This Task Assignment (TA) is a state and local contract indefinite delivery vehicle between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S., Inc. The document establishes specific work to be performed under the underlying Contract Number HW680, with Task Assignment Number SA177 effective through June 30, 2022. The contract involves site investigation activities at the Deerwood Subdivision located at US Highway 301, Starke, Bradford County, Florida (ERIC_6157). The Department Project Manager is Dennis Jensen/B. Stringer, and the Contractor's Project Manager is Gus Suarez, P.E.
Arcadis will conduct site investigation activities including a site reconnaissance visit, development of a Health & Safety Plan, and groundwater sampling. The scope of work comprises four subtasks: Project Management, Site Recon and Site Meeting, Desktop Review of Site Documents, and Semi-Annual Groundwater Monitoring Event. The total contract value is $29,147.65 on a fixed unit rate basis. Deliverables include a Field Notes Package and Project Management documentation due by June 1, 2022. The cost estimate reflects direct labor totaling $8,229.29, with overhead applied at 79.00%, General & Administrative costs at 36.00%, and fringe benefits at 37.10%. Additional costs include travel ($2,660.00), subcontractor services for IDW disposal through Clark Environmental ($297.00), laboratory services for sample shipping ($600.00), and field equipment and expendables ($2,770.00). Expenses for the final report will be covered under a future task assignment.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
SA177 Completion June 30, 2022
Arcadis will conduct site investigation activities at Deerwood Subdivision, as detailed in the attached revised April 14, 2022 Arcadis proposal. Activities to include a site reconnaissance visit, development of a Health & Safety Plan, and groundwater sampling.
Dennis Jensen/B. Stringer 850-245-8954 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-353-5778
ERIC_6157
US Highway 301, Starke, Bradford Co
Deerwood Subdivision
✔ $ 29,147.65
$ 29,147.65
Scope of Work
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2022.04.18 16:08:26 -04'00' David Phillips Digitally signed by David Phillips
Date: 2022.04.15 12:06:20 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Field Notes Package; Project Management - Subtasks 1-4 06/01/2022
Field Notes Package; Project Management - Subtasks 1-4 $ 29,147.65
$ 29,147.65
HW680
SA177
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Site # ERIC_6157
Deerwood Subdivision Site File
FROM: Dennis Jensen, Project Manager Brandie Stringer, Contract Manager
SUBJECT: Negotiation Summary
HW680 SA177
Site Investigation
DATE: April 15, 2022
Arcadis will conduct site investigation activities at Deerwood Subdivision, as detailed in the attached revised April 14, 2022 Arcadis proposal. Activities to include a site reconnaissance visit, development of a Health & Safety Plan, and groundwater sampling. Expenses for final report will be covered in a future task.
Clark Environmental will handle transportation and disposal of IDW.
Total task amount is $29,147.65. One revision to the Cost Estimate Form was required prior to tasking, resulting in the Department saving $720.00. Arcadis’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services.
FDEP COST ESTIMATE
Contractor: Arcadis, U.S., Inc.
