This document package comprises a Task Assignment (TA) and a Task Assignment Change Order (TACO) between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S. Inc. The contract is identified as HW680, with the task assignment numbered HW004D and the change order numbered 1. The work is being conducted at the Saufley Construction and Demolition (C&D) Facility (State Site No. 197, ERIC_3967) located at 5660 Saufley Field Road in Pensacola, Escambia County, Florida. The FDEP's project manager is Theresa Pepe, and Arcadis's project manager is Gus Suarez.
The original task assignment valued at $23,115.61 authorized Arcadis to conduct an annual monitoring event for site contaminants and PFAS sampling according to a January 23, 2024 Work Plan, with a completion date of July 31, 2024. The change order, effective July 10, 2024, increases the total contract value to $28,896.90, representing an increase of $5,781.29 (with a rounding error of $0.03). This increase funds additional hours to complete an off-site notice package addendum for approximately ten properties based on recent PFAS sampling results. The deliverables include PFAS sampling, annual monitoring report/IDW manifest/project management, and an off-site notice package, with invoicing contingent upon FDEP approval of each component. No time extension was granted, and the completion date remains July 31, 2024. The contract operates under a fixed unit rate basis, and all terms and conditions of the original task assignment remain in effect.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. ☐ There are no changes to the TA compensation.
☐ The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO ☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. ☐ There are no changes to the TA Expiration Date.
☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. ☐ There are no changes to the Attachments.
☐ Attachment ___ is replaced with Attachment -____.
7. ☐ No Additional Changes.
☐ Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW004D 1 HW680
This change order authorizes additional hours to complete an off-site notice package.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_3967
Saufley C&D Facility
$ 28,896.90 $ 23,115.61
$ 28,896.90 $ 23,115.61 ✔ Completion
Completion 07/31/2024 07/31/2024 0
✔ 1 1 1
Arcadis U.S. Inc.
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2024.07.10 16:39:12 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2024.07.10 16:11:24 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01_18
Contract Number:
Task Assignment #:
Change Order #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW680
HW004D
$ 28,896.90
PFAS sampling
Annual Monitoring Report/IDW manifest/Project Management
Off-Site Notice Package
FDEP approval of PFAS sampling
FDEP approval of Off-Site Notice Package
FDEP approval of Annual Monitoring Report/IDW manifest/Project Management
05/31/2024
06/07/2024
06/28/2024
$ 17,534.02
$ 6,246.71
$ 5,116.17
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Saufley C&D Facility State Site No. 197; ERIC_3967 Pensacola, Escambia County FROM: Theresa C. Pepe, Project Manager SUBJECT: Task Assignment Change Order HW004D-1 (HW680) DATE: June 12, 2024
Arcadis U.S. Inc. will submit an off-site notice package based on the results of recent PFAS sampling.
The original task assignment equaled $23,115.61. This change order increases costs by $5,781.26 (rounding error of .03) for a new total of $28,896.90. There is no time change to the task assignment. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor. Since Arcadis’ labor hours increased, the project management increased accordingly.
Subtask 4: Off-Site Notice Arcadis will submit an off-site notice package addendum for approximately ten properties based on the recent sampling. No other changes are required.
FDEP COST ESTIMATE
Contractor: Arcadis, U.S., Inc.
Date: 6/10/2024
Task #: SubTask 1 Project Management
Site: Saufley C&D Landfill ERIC_3967 SubTask 2 PFAS Samping
Activity/Phase: Monitoring SubTask 3 Annual GW Monitoring and Reporting
Project Manager: Gus Suarez SubTask 4 Off'Site Notification
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$85.87 Project Manager Suarez, Gus (GS) 10 9.5
$60.88 Principal Scientist O'Sullivan, Michael (MOS) 26 2 18 6 0
$50.00 Senior Scientist O'Connell, Patrick (PJO) 22 6 6 10 0
$35.19 Staff Scientist Boros, Anthony (AB) 58 18 40 0 0
$28.94 Scientist Martineau, Duncan (DM) 4 0 4 0 0
$39.67 Drafter/Designer Oliva, Brian (BO) 25 0 5 20 0
$34.40 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0
$35.00 Document Technician Ballheim, Debra (DJB) 3 0 3 0 0
$30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0
$37.25 Project Assistant Cruz, Michele (MC) 9 2 2 5 0
Total Hours 157 9.5 28.0 78.0 41 0
Direct Labor $7,086.98 $815.32 $1,129.68 $3,297.05 $1,844.93 $0.00
Overhead 79.00% $5,598.71 $644.10 $892.45 $2,604.67 $1,457.49 $0.00
Gen & Admin 36.00% $2,551.31 $293.52 $406.68 $1,186.94 $664.17 $0.00
Fringe 37.10% $2,629.27 $302.48 $419.11 $1,223.21 $684.47 $0.00
Total Labor $17,866.27 $2,055.42 $2,847.92 $8,311.87 $4,651.06 $0.00
Travel
Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $360.00 $360.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW T&D - Erwin $190.00 $190.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $190.00 $190.00 $0.00 $0.00 $0.00
