designated Facility Owner or Operator: Certification of receipt of materials covered by the manifest except as noted in item 17a Printed/Typed Name Signature Month Day Year

Non-Hazardous Water

10. Containers No.

T R

A N

S P

O

E

D

S

IG

D

F

C

IL

IT

Y

NON-HAZARDOUS

WASTE MANIFEST

IN

'L G

O

14.GENERATOR'S/OFFEROR'S CERTIFICATION: I hereby declare that the contents of this consignment are fully and accurately described above by the proper shipping name, and are classified, packaged, marked and labled/placarded, and are in al respects in propertt condition for transport according to applicable international and govenemental regulations.

1 17 2024

FLR000223867

0439285-001-SO

2. Page

DM

17 2024Loring Dobbins

Loring Dobbins Import to U.S. Export from U.S.

Quantity Type Residue Partial Rejection Full Rejection

Robert

Typewritten Text

Robert Donado

Robert

Typewritten Text

01 19 2024

Invoice

Date

1/23/2024

Invoice #

AUS099

Arcadis U.S., Inc.

Attn: Miranda Silano 1705 Metropolitan Boulevard Tallahassee, FL 32308 invoices_us@arcadis.com

P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511 ErwinRemediation@gmail.com

Site City

Coral Springs

Site Name

Lori-Al D140 Dry Cleaner

Total

Quantity Rate AmountDate Item

2 125.00 250.001/17/2024 Drum Disp - Non-Haz Groundwater

$250.00

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC037A 2 HW680

This change order authorizes a time extension of thirty days for IDW manifests and approval of the final deliverable.

Theresa Pepe 850-245-8966 Contractor Arcadis U.S. Inc. Contractor

Contractor Gus Suarez Contractor 813-205-4703

ERIC_4234

Lori-Al (D140) Dry Cleaner

$ 0.00 $ 0.00 Completion

✔ Completion 01/29/2024 02/28/2024 30

✔ 1 1 2

Arcadis U.S. Inc.

Contractor Gus Suarez

Contract Manager

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2024.01.26 13:46:01 -05'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.01.26 12:08:40 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW680

DC037A

$ 19,430.67

Fieldwork Activities

Well Installation & Sampling Report/IDW manifest/Project Management

FDEP approval of Fieldwork Activities

FDEP approval of Well Installation & Sampling Report/IDW manifest/Project Management

09/29/2023

02/14/2024

$ 3,158.26

$ 16,272.41