Date: 4/14/2022
Task #: HW680 SA177 SubTask 1 Project Management SubTask 6
Site: Deerwood Subdivision SubTask 2 Site Recon and Site Meeting SubTask 7
Activity/Phase: Assessment SubTask 3 Desktop Review SubTask 8
Project Manager: Gus Suarez SubTask 4 Semi-Annual Monitoring Event SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$79.12 Project Manager Suarez, Gus (GS 12 12.0 $96.76 Principal Engineer Bedessem, Jim (J 0 0 0 0 0 0 0 0 0 0 $82.29 Principal Scientist Vogelsong, Willia 0 0 0 0 0 0 0 0 0 0 $81.24 Principal Engineer Burtnett, Susan (S 0 0 0 0 0 0 0 0 0 0 $79.12 Principal Engineer Suarez, Gus (GS 12 12 0 0 0 0 0 0 0 0 $75.11 Principal Scientist McManus, Andrew 0 0 0 0 0 0 0 0 0 0 $74.12 Principal Scientist McMillan, Britt (B 0 0 0 0 0 0 0 0 0 0 $71.24 Principal Engineer Navon, Daria (DN 0 0 0 0 0 0 0 0 0 0 $67.91 Principal Scientist Day, Chris (CD) 0 0 0 0 0 0 0 0 0 0 $61.69 Principal Scientist Burke, Brian (BRB 0 0 0 0 0 0 0 0 0 0 $61.38 Principal Scientist McGlone, Dougla 0 0 0 0 0 0 0 0 0 0 $61.32 Principal Scientist Dellay, Leah (LD) 0 0 0 0 0 0 0 0 0 0 $61.25 Principal Engineer Perella, John (JP 24 12 6 6 0 0 0 0 0 0 $50.00 Senior Engineer Cardoso, Antonio 0 0 0 0 0 0 0 0 0 0 $50.00 Senior Engineer Gattenby, Jessica 0 0 0 0 0 0 0 0 0 0 $50.00 Senior Scientist O'Sullivan, Mike ( 0 0 0 0 0 0 0 0 0 0 $48.57 Senior Scientist Larenas, Athnony 0 0 0 0 0 0 0 0 0 0 $45.61 Senior Scientist Jeffries, Shannon 0 0 0 0 0 0 0 0 0 0 $49.19 Senior Scientist O'Connell, Patrick 0 0 0 0 0 0 0 0 0 0 $47.03 Senior Scientist Gillespie, Julie (J 0 0 0 0 0 0 0 0 0 0 $47.03 Senior Engineer Cansler, Theresa 0 0 0 0 0 0 0 0 0 0 $45.81 Senior Engineer Hanna, Chad (CH 0 0 0 0 0 0 0 0 0 0 $43.40 Project Engineer Romero Cotrino, 0 0 0 0 0 0 0 0 0 0 $43.88 Project Engineer Hays, Timothy (T 0 0 0 0 0 0 0 0 0 0 $41.21 Staff Scientist Mott, Lyndi (LM) 0 0 0 0 0 0 0 0 0 0 $39.34 Staff Scientist Riley, Joel (JR) 0 0 0 0 0 0 0 0 0 0 $36.35 Staff Scientist Chest, Mark (MC 0 0 0 0 0 0 0 0 0 0 $37.33 Staff Engineer Vail, Zackary (ZT 18 0 10 8 0 0 0 0 0 0 $36.18 Staff Scientist Singer, Jennifer ( 0 0 0 0 0 0 0 0 0 0 $35.93 Survey Manager Schacht, Roland 0 0 0 0 0 0 0 0 0 0 $28.94 Scientist McBath, Brandon 0 0 0 0 0 0 0 0 0 0 $28.94 Scientist Brooks, Eric (EAB 0 0 0 0 0 0 0 0 0 0 $28.94 Scientist Salinas, Kendall ( 0 0 0 0 0 0 0 0 0 0 $28.94 Scientist Bishton, Dan (DB 0 0 0 0 0 0 0 0 0 0 $28.94 Scientist Cochran, Laura (L 0 0 0 0 0 0 0 0 0 0 $28.80 Scientist Guarino, Andrew 0 0 0 0 0 0 0 0 0 0 $28.94 Scientist Martineau, Dunca 0 0 0 0 0 0 0 0 0 0 $28.72 Scientist Brutscher, Kather 0 0 0 0 0 0 0 0 0 0 $24.77 Scientist Bridenstine, Tyler 0 0 0 0 0 0 0 0 0 0 $33.57 Technician Welch, David (DJ 70 10 0 60 0 0 0 0 0 0 $29.14 Technician Dankerl, David (D 60 0 0 60 0 0 0 0 0 0 $24.17 Technician Fortner, Kendrix ( 0 0 0 0 0 0 0 0 0 0 $23.52 Technician Rhodes, John (JA 0 0 0 0 0 0 0 0 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 0 0 0 0 0 0 0 0 0 0 $30.99 Drafter/Designer Richards, Jim (JR 0 0 0 0 0 0 0 0 0 0 $31.48 Drafter/Designer Berndgen, Wendy 0 0 0 0 0 0 0 0 0 0 $35.00 Document Technician Ballheim, Debra ( 0 0 0 0 0 0 0 0 0 0 $26.52 Document Technician Embras, Susan (S 0 0 0 0 0 0 0 0 0 0 $30.96 Project Assistant McLemore, Miche 3 0 0 3 0 0 0 0 0 0
Total Hours 199 12 34 16 137 0 0 0 0 0 0
Direct Labor $8,229.29 $946.73 $2,020.14 $740.80 $4,521.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 79.00% $6,501.14 $747.92 $1,595.91 $585.23 $3,572.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 36.00% $2,962.54 $340.82 $727.25 $266.69 $1,627.78 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.10% $3,053.07 $351.24 $749.47 $274.84 $1,677.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $20,746.04 $2,386.71 $5,092.77 $1,867.56 $11,399.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $800.00 $200.00 $0.00 $600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: 4/14/2022