Handling Fee $19.00 $19.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $209.00 $209.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $5,680.00 $0.00 $5,680.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $560.00 $110.00 $450.00 $0.00 $0.00
Total Laboratory $6,240.00 $110.00 $6,130.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $120.00 $120.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $200.00 $200.00 $0.00 $0.00 $0.00
Equipment (Other) $2,115.00 $2,115.00 $0.00 $0.00 $0.00
Total Field Expenses $2,435.00 $2,435.00 $0.00 $0.00 $0.00
Subtotal $27,110.27 $2,055.42 $5,961.92 $14,441.87 $4,651.06 $0.00
Completion Fee $1,786.63 $205.54 $284.79 $831.19 $465.11 $0.00
Total Estimated Cost $28,896.90 $2,260.96 $6,246.71 $15,273.06 $5,116.17 $0.00
Cost from Prior CEF: $23,115.61 Manual Entry
Cost from Delta CEF; $5,781.26 Manual Entry
Cost (Prior + Delta): $28,896.87 Auto-Calculated
Rounding Error: $0.03 Auto-Calculated
Final Total Cost: $28,896.90 Auto-Calculated
SITE : Saufley C&D Landfill ERIC_3967 SUBTASK 4: Off-Site Notification
DATE: 6/10/2024
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Off-Site Notificaton Packages Principal Project oversight/final write-up of offsite notice package 6 Senior Offsite notification package 10 sites (1.0 hrs per Site) 10 Project Assistant Offsite notification package 10 sites assembly 5 Draftsperson Offsite notification package 10 sites inventory/figure preparation/drafting 20
TOTAL LABOR 41
Date: 6/10/2024
Task #: SubTask 1 Project Management Site: Saufley C&D Landfill ERIC_3967 SubTask 2 PFAS Samping
Activity/Phase: Monitoring SubTask 3 Annual GW Monitoring and Reporting Project Manager: Gus Suarez SubTask 4 Off-Site Notification
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$85.87 Project Manager Suarez, Gus (GS) 3 2.8 $60.88 Principal Scientist O'Sullivan, Michael (MOS) 6 0 0 6 0 $50.00 Senior Scientist O'Connell, Patrick (PJO) 10 0 0 10 0 $35.19 Staff Scientist Boros, Anthony (AB) 0 0 0 0 0 $28.94 Scientist Martineau, Duncan (DM) 0 0 0 0 0 $28.94 Scientist Brutscher, Katherine (KEB) 0 0 0 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 20 0 0 20 0 $34.40 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0 $35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0 $37.25 Project Assistant Cruz, Michele (MC) 5 0 0 5 0
Total Hours 44 3 0 0 41 0
Direct Labor $2,084.77 $239.84 $0.00 $0.00 $1,844.93 $0.00
Overhead 79.00% $1,646.96 $189.47 $0.00 $0.00 $1,457.49 $0.00 Gen & Admin 36.00% $750.51 $86.34 $0.00 $0.00 $664.17 $0.00 Fringe 37.10% $773.45 $88.98 $0.00 $0.00 $684.47 $0.00 Total Labor $5,255.69 $604.63 $0.00 $0.00 $4,651.06 $0.00
Travel Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW - T&D $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $5,255.69 $604.63 $0.00 $0.00 $4,651.06 $0.00 Completion Fee $525.57 $60.46 $0.00 $0.00 $465.11 $0.00
Total Estimated Cost $5,781.26 $665.09 $0.00 $0.00 $5,116.17 $0.00
REV: 02/03 CEF ARCADIS Page 1
SUBTASK 4: Off-Site Notification
DATE: 6/10/2024
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Off-Site Notificaton Packages Principal Project oversight/final write-up of offsite notice package 6 Senior Offsite notification package 10 sites (1.0 hrs per Site) 10 Project Assistant Offsite notification package 10 sites assembly 5 Draftsperson Offsite notification package 10 sites inventory/figure preparation/drafting 20
TOTAL LABOR 41
Date: 10/30/2023
Task #: SubTask 1 Project Management Site: Saufley C&D Landfill ERIC_3967 SubTask 2 PFAS Samping
Activity/Phase: Monitoring SubTask 3 Annual GW Monitoring and Reporting Project Manager: Gus Suarez SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$85.87 Project Manager Suarez, Gus (GS) 7 6.7 $60.88 Principal Scientist O'Sullivan, Michael (MOS) 20 2 18 0 0 $50.00 Senior Scientist O'Connell, Patrick (PJO) 12 6 6 0 0 $35.19 Staff Scientist Boros, Anthony (AB) 58 18 40 0 0 $28.94 Scientist Martineau, Duncan (DM) 4 0 4 0 0 $28.94 Scientist Brutscher, Katherine (KEB) 0 0 0 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 5 0 5 0 0 $34.40 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0 $35.00 Document Technician Ballheim, Debra (DJB) 3 0 3 0 0 $37.25 Project Assistant Cruz, Michele (MC) 4 2 2 0 0
Total Hours 113 7 28 78 0 0
Direct Labor $5,002.20 $575.47 $1,129.68 $3,297.05 $0.00 $0.00
Overhead 79.00% $3,951.74 $454.62 $892.45 $2,604.67 $0.00 $0.00 Gen & Admin 36.00% $1,800.79 $207.17 $406.68 $1,186.94 $0.00 $0.00 Fringe 37.10% $1,855.82 $213.50 $419.11 $1,223.21 $0.00 $0.00 Total Labor $12,610.55 $1,450.76 $2,847.92 $8,311.87 $0.00 $0.00
Travel Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW - T&D $190.00 $190.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $190.00 $190.00 $0.00 $0.00 $0.00 Handling Fee $19.00 $19.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $209.00 $209.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $5,680.00 $0.00 $5,680.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $560.00 $110.00 $450.00 $0.00 $0.00 Total Laboratory $6,240.00 $110.00 $6,130.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $120.00 $0.00 $0.00 $0.00 Equpipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $200.00 $200.00 $0.00 $0.00 $0.00 Equipment (Other) $2,115.00 $2,115.00 $0.00 $0.00 $0.00 Total Field Expenses $2,435.00 $2,435.00 $0.00 $0.00 $0.00
