CN-370000-HW680-DC18BCO1.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|HW680|454e104ae8fbcb5641ac6acc30583968
Contract number
HW680
Issued by
Florida

About this file

This document comprises a Task Assignment (TA) and Task Assignment Change Order (TACO) between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S. Inc., a contractor. The primary TA (DC018B) was executed under Contract Number HW680, with the change order (TACO Number 1) dated May 28-29, 2024. The project involves environmental remediation and monitoring services at the Mariner Mall site (formerly Big B Cleaners) located at 4335 Fairfield Drive in Pensacola, Escambia County, Florida. The FDEP's Project Manager is Theresa Pepe (850-245-8966), and Arcadis's Project Manager is Gus Suarez (813-205-4703).

The original TA valued at $16,114.80 authorizes Arcadis to conduct annual groundwater monitoring from select wells and prepare deliverables including an annual monitoring report and project management documentation, with completion scheduled for October 11, 2024. The TACO increases the contract value by $904.64 to a new total of $17,019.42, authorizing additional hours to complete an off-site notice package based on recent PFAS sampling results. The cost increase encompasses two invoice components: $16,114.80 for FDEP approval of the annual monitoring report, IDW manifest, and project management, and $904.62 for FDEP approval of the off-site notice package. No changes were made to the project completion date or timeline. All activities are performed according to Arcadis's February 1, 2024 Work Plan, with labor costs distributed across five subtasks including project management, annual groundwater monitoring, reporting, and off-site notification.

View the file

Other files

File Type Posted
CN-370000-HW680-DC48ACO2.pdf PDF
CN-370000-HW680-DC038C.pdf PDF
CN-370000-HW680-HW11ACO3.pdf PDF
CN-370000-HW680-DC003A.pdf PDF
CN-370000-HW680-HW03ACO1.pdf PDF
CN-370000-HW680-DC46ACO2.pdf PDF
CN-370000-HW680-DC031C.pdf PDF
CN-370000-HW680-DC49ACO3.pdf PDF
CN-370000-HW680-HW04DCO1.pdf PDF
CN-370000-HW680-DC015B.pdf PDF
CN-370000-HW680-DC015D.pdf PDF
CN-370000-HW680-HW10ACO3.pdf PDF
CN-370000-HW680-HW001D.pdf PDF
CN-370000-HW680-DC031D.pdf PDF
CN-370000-HW680-DC05ACO1.pdf PDF
CN-370000-HW680-DC05BCO1.pdf PDF
CN-370000-HW680-DC06CCO1.pdf PDF
CN-370000-HW680-DC25BCO1.pdf PDF
CN-370000-HW680-DC034A.pdf PDF
CN-370000-HW680-DC009A.pdf PDF
CN-370000-HW680-DC31BCO1.pdf PDF
CN-370000-HW680-DC046B.pdf PDF
CN-370000-HW680-DC047B.pdf PDF
CN-370000-HW680-HW003D.pdf PDF
CN-370000-HW680-DC039B.pdf PDF
CN-370000-HW680-HW22ACO4.pdf PDF
CN-370000-HW680-DC14BCO7.pdf PDF
CN-370000-HW680-SA159CO2.pdf PDF
CN-370000-HW680-HW09ACO1.pdf PDF
CN-370000-HW680-HW05CCO2.pdf PDF
CN-370000-HW680-DC004C.pdf PDF
CN-370000-HW680-DC009C.pdf PDF
CN-370000-HW680-HW05CCO1.pdf PDF
CN-370000-HW680-HW11ACO5.pdf PDF
CN-370000-HW680-HW023A.pdf PDF
CN-370000-HW680-DC042B.pdf PDF
CN-370000-HW680-DC50ACO1.pdf PDF
CN-370000-HW680-DC004B.pdf PDF
CN-370000-HW680-DC40BCO1.pdf PDF
CN-370000-HW680-DC011D.pdf PDF
CN-370000-HW680-DC020B.pdf PDF
CN-370000-HW680-DC42ACO1.pdf PDF
CN-370000-HW680-SA293.pdf PDF
CN-370000-HW680-SA322CO4.pdf PDF
CN-370000-HW680-DC43ACO1.pdf PDF
CN-370000-HW680-PA376CO4.pdf PDF
CN-370000-HW680-DC03BCO2.pdf PDF
CN-370000-HW680-DC37ACO3.pdf PDF
CN-370000-HW680-SA177.pdf PDF
CN-370000-HW680-DC15ACO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

DC018B 1 HW680

This change order authorizes additional hours to complete an off-site notice package.

Theresa Pepe 850-245-8966 Arcadis U.S. Inc.

Gus Suarez 813-205-4703

ERIC_4657

Mariner Mall (formerly Big B Cleaners)

$ 17,019.42 $ 16,114.80

$ 17,019.42 $ 16,114.80

10/11/2024 10/11/2024 0

1 1 1

Arcadis U.S. Inc.