Subtotal $21,854.55 $1,450.76 $5,961.92 $14,441.87 $0.00 $0.00 Completion Fee $1,261.06 $145.08 $284.79 $831.19 $0.00 $0.00
Total Estimated Cost $23,115.61 $1,595.84 $6,246.71 $15,273.06 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SUBTASK 2: PFAS Samping
DATE: 10/30/2023
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
PFAS Samping Principal PG oversight of field staff and results 2 Senior Sci Field support to sample up to 16 wells (3 hrs) prepare electronic delivery of results (3 hr) 6 Staff Sci Prep (2 hr), travel and sample up to 16 wells (16 hr) 18 Proejct Assisstant Field support; Sample tracking 2
TOTAL LABOR 28
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 3 $360.00 $360.00
TOTAL VEHICLE $360.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals IDW Drum Transportation and Disposal IDW $95.00 Drum 2 $190.00 NAME OF COMPANY On-site Mobile Laboratory analysis $0.00 Lump Sum 0 $0.00
Handling Fee $0.00 Per Month 0 $0.00 Total Services: $190.00
TOTAL $190.00
LABORATORY COSTS
Analytical Costs Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 1 $110.00
Total Shipping: $110.00
TOTAL LAB $110.00
EQUIPMENT
Expendables Miscellaneous Expendables $40.00 Per Day 3 $120.00
Total Expendables: $120.00 Equipment Items 55-gallon Drum $100.00 Each 2 $200.00 [add'l equipment] $0.00 [Unit] 0 $0.00
Total Equipment Items: $200.00 Equipment Kits Shallow Groundwater Sampling Kit $290.00 Day 3 $870.00 Deep Groundwater Sampling Kit $415.00 Day 3 $1,245.00
Total Equipment Kits: $2,115.00
TOTAL EQUIPMENT $2,435.00
SUBTASK 3: Annual GW Monitoring and Reporting
DATE: 10/30/2023
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Annual Groundwater Monitoring - 2024 Principal PG oversight of field staff and results 2 Senior Sci Field support, IDW management (4 hrs) prepare electronic delivery of results (2 hr) 6 Staff Sci Prep (2 hr), travel and sample up to 16 deep wells (32 hr), water levels for ~16 wells (6 hr) 40 Project Assisstant Field support; Sample tracking 2 Data Evaluation and Letter Report Principal Scientist Data evaluation and preparation of a brief letter report; sign and seal report 16 Scientist Data evaluation 4 Drafter Figures preparation 5 Document Technician Editing; Letter report preparation 3
TOTAL LABOR 78
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
SUBCONTRACTOR COSTS
Services Procurement
Name Purpose Rate Units Usage Totals IDW Drum Transportation and Disposal IDW $95.00 Drum 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
Nitrogen, Ammonia (as N) - 7664-41-7 SM4500NH3C Aqueous $24.00 1.00 16 $384.00 Nitrate as N - 14797-55-8 E300 Aqueous $23.00 1.00 16 $368.00 Total dissolved solids - TDS SM2540C Aqueous $16.00 1.00 16 $256.00 Aluminum - 7429-90-5 SW6010C Aqueous $13.50 1.00 16 $216.00 Arsenic - 7440-38-2 SW6010C Aqueous $14.00 1.00 16 $224.00 Cadmium - 7440-43-9 SW6010C Aqueous $14.00 1.00 16 $224.00 Chromium - 7440-47-3 SW6010C Aqueous $14.00 1.00 16 $224.00 Iron - 7439-89-6 SW6010C Aqueous $13.50 1.00 16 $216.00 1,4-Dioxane - 123-91-1 8260 SIM Aqueous $150.00 1.00 16 $2,400.00 VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 16 $1,168.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $5,680.00 Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 3 $450.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $450.00
TOTAL LAB $6,130.00
EQUIPMENT
Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 0 $0.00 55-gallon Drum $100.00 Each $0.00
Total Equipment Items: $0.00 Equipment Kits Deep Groundwater Sampling Kit $415.00 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
From: OSullivan, Mike To: Pepe, Theresa Subject: Re: PFAS Groundwater Monitoring Email, for the Saufley Construction and Demolition (C&D) Facility, ERIC_3967 Date: Monday, June 10, 2024 3:10:54 PM Attachments: image002.png image003.png image004.png image005.png image006.png Outlook-zzpqkfbd.png Outlook-A picture .png Outlook-Shape Des.png Outlook-Shape Des.png Outlook-Shape Des.png HW680 CEF (ARC)_2024_Saufley C&D- PFAS & AGM - Final.xlsx HW680 CEF (ARC)_2024_Saufley C&D- PFAS & AGM.xlsm HW680 CEF (ARC)_2024_Saufley C&D- PFAS & AGM - Delta.xlsm
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Theresa, Going forward, MW-13B will be marked as “Destroyed/Missing” on all the figures.
MW-16 was not sampled because it was dry.
Please see the attached CEF/LOEs for the off-site notification TACO.
Thanks, Mike
Mike O’Sullivan PG Principal Geologist Arcadis U.S., Inc.
1705 Metropolitan Boulevard Tallahassee, FL | 32308 | USA T +1 850 895 4739 M +1 850 491 2346 www.arcadis.com
Professional Geologist / PG-FL, 2468
From: Pepe, Theresa <Theresa.Pepe@FloridaDEP.gov> Sent: Friday, June 7, 2024 12:04 PM To: OSullivan, Mike <Mike.OSullivan@arcadis.com> Subject: RE: PFAS Groundwater Monitoring Email, for the Saufley Construction and Demolition (C&D) Facility, ERIC_3967
Arcadis Warning: Exercise caution with email messages from external sources such as this message. Always verify the sender and avoid clicking on links or scanning QR codes unless certain of their authenticity.
mailto:Mike.OSullivan@arcadis.com mailto:Theresa.Pepe@FloridaDEP.gov https://secure-web.cisco.com/18WeqOnG4f7HOLM3MrNT5z0anG8lR0tFC3wEZWqjofpyiIFd76WkjETmulUs4nSX33cVRWpKFvARR7IMuG8JdErF9AFmVabBi7ccMS6m0KH8QnbrLQKukoEsQUfANjzWkHgXtZY9WnjZ1KoPNKfBZtX40pPK8-2xZqJObGLqlbqsmAvGZr3Pf4a3gEBYvssb7yyi_LMk6e5ycniQiy6-7Y1qwLIlUJHF9eL0oFVLWUNhU8ScWpoCeHXYQrheeM9CEudeAf95KkymH7H3bEc2fM8VUIdXboCbipEOmj0qIv6OH_coOwZ4GD4kTpvada8eVNju30A3O_FnUbDjsPxf-pg/https%3A%2F%2Fnam02.safelinks.protection.outlook.com%2F%3Furl%3Dhttp%253A%252F%252Fwww.arcadis.com%252F%26data%3D04%257C01%257C%257C207aab84dc954cc18b0308d8b4066518%257C7f90057d3ea046feb07ce0568627081b%257C0%257C0%257C637457286965667089%257CUnknown%257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%253D%257C1000%26sdata%3Do72ZsbrswpvDLlEIuzTlH6qj%252BNaPYFi9CI3V8hSudnY%253D%26reserved%3D0 http://secure-web.cisco.com/1QUGVtr4F40PiaO79ehBLsjyPvr1TqHSuv05_4lCszUGNmll3BLsZxkhCHr6YBIEkC7TCg0r9UkvdZ1VAKWnVFDVfwWBgDik2Sd46Jk8XTKfi13KfSMyZsnvoDaUHqSPXoWP3aAPtTyCTXltKRR3BGTN75GS7oXSHVisHYRsocjmbGBZ0dk-jw7NyDDZTu9Iy8HOjC7jDgs-cIDe-Hx2pRPEz90xEpFwWOjgV_CuQAlL3dGS6MPvtxwhNwrsjaRp9RNc2bwGFNxgcEd7UB_8gajmFeA_MwVdyHtaxE67wrvwixWoakuSk2O6s6gs6llLVhTNqwvfYqbwmMiCP3sVVLQ/http%3A%2F%2Fwww.arcadis.com%2F https://secure-web.cisco.com/1ZfwIfFeg1y6Qf5GYl9kYW3aYw1xwqGOIar7IAHa_lF1lLd6ZpFB_k5EVGazZ1ZrfmRGNGrR6wCl2XnNmHt9tpBB77FnmONSGGjELUXFYQPMnmE4SYc0nK1RIORQj-NclPwZWox1-ZFZseHE6LsrnsFo0r51JYEbp1sf6dMmIEHAmDh1I6TcsSlXP1NRtNh2_NqciOgrDaqcti0BPk7LQVscOITHbCkkC4TLsoSTRGTkDPCII5BMMGySc22tIgc4CCjjK-Xv5Njc-CrAfPRyBHgAWcY2pdidQX7iSmrhAHtQ9B-VG9wzEoc7QPVdTlTn0MuwBroiQv8A9o3l91pB-Dw/https%3A%2F%2Fwww.linkedin.com%2Fshowcase%2Farcadis-north-america%2F https://secure-web.cisco.com/186NRD70B_MXEpFSfLlBHRD7fQRw0v2VGsJszGCX0v_gw61BSeb7AZGvMKQapEXaWnfy6htOE1wcXGZ_GPpr8iVwc_pjbk5okNGutGN2pj5bW2GOkKqJirh8zA5lEKpxMWjIJgHN8i9eJEVFmCGi5PABNQ-l5ey47uCtVYHbzD1f-cnkeNg3qjlOB0jC5kkt07r6ob4y-Tg6xvhZFrsb2S2PYl9rWQg9kuz2T6dSPvALdcvkVawiom8fuNcgbgqLxjeXb6EpmHYvdAtG3pdO4pwb2fKCIDh5fG3V-D-HsRvpM6OP6rxArpP1OjVXxS4jHWUyOc7XyVMrdpgZgHfCpqg/https%3A%2F%2Ftwitter.com%2FArcadis_NA%3Fref_src%3Dtwsrc%255Egoogle%257Ctwcamp%255Eserp%257Ctwgr%255Eauthor https://secure-web.cisco.com/1qCSizdt-5Bj2_eAcZ42d7UxQn8LY-FWLwbv0FVeqkJWY3Lf0bICULQIZ1dxjVa8T1O6QP5q-XWQkiX9o9_oGe3pDkz5wJkgFD4Kri0POW76ZT4pFuF3eyTm8b5uyyrTXUwlb5e1CR4BAP6Mbk19W18PAbqLIuUuelh_8fan-vs0_6wczm-3rvE9R9vNGUSLOb3KlqemV8mh7BUuIGAs76gwYqga0rq2KKpsz7VOcOn_KVyju_gZP57eFZqwo4u-WNvbHygqpieWcq5yT2kbDXd_8NgOK2qZg5rWJUyaLeLzVF7zo4ShJYkkUcjOqWJ_D8fg90r4Am7vt9JVGHOe7GQ/https%3A%2F%2Fwww.facebook.com%2FArcadisNorthAmerica%2F https://secure-web.cisco.com/13HhQy-9YiDkB-glhb1WBJxUgGg-UoqIhduzCPeTOSrRByVcpBALPuZVhohXCSwqLyUMz2jHcxagdSSuaLAuggUEeK-NKpuxSeFlau-R0XP9JNxzw7UJKr1iGhVapDQlVTTyNhggWyZEqc5tcpwGLH7Elc8Mhv9gZCqfDQxRJRPUih0lHg0MjC0JFfqBs0QGLilwjE2MJrI6y0Z7oWOU0a28jJmCmqpj_Tv-vQcNDbuJTvimNJjhntgDdxml3h8izTD4HGMZIBJ93gxf5i-Xy7ypJkwJU7943S9xSFcojz5GelJqsdM9X4Nd8g2BBE-12vEDWM9KYQHLdT1tBTnaNwQ/https%3A%2F%2Fwww.instagram.com%2Farcadisglobal%2F%3Fhl%3Den
Cost Estimate
Contractor: Arcadis, U.S., Inc.