Gus Suarez

Contract Manager

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2024.05.29 09:51:42 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2024.05.28 15:28:22 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Negotiation File Mariner Mall (formerly Big B Cleaners) Facility ID No. 17-9700554; ERIC_4657 Pensacola, Escambia County FROM: Theresa C. Pepe, Project Manager SUBJECT: Task Assignment Change Order DC018B-1 (HW680) DATE: May 9, 2024

Arcadis U.S. Inc. will submit an off-site notice package based on the results of recent PFAS sampling.

The original task assignment equaled $16,114.80. This change order increases costs by $904.64 (rounding error of -.02) for a new total of $17,019.42. There is no time change to the task assignment. Arcadis may invoice according to the attached schedule.

Specific negotiated subtasks are as follows:

Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor. Since Arcadis’ labor hours increased, the project management increased accordingly.

Subtask 4: Off-Site Notice Arcadis will submit an off-site notice package for one property based on the recent sampling and at the request of the Waste Site Cleanup Section’s geologist. No other changes are required.

FDEP COST ESTIMATE

$85.87 Project Manager Suarez, Gus (GS)

$60.88 Principal Scientist O'Sullivan, Michael (MOS)

$28.94 Scientist Martineau, Duncan (DM)

$39.67 Drafter/Designer Oliva, Brian (BO)

$34.40 Drafter/Designer Berndgen, Wendy (WDB)

$35.00 Document Technician Ballheim, Debra (DJB)

$30.00 Document Technician Embras, Susan (SRE)

$37.25 Project Assistant Cruz, Michele (MC)

79.00%

36.00%

37.10%

SITE : Mariner Mall (formerly Big B Cleaners) SUBTASK 4: Off-Site Notification

DATE: 2/1/2024

LABOR CATEGORY

STAFF-TITLE WORK DESCRIPTION HOURS

Annual Groundwater Monitoring Report - 2024

Principal (MOS) Project coordination/H&S/final review of offsite notice package 1

Principal (MOS) Offsite notification package 1 site (1.0 hrs per Site) 2

Project Assistant Offsite notification package 1 site assembly 1

Draftsperson Offsite notification package 1 site inventory/figure preparation/drafting 2

TOTAL LABOR 6

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 0 $0.00 $0.00

TOTAL VEHICLE $0.00

SUBCONTRACTOR COSTS

Services Procurement

Name Purpose Rate Units Usage Totals

IDW Drum Transportation and Disposal IDW $200.00 Per Drum 0 $0.00

EON PDB's $703.00 Lump Sum 0 $0.00

Handling Fee $0.00 Per Month 0 $0.00

Total Services: $0.00

TOTAL $0.00

LABORATORY COSTS

Analytical Costs

Parameter Method Media Rate Turn Around Total Samples Totals

VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 0 $0.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00

Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Expendables

Miscellaneous Expendables $40.00 Per Day 0 $0.00

Total Expendables: $0.00

Equipment Items

Tubing, Poly/HDPE $0.30 Per Foot $0.00

55-gallon Drum $100.00 Each 0 $0.00

Total Equipment Items: $0.00

Equipment Kits

Deep Groundwater Sampling Kit $415.00 Day 0 $0.00

Shallow Groundwater / Soil Vapor Screening Kit $290.00 Day 0 $0.00

Total Equipment Kits: $0.00

TOTAL EQUIPMENT $0.00

Contractor: Arcadis, U.S., Inc.

Date: 2/1/2024

Task #: SubTask 1 Project Management Site: Mariner Mall (formerly Big B Cleaners) SubTask 2 Annual Groundwater Monitoring

Activity/Phase: Monitoring SubTask 3 Reporting Project Manager: Gus Suarez SubTask 4 Off-Site Notice

SubTask 5

Totals 1 2 3 4 5

Labor Rate Category

$85.87 Project Manager Suarez, Gus (GS) 0 0.4

$60.88 Principal Scientist O'Sullivan, Michael (MOS) 3 0 0 3 0 $67.57 Principal Engineer Perella, John (JP) 0 0 0 0 0

$50.00 Senior Engineer Hanna, Chad (CH) 0 0 0 0 0 $28.94 Scientist Martineau, Duncan (DM) 0 0 0 0 0

$39.67 Drafter/Designer Oliva, Brian (BO) 0 0 0 0 0

$34.40 Drafter/Designer Berndgen, Wendy (WDB) 2 0 0 2 0

$35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0

$30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0

$37.25 Project Assistant Cruz, Michele (MC) 1 0 0 1 0

Total Hours 6 0 0 0 6 0

Direct Labor $326.22 $37.53 $0.00 $0.00 $288.69 $0.00

Overhead 79.00% $257.72 $29.65 $0.00 $0.00 $228.07 $0.00

Gen & Admin 36.00% $117.44 $13.51 $0.00 $0.00 $103.93 $0.00

Fringe 37.10% $121.02 $13.92 $0.00 $0.00 $107.10 $0.00

Total Labor $822.40 $94.61 $0.00 $0.00 $727.79 $0.00

Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

PDB's - EON $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00

IDW - T&D - Erwin $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $822.40 $94.61 $0.00 $0.00 $727.79 $0.00

Completion Fee $82.24 $9.46 $0.00 $0.00 $72.78 $0.00

Total Estimated Cost $904.64 $104.07 $0.00 $0.00 $800.57 $0.00

REV: 02/03 CEF ARCADIS Page 1

SUBTASK 4: Off-Site Notice

DATE:

LABOR CATEGORY

STAFF-TITLE WORK DESCRIPTION HOURS

Annual Groundwater Monitoring Report - 2024

Principal (MOS) Project coordination/H&S/final review of offsite notice package 1

Principal (MOS) Offsite notification package 1 site (1.0 hrs per Site) 2

Project Assistant Offsite notification package 1 site assembly 1

Draftsperson Offsite notification package 1 site inventory/figure preparation/drafting 2

TOTAL LABOR 6

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 0 $0.00 $0.00

TOTAL VEHICLE $0.00

SUBCONTRACTOR COSTS

Services Procurement

Name Purpose Rate Units Usage Totals

IDW Drum Transportation and Disposal IDW $200.00 Per Drum 0 $0.00

EON PDB's $703.00 Lump Sum 0 $0.00

Handling Fee $0.00 Per Month 0 $0.00

Total Services: $0.00

TOTAL $0.00

LABORATORY COSTS

Analytical Costs

Parameter Method Media Rate Turn Around Total Samples Totals

VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 0 $0.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00

Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Expendables

Miscellaneous Expendables $40.00 Per Day 0 $0.00

Total Expendables: $0.00

Equipment Items

Tubing, Poly/HDPE $0.30 Per Foot $0.00

55-gallon Drum $100.00 Each 0 $0.00

Total Equipment Items: $0.00

Equipment Kits

Deep Groundwater Sampling Kit $415.00 Day 0 $0.00

Shallow Groundwater / Soil Vapor Screening Kit $290.00 Day 0 $0.00

Contractor: Arcadis, U.S., Inc.

Date: 2/1/2024

Task #: SubTask 1 Project Management Site: Mariner Mall (formerly Big B Cleaners) SubTask 2 Annual Groundwater Monitoring

Activity/Phase: Monitoring SubTask 3 Reporting Project Manager: Gus Suarez SubTask 4

SubTask 5

Totals 1 2 3 4 5

Labor Rate Category

$85.87 Project Manager Suarez, Gus (GS) 6 5.8

$60.88 Principal Scientist O'Sullivan, Michael (MOS) 38 18 20 0 0 $67.57 Principal Engineer Perella, John (JP) 0 0 0 0 0

$50.00 Senior Engineer Hanna, Chad (CH) 0 0 0 0 0 $28.94 Scientist Martineau, Duncan (DM) 32 32 0 0 0

$39.67 Drafter/Designer Oliva, Brian (BO) 6 0 6 0 0

$34.40 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0

$35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0

$30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0

$37.25 Project Assistant Cruz, Michele (MC) 10 4 6 0 0

Total Hours 92 6 54 32 0 0

Direct Labor $4,350.55 $500.51 $2,170.92 $1,679.12 $0.00 $0.00

Overhead 79.00% $3,436.93 $395.40 $1,715.03 $1,326.50 $0.00 $0.00

Gen & Admin 36.00% $1,566.19 $180.18 $781.53 $604.48 $0.00 $0.00

Fringe 37.10% $1,614.05 $185.69 $805.41 $622.95 $0.00 $0.00

Total Labor $10,967.72 $1,261.78 $5,472.89 $4,233.05 $0.00 $0.00

Travel

Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $360.00 $360.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

PDB's - EON $703.00 $703.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $703.00 $703.00 $0.00 $0.00 $0.00

Procurement Fee $70.30 $70.30 $0.00 $0.00 $0.00

Total Subcontractor Cost $773.30 $773.30 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00

IDW - T&D - Erwin $190.00 $190.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $190.00 $190.00 $0.00 $0.00 $0.00

Handling Fee $19.00 $19.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $209.00 $209.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $1,533.00 $1,533.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00

Total Laboratory $1,683.00 $1,683.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $120.00 $120.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $705.00 $705.00 $0.00 $0.00 $0.00

Equipment (IDW related) $200.00 $200.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $1,025.00 $1,025.00 $0.00 $0.00 $0.00