Date: 6/10/24
Task #: SubTask 1 Project Management SubTask 6
Site: Saufley C&D Landfill ERIC_3967 SubTask 2 PFAS Samping SubTask 7
Activity/Phase: Monitoring SubTask 3 Annual GW Monitoring and Reporting SubTask 8
Project Manager: Gus Suarez SubTask 4 Off'Site Notification SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
$85.87 Project Manager Suarez, Gus (GS) 10 9.5
$100.00 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0 0 0 0 0 0
$88.68 Principal Engineer Burtnett, Susan (SB) 0 0 0 0 0 0 0 0 0 0
$85.87 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0 0 0 0 0 0
$81.66 Principal Scientist McManus, Andrew (ATM) 0 0 0 0 0 0 0 0 0 0
$80.79 Principal Scientist McMillan, Britt (BM) 0 0 0 0 0 0 0 0 0 0
$78.62 Principal Engineer Navon, Daria (DN) 0 0 0 0 0 0 0 0 0 0
$72.56 Principal Scientist Day, Chris (CD) 0 0 0 0 0 0 0 0 0 0
$67.07 Principal Scientist Burke, Brian (BRB) 0 0 0 0 0 0 0 0 0 0
$67.07 Principal Scientist McGlone, Douglas (DMc) 0 0 0 0 0 0 0 0 0 0
$66.87 Principal Scientist Dellay, Leah (LD) 0 0 0 0 0 0 0 0 0 0
$60.88 Principal Scientist O'Sullivan, Michael (MOS) 26 2 18 6 0 0 0 0 0 0
$50.00 Senior Scientist O'Sullivan, Michael (MOS) 0 0 0 0 0 0 0 0 0 0
$67.57 Principal Engineer Perella, John (JP) 0 0 0 0 0 0 0 0 0 0
$50.00 Senior Engineer Cardoso, Antonio (AC) 0 0 0 0 0 0 0 0 0 0
$50.00 Senior Engineer Gattenby, Jessica (JG) 0 0 0 0 0 0 0 0 0 0
$50.00 Senior Scientist Larenas, Athnony (AOL) 0 0 0 0 0 0 0 0 0 0
$50.00 Senior Scientist O'Connell, Patrick (PJO) 22 6 6 10 0 0 0 0 0 0
$50.00 Senior Scientist Gillespie, Julie (JG) 0 0 0 0 0 0 0 0 0 0
$50.00 Senior Engineer Cansler, Theresa (TC) 0 0 0 0 0 0 0 0 0 0
$50.00 Senior Engineer Hanna, Chad (CH) 0 0 0 0 0 0 0 0 0 0
$44.00 Project Engineer Romero Cotrino, Camilo (CR) 0 0 0 0 0 0 0 0 0 0
$44.00 Project Engineer Hays, Timothy (TH) 0 0 0 0 0 0 0 0 0 0
$39.34 Staff Scientist Mott, Lyndi (LM) 0 0 0 0 0 0 0 0 0 0
$39.34 Staff Scientist Riley, Joel (JR) 0 0 0 0 0 0 0 0 0 0
$39.34 Staff Scientist Chest, Mark (MC) 0 0 0 0 0 0 0 0 0 0
$39.34 Staff Engineer Vail, Zackary (ZTV) 0 0 0 0 0 0 0 0 0 0
$39.34 Staff Scientist Singer, Jennifer (JS) 0 0 0 0 0 0 0 0 0 0
$35.93 Survey Manager Schacht, Roland (RS) 0 0 0 0 0 0 0 0 0 0
$35.19 Staff Scientist Boros, Anthony (AB) 58 18 40 0 0 0 0 0 0 0
$28.94 Scientist Brooks, Eric (EAB) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist Salinas, Kendall (KS) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist Bishton, Dan (DB) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist Cochran, Laura (LC) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist Guarino, Andrew (AG) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist Martineau, Duncan (DM) 4 0 4 0 0 0 0 0 0 0
$28.94 Scientist Brutscher, Katherine (KEB) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist Nicke, Bert (BN) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist Escobar, Erica (EE) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist Taggert, Andrew (AT) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist Hernandez, Christopher (CH) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist Sykes, Amy (AS) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist Bajorek, Amaya (AB1) 0 0 0 0 0 0 0 0 0 0
$28.15 Scientist Estrada, Elena (EE1) 0 0 0 0 0 0 0 0 0 0
$27.02 Scientist Ross, Mackenzie (MR) 0 0 0 0 0 0 0 0 0 0
$26.77 Scientist Munoz, Jesus (JM) 0 0 0 0 0 0 0 0 0 0
$34.89 Technician Welch, David (DJW) 0 0 0 0 0 0 0 0 0 0
$33.40 Technician Dankerl, David (DJD) 0 0 0 0 0 0 0 0 0 0
$30.80 Technician Fortner, Kendrix (KLF) 0 0 0 0 0 0 0 0 0 0
$29.13 Technician Rhodes, John (JAR) 0 0 0 0 0 0 0 0 0 0
$33.80 Technician Fox, Brian (BF) 0 0 0 0 0 0 0 0 0 0
$33.80 Technician Perez, Rachel (RP) 0 0 0 0 0 0 0 0 0 0
$32.26 Technician Kontodaskalakis, Ryan (CK) 0 0 0 0 0 0 0 0 0 0
$21.20 Technician Ward, John (JW) 0 0 0 0 0 0 0 0 0 0
$39.67 Drafter/Designer Oliva, Brian (BO) 25 0 5 20 0 0 0 0 0 0
$34.40 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0 0 0 0 0 0
$35.00 Document Technician Ballheim, Debra (DJB) 3 0 3 0 0 0 0 0 0 0
$30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0 0 0 0 0 0
$37.25 Project Assistant Cruz, Michele (MC) 9 2 2 5 0 0 0 0 0 0
Total Hours 157 9.5 28.0 78.0 41 0 0 0 0 0 0
Direct Labor $7,086.98 $815.32 $1,129.68 $3,297.05 $1,844.93 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 79.00% $5,598.71 $644.10 $892.45 $2,604.67 $1,457.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 36.00% $2,551.31 $293.52 $406.68 $1,186.94 $664.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 37.10% $2,629.27 $302.48 $419.11 $1,223.21 $684.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $17,866.27 $2,055.42 $2,847.92 $8,311.87 $4,651.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW T&D - Erwin $190.00 $190.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $190.00 $190.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $19.00 $19.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $209.00 $209.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $5,680.00 $0.00 $5,680.