Subtotal $15,018.02 $1,261.78 $9,523.19 $4,233.05 $0.00 $0.00

Completion Fee $1,096.78 $126.18 $547.29 $423.31 $0.00 $0.00

Total Estimated Cost $16,114.80 $1,387.96 $10,070.48 $4,656.36 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

SUBTASK 2: Annual Groundwater Monitoring

DATE: 2/1/2024

LABOR CATEGORY

STAFF-TITLE WORK DESCRIPTION HOURS

Annual Groundwater Monitoring - 2024

Principal Scientist Property owners notification and site access agreement updates-five properties (10 hrs), PG oversight with field crew (3 hrs); Technical/trend analysis (5 hr) 18

Scientist Mob/demob, prepare sampling kits/equipment (8 hrs), DTW/field measurements, pdb sampling/deployment 21 wells (24 hrs) 32

Project Assistant Sample container ordering, preparation, electronic transcriptions of field data 4

TOTAL LABOR 54

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 3 $360.00 $360.00

TOTAL VEHICLE $360.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals

EON PDB's $703.00 Per Day 1 $703.00

Total Equip.: $703.00

Services Procurement

Name Purpose Rate Units Usage Totals

IDW Drum Transportation and Disposal IDW $95.00 Per Drum 2 $190.00

$0.00 Lump Sum 0 $0.00

Handling Fee $0.00 Per Month 0 $0.00

Total Services: $190.00

TOTAL $893.00

LABORATORY COSTS

Analytical Costs

Parameter Method Media Rate Turn Around Total Samples Totals

VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 21 $1,533.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $1,533.00

Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 1 $150.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $150.00

TOTAL LAB $1,683.00

EQUIPMENT

Expendables

Miscellaneous Expendables $40.00 Per Day 3 $120.00

Total Expendables: $120.00

Equipment Items

Tubing, Poly/HDPE $0.30 Per Foot $0.00

55-gallon Drum $100.00 Each 2 $200.00

Total Equipment Items: $200.00

Equipment Kits

Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00

Deep Groundwater Sampling Kit $415.00 Day 1 $415.00

Total Equipment Kits: $705.00

TOTAL EQUIPMENT $1,025.00

SUBTASK 3: Reporting

DATE: 2/1/2024

LABOR CATEGORY

STAFF-TITLE WORK DESCRIPTION HOURS

Annual Groundwater Monitoring Report - 2024

Principal Scientist PG trend analysis, certification of report (2 hrs) 2

Principal Scientist Report preparation (10 hrs), tables (4 hrs), figures (4 hrs) 18

Drafter/Designer BO Figures, graphs generation for report, ADaPT upload (6 hrs) 6

Project Assistant Word Processing, database update,report assembly/submittal/upload (6 hrs) 6

TOTAL LABOR 32

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 0 $0.00 $0.00

TOTAL VEHICLE $0.00

SUBCONTRACTOR COSTS

Services Procurement

Name Purpose Rate Units Usage Totals

IDW Drum Transportation and Disposal IDW $200.00 Per Drum 0 $0.00

EON PDB's $703.00 Lump Sum 0 $0.00

Handling Fee $0.00 Per Month 0 $0.00

Total Services: $0.00

TOTAL $0.00

LABORATORY COSTS

Analytical Costs

Parameter Method Media Rate Turn Around Total Samples Totals

VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 0 $0.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00

Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Expendables

Miscellaneous Expendables $40.00 Per Day 0 $0.00

Total Expendables: $0.00

Equipment Items

Tubing, Poly/HDPE $0.30 Per Foot $0.00

55-gallon Drum $100.00 Each 0 $0.00

Total Equipment Items: $0.00

Equipment Kits

Deep Groundwater Sampling Kit $415.00 Day 0 $0.00

Shallow Groundwater / Soil Vapor Screening Kit $290.00 Day 0 $0.00

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW680

DC018B Completion October 11, 2024

Arcadis will conduct annual groundwater monitoring from select wells at the site. All activities will be performed according to the February 1, 2024, Work Plan submitted by Arcadis.

Theresa Pepe 850-245-8966 Contractor Arcadis U.S. Inc. Contractor

Contractor Gus Suarez Contractor 813-205-4703

ERIC_4657

4335 Fairfield Drive, Pensacola, Escambia County

Mariner Mall (formerly Big B Cleaners)

Contractor Contractor

$ 16,114.80

$ 16,114.80

Scope of Work

Arcadis U.S. Inc.

Contractor

Gus Suarez

Contract Manager

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2024.02.19 11:23:54 -05'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.02.19 11:07:12 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Annual Monitoring Report/IDW manifest/Project Management 08/30/2024

FDEP approval of Annual Monitoring Report/IDW manifest/Project Management $ 16,114.80

$ 16,114.80

HW680

DC018B