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $560.00 $110.00 $450.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $6,240.00 $110.00 $6,130.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW Drum $200.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Tubing, Poly/HDPE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Shallow GW Sampling Kit $870.00 $870.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Deep GW Sampling Kit $1,245.00 $1,245.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $2,435.00 $2,435.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $27,110.27 $2,055.42 $5,961.92 $14,441.87 $4,651.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee $1,786.63 $205.54 $284.79 $831.19 $465.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $28,896.90 $2,260.96 $6,246.71 $15,273.06 $5,116.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost from Prior CEF: $23,115.61 Manual Entry
Cost from Delta CEF; $5,781.26 Manual Entry
Cost (Prior + Delta): $28,896.87 Auto-Calculated
Rounding Error: $0.03 Auto-Calculated
Final Total Cost: $28,896.90 Auto-Calculated
&"CG Times,Bold"&16FDEP COST ESTIMATE
Formula Sheet
Project Management
Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10
Labor Costs $815.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$121.76 $1,095.84 $365.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$300.00 $300.00 $500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$633.42 $1,407.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $115.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $198.35 $793.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $105.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$74.50 $74.50 $186.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dollars $815.77 $1,129.68 $3,297.05 $1,844.93 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Project Management $6,271.66 = sum of Direct Labor Costs from Subtasks 2 through 10
$815.32 =13% of Direct Labor Costs (Project Management)
9.495 = Hours of Project Management (based on hourly salary of the Contractor Project Manager)
Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Service Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$19.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$19.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
ST 2
SITE : Saufley C&D Landfill ERIC_3967
SUBTASK 2: PFAS Samping
DATE: 6/10/24
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
PFAS Samping
Principal PG oversight/review of field staff and results 2
Senior Sci Field and sub coordination to sample up to 16 wells (3 hrs) prepare electronic delivery of results (3 hr) 6
Staff Sci Prep (2 hr), travel and sample up to 16 wells (16 hr) 18
Proejct Assisstant Sample tracking 2
TOTAL LABOR 28
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 3 $360.00 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel
Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals
Per Day $0.00
Total Equip.: $0.00
Services Procurement
Name Purpose Rate Units Usage Totals
NAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00
NAME OF COMPANY Drilling services (DPT, MAG wells, SBs, VPs) $0.00 Lump Sum 0 $0.00
IDW Drum Transportation and Disposal IDW $95.00 Per Drum 2 $190.00
$0.00 Lump Sum 0 $0.00
NAME OF COMPANY Utility Locate / GPR Survey $0.00 Lump Sum 0 $0.00
NAME OF COMPANY Utilities -Telemetry $0.00 Per Month 0 $0.00
Handling Fee $0.00 Per Month 0 $0.00
Total Services: $190.00
TOTAL $190.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 0 $0.00
VOC 8260 Aqueous $150.00 1.00 0 $0.00
TRPH FL PRO Soil $88.00 1.00 0 $0.00
SVOCs 8270 Soil/Sediment $260.00 1.00 0 $0.00
1 RCRA Metal (Pb) 6020 Soil/Sediment $14.00 1.00 0 $0.00
1 RCRA Metal (Hg) 7470 Soil/Sediment $28.00 1.00 0 $0.00
Herbicides 8151 Soil $155.00 1.00 0 $0.00
Organochlorine Pesticides / PCBs 8081/8082 Soil/Sediment $175.00 1.00 0 $0.00
Dioxins/Dibenzofurans 8290 Soil $950.00 1.00 0 $0.00 total Cyanide 335.4 Soil/Sediment $43.00 1.00 0 $0.00 total Phenols 420.2 Soil $35.00 1.00 0 $0.00
Priority Pollutant Organics Full Suite Aqueous $735.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 1 $110.00
Total Shipping: $110.00
TOTAL LAB $110.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
PPE Level D $35.00 Per Man Day 0 $0.00
PPE Level C $150.00 Per Man Day 0 $0.00
PPE Level B $230.00 Per Man Day 0 $0.00
Total PPE: $0.00
Expendables
Miscellaneous Expendables $40.00 Per Day 3 $120.00
Total Expendables: $120.00
Equipment Items
PID/FID Combo or FID $125.00 Per Day 0 $0.00
PID/FID Combo or FID $500.00 Per Week 0 $0.00
Thermal Anemometer $33.00 Per Day 0 $0.00
Vacuum Gauges (low, med & high) $19.00 Per Day 0 $0.00
Bailer, HDPE, Disp $7.00 Per Bailer 0 $0.00
Water Level: Electric Tape $25.00 Per Day 0 $0.00
Water Level: Electric Tape $100.00 Per Week 0 $0.00
Bladder Pump $134.00 Per Day 0 $0.00
Peristaltic Pump (w/bat) $30.00 Per Day 0 $0.00
Submersible Pump, 2" electric $80.00 Per Day 0 $0.00
Multimeter (pH, Temp, Cond, DO, Orp) $105.00 Per Day 0 $0.00
Turbidity Meter $27.00 Per Day 0 $0.00
Hand Auger $12.00 Per Day 0 $0.00
Terra Cores $11.00 Each 0 $0.00
Tedlar Bags $20.00 Each 0 $0.00
Survey Station transit/rod/level/tape $50.00 Per Day 0 $0.00
Portable Compressor $50.00 Per Day 0 $0.00
Portable Generator 5KW $70.00 Per Day 0 $0.00
Padlocks $3.40 Each 0 $0.00
Tubing, Poly/HDPE $0.30 Per Foot $0.00
Tubing, Silicon 3/16x3/8 $3.00 Per Foot 0 $0.00
Miscellaneous Expendables $40.00 Per Day 0 $0.00
PID (ppbRae) $110.00 Per Day 0 $0.00
55-gallon Drum $100.00 Each 2 $200.00
Regenerative Blower $180.00 Per Day 0 $0.00
ColorTec Sampling Pump $80.00 Per Week 0 $0.00
PCE ColorTec tubes (hi or low range) $90.00 Box of 10 0 $0.00
[add'l equipment] $0.00 [Unit] 0 $0.00
Total Equipment Items: $200.00
Equipment Kits
Site Reconnaissance Kit $150.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 0 $0.00
Hydrogeological Evaluation Kit $295.00 Day 0 $0.00
Shallow Groundwater Sampling Kit $290.00 Day 3 $870.00
Deep Groundwater Sampling Kit $415.00 Day 3 $1,245.00
Shallow Groundwater / Soil Vapor Screening Kit $290.00 Day 0 $0.00
Soil Assessment Kit $175.00 Day 0 $0.00
Soil Vapor Sampling Kit $290.00 Day 0 $0.00
Construction/O&M Supplies $75.00 Day 0 $0.00
Soil Sampling Kit (through concrete) $235.00 Day 0 $0.00
Construction/O&M/Pilot Test Kit $360.00 Day 0 $0.00
MAGS Investigation Kit $500.00 Day 0 $0.00
Total Equipment Kits: $2,115.00
TOTAL EQUIPMENT $2,435.00
ST 3
SITE : Saufley C&D Landfill ERIC_3967
SUBTASK 3: Annual GW Monitoring and Reporting
DATE: 6/10/24
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Annual Groundwater Monitoring Report - 2024
Principal PG oversight/review of field staff and results 2
Senior Sci Field coordination, sub management to sample up to 16 wells (4 hrs) prepare electronic delivery of results (2 hr) 6
Staff Sci Prep (2 hr), travel and sample up to 16 deep wells (32 hr), water levels for ~16 wells (6 hr) 40
Project Assisstant Sample tracking 2
Data Evaluation and Letter Report
Principal Scientist Technical review; sign and seal report 3
Principal Scientist Data evaluation and preparation of a brief letter report 13
Scientist Data evaluation 4
Drafter Figures preparation 5
Document Technician Editing; Letter report preparation 3
TOTAL LABOR 78
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel
Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals
$0.00 Per Day 1 $0.00
Total Equip.: $0.00
Services Procurement
Name Purpose Rate Units Usage Totals
NAME OF COMPANY Direct-push services $0.00 Lump Sum 1 $0.00
NAME OF COMPANY Drilling services (DPT, MAG wells, SBs, VPs) $0.00 Lump Sum 0 $0.00
IDW Drum Transportation and Disposal IDW $200.00 Per Drum 0 $0.00
EON PDB's $703.00 Lump Sum 0 $0.00
NAME OF COMPANY Utility Locate / GPR Survey $0.00 Lump Sum 0 $0.00
NAME OF COMPANY Utilities -Telemetry $0.00 Per Month 0 $0.00
Handling Fee $0.00 Per Month 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
Nitrogen, Ammonia (as N) - 7664-41-7 SM4500NH3C Aqueous $24.00 1.00 16 $384.00
Nitrate as N - 14797-55-8 E300 Aqueous $23.00 1.00 16 $368.00
Total dissolved solids - TDS SM2540C Aqueous $16.00 1.00 16 $256.00
Aluminum - 7429-90-5 SW6010C Aqueous $13.50 1.00 16 $216.00
Arsenic - 7440-38-2 SW6010C Aqueous $14.00 1.00 16 $224.00
Cadmium - 7440-43-9 SW6010C Aqueous $14.00 1.00 16 $224.00
Chromium - 7440-47-3 SW6010C Aqueous $14.00 1.00 16 $224.00
Iron - 7439-89-6 SW6010C Aqueous $13.50 1.00 16 $216.00
1,4-Dioxane - 123-91-1 8260 SIM Aqueous $150.00 1.00 16 $2,400.00
VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 16 $1,168.00
VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 0 $0.00
VOC 8260 Aqueous $150.00 1.00 0 $0.00
TRPH FL PRO Soil $88.00 1.00 0 $0.00
SVOCs 8270 Soil/Sediment $260.00 1.00 0 $0.00
1 RCRA Metal (Pb) 6020 Soil/Sediment $14.00 1.00 0 $0.00
1 RCRA Metal (Hg) 7470 Soil/Sediment $28.00 1.00 0 $0.00
Herbicides 8151 Soil $155.00 1.00 0 $0.00
Organochlorine Pesticides / PCBs 8081/8082 Soil/Sediment $175.00 1.00 0 $0.00
Dioxins/Dibenzofurans 8290 Soil $950.00 1.00 0 $0.00 total Cyanide 335.4 Soil/Sediment $43.00 1.00 0 $0.00 total Phenols 420.2 Soil $35.00 1.00 0 $0.00
Priority Pollutant Organics Full Suite Aqueous $735.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $5,680.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 3 $450.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $450.00
TOTAL LAB $6,130.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
PPE Level D $35.00 Per Man Day 0 $0.00
PPE Level C $150.00 Per Man Day 0 $0.00
PPE Level B $230.00 Per Man Day 0 $0.00
Total PPE: $0.00
Expendables
Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00
Equipment Items
PID/FID Combo or FID $125.00 Per Day 0 $0.00
PID/FID Combo or FID $500.00 Per Week 0 $0.00
Thermal Anemometer $33.00 Per Day 0 $0.00
Vacuum Gauges (low, med & high) $19.00 Per Day 0 $0.00
Bailer, HDPE, Disp $7.00 Per Bailer 0 $0.00
Water Level: Electric Tape $25.00 Per Day 0 $0.00
Water Level: Electric Tape $100.00 Per Week 0 $0.00
Bladder Pump $134.00 Per Day 0 $0.00
Peristaltic Pump (w/bat) $30.00 Per Day 0 $0.00
Submersible Pump, 2" electric $80.00 Per Day 0 $0.00
Multimeter (pH, Temp, Cond, DO, Orp) $105.00 Per Day 0 $0.00
Turbidity Meter $27.00 Per Day 0 $0.00
Hand Auger $12.00 Per Day 0 $0.00
Terra Cores $11.00 Each 0 $0.00
Tedlar Bags $20.00 Each 0 $0.00
Survey Station transit/rod/level/tape $50.00 Per Day 0 $0.00
Portable Compressor $50.00 Per Day 0 $0.00
Portable Generator 5KW $70.00 Per Day 0 $0.00
Padlocks $3.40 Each 0 $0.00
Tubing, Poly/HDPE $0.30 Per Foot $0.00
Tubing, Silicon 3/16x3/8 $3.00 Per Foot 0 $0.00
Miscellaneous Expendables $40.00 Per Day 0 $0.00
PID (ppbRae) $110.00 Per Day 0 $0.00
55-gallon Drum $100.00 Each 0 $0.00
Regenerative Blower $180.00 Per Day 0 $0.00
ColorTec Sampling Pump $80.00 Per Week 0 $0.00
PCE ColorTec tubes (hi or low range) $90.00 Box of 10 0 $0.00
[add'l equipment] $0.00 [Unit] 0 $0.00
Total Equipment Items: $0.00
Equipment Kits
Site Reconnaissance Kit $150.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 0 $0.00
Hydrogeological Evaluation Kit $295.00 Day 0 $0.00
Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00
Deep Groundwater Sampling Kit $415.00 Day 0 $0.00
Shallow Groundwater / Soil Vapor Screening Kit $290.00 Day 0 $0.00
Soil Assessment Kit $175.00 Day 0 $0.00
Soil Vapor Sampling Kit $290.00 Day 0 $0.00
Construction/O&M Supplies $75.00 Day 0 $0.00
Soil Sampling Kit (through concrete) $235.00 Day 0 $0.00
Construction/O&M/Pilot Test Kit $360.00 Day 0 $0.00
MAGS Investigation Kit $500.00 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
ST 4
SITE : Saufley C&D Landfill ERIC_3967
SUBTASK 4: Off'Site Notification
DATE: 6/10/24
LABOR CATEGORY
STAFF-TITLE WORK DESCRIPTION HOURS
Annual Groundwater Monitoring Report - 2024
Principal Project coordination/H&S/final review of offsite notice package 6
Senior Offsite notification package 10 sites (1.0 hrs per Site) 10
Project Assistant Offsite notification package 10 sites assembly 5
Draftsperson Offsite notification package 10 sites inventory/figure preparation/drafting 20
TOTAL LABOR 41
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel
Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals
$0.00 Per Day 1 $0.00
Total Equip.: $0.00
Services Procurement
Name Purpose Rate Units Usage Totals
NAME OF COMPANY Direct-push services $0.00 Lump Sum 1 $0.00
NAME OF COMPANY Drilling services (DPT, MAG wells, SBs, VPs) $0.00 Lump Sum 0 $0.00
IDW Drum Transportation and Disposal IDW $200.00 Per Drum 0 $0.00
EON PDB's $703.00 Lump Sum 0 $0.00
NAME OF COMPANY Utility Locate / GPR Survey $0.00 Lump Sum 0 $0.00
NAME OF COMPANY Utilities -Telemetry $0.00 Per Month 0 $0.00
Handling Fee $0.00 Per Month 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 0 $0.00
VOC 8260 Aqueous $150.00 1.00 0 $0.00
TRPH FL PRO Soil $88.00 1.00 0 $0.00
SVOCs 8270 Soil/Sediment $260.00 1.00 0 $0.00
1 RCRA Metal (Pb) 6020 Soil/Sediment $14.00 1.00 0 $0.00
1 RCRA Metal (Hg) 7470 Soil/Sediment $28.00 1.00 0 $0.00
Herbicides 8151 Soil $155.00 1.00 0 $0.00
Organochlorine Pesticides / PCBs 8081/8082 Soil/Sediment $175.00 1.00 0 $0.00
Dioxins/Dibenzofurans 8290 Soil $950.00 1.00 0 $0.00 total Cyanide 335.4 Soil/Sediment $43.00 1.00 0 $0.00 total Phenols 420.2 Soil $35.00 1.00 0 $0.00
Priority Pollutant Organics Full Suite Aqueous $735.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
PPE Level D $35.00 Per Man Day 0 $0.00
PPE Level C $150.00 Per Man Day 0 $0.00
PPE Level B $230.00 Per Man Day 0 $0.00
Total PPE: $0.00
Expendables
Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00
Equipment Items
PID/FID Combo or FID $125.00 Per Day 0 $0.00
PID/FID Combo or FID $500.00 Per Week 0 $0.00
Thermal Anemometer $33.00 Per Day 0 $0.00
Vacuum Gauges (low, med & high) $19.00 Per Day 0 $0.00
Bailer, HDPE, Disp $7.00 Per Bailer 0 $0.00
Water Level: Electric Tape $25.00 Per Day 0 $0.00
Water Level: Electric Tape $100.00 Per Week 0 $0.00
Bladder Pump $134.00 Per Day 0 $0.00
Peristaltic Pump (w/bat) $30.00 Per Day 0 $0.00
Submersible Pump, 2" electric $80.00 Per Day 0 $0.00
Multimeter (pH, Temp, Cond, DO, Orp) $105.00 Per Day 0 $0.00
Turbidity Meter $27.00 Per Day 0 $0.00
Hand Auger $12.00 Per Day 0 $0.00
Terra Cores $11.00 Each 0 $0.00
Tedlar Bags $20.00 Each 0 $0.00
Survey Station transit/rod/level/tape $50.00 Per Day 0 $0.00
Portable Compressor $50.00 Per Day 0 $0.00
Portable Generator 5KW $70.00 Per Day 0 $0.00
Padlocks $3.40 Each 0 $0.00
Tubing, Poly/HDPE $0.30 Per Foot $0.00
Tubing, Silicon 3/16x3/8 $3.00 Per Foot 0 $0.00
Miscellaneous Expendables $40.00 Per Day 0 $0.00
PID (ppbRae) $110.00 Per Day 0 $0.00
55-gallon Drum $100.00 Each 0 $0.00
Regenerative Blower $180.00 Per Day 0 $0.00
ColorTec Sampling Pump $80.00 Per Week 0 $0.00
PCE ColorTec tubes (hi or low range) $90.00 Box of 10 0 $0.00
[add'l equipment] $0.00 [Unit] 0 $0.00
Total Equipment Items: $0.00
Equipment Kits
Site Reconnaissance Kit $150.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 0 $0.00
Hydrogeological Evaluation Kit $295.00 Day 0 $0.00
Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00
Deep Groundwater Sampling Kit $415.00 Day 0 $0.00
Shallow…