Task #: HW680 SA177 SubTask 1 Project Management SubTask 6
Site: Deerwood Subdivision SubTask 2 Site Recon and Site Meeting SubTask 7
Activity/Phase: Assessment SubTask 3 Desktop Review SubTask 8
Project Manager: Gus Suarez SubTask 4 Semi-Annual Monitoring Event SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $1,860.00 $0.00 $0.00 $1,860.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $2,660.00 $200.00 $0.00 $2,460.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) - DrillPro $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 GPR - SiteLines $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Clark $270.00 $0.00 $0.00 $270.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 MOT Setup $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 AS trailer, compressor, generator $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $270.00 $0.00 $0.00 $270.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $27.00 $0.00 $0.00 $27.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $297.00 $0.00 $0.00 $297.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $600.00 $0.00 $0.00 $600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $600.00 $0.00 $0.00 $600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $200.00 $0.00 $0.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $2,570.00 $0.00 $0.00 $2,570.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $2,770.00 $0.00 $0.00 $2,770.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $27,073.04 $2,386.71 $5,292.77 $1,867.56 $17,526.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,074.61 $238.67 $509.28 $186.76 $1,139.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $29,147.65 $2,625.38 $5,802.05 $2,054.32 $18,665.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 2
SITE : Deerwood Subdivision Site Eric_6157 SUBTASK 2: Site Recon and Site Meeting
DATE: 44665
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title) Project Manager (GS) Site Visit (10), Transition Communications (2) 12
Principal (JP) Site Visit (10), Transition Communications (2) 12
Staff Sci (EB) 0
Technician (DW) Site Visit (10) 10
Project Asst / MMc 0
TOTAL LABOR 34
VEHICLE TYPE RATE UNIT USEAGE
Automobile 80 Per Day 1 80 $80.00
Van/Truck 120 Per Day 1 120 $120.00
TOTAL VEHICLE $200.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals
36 Per Day $0.00
36 Per Day $0.00
Hotel Category/Staff Rate Unit Usage Totals
150 Per Day $0.00
150 Per Day $0.00
Total Meal/ $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement Name Equipment Rate Units Usage Totals
0 Per Day 1 $0.00
Total Equip.: $0.00 Services Procurement Name Purpose Rate Units Usage Totals
Lump Sum $0.00 Lump Sum $0.00 Drum $0.00 Drum $0.00 Lump Sum $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs TAT 24-hr=110% (3-day=65% (11-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to --- --- 150 Per Cooler 0 $0.00
Shipping - Small (0 to 2 --- --- 110 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection Item Rate Unit Usage Totals
Total PPE: $0.00 Expendables Miscellaneous Expendables 40 Per Day 0
Total Expen $0.00 Equipment Items
Total Equip $0.00 Equipment Kits Site Reconnaissance Kit 150 Day 0 0 Monitor Well Installation Kit 325 Day 0 0
Total Equip $0.00
TOTAL EQUIPMENT $0.00
SUBTASK 3: Destop Review
DATE: 44665
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title) Principal (JP) Review of Documents 6
Staff Eng (ZV) Review of Documents 10
Technician (DW) Project Asst / MMc
TOTAL LABOR 16
VEHICLE TYPE RATE UNIT USEAGE
Automobile 80 Per Day 0 $0.00
Van/Truck 120 Per Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals
36 Per Day $0.00
36 Per Day $0.00
Hotel Category/Staff Rate Unit Usage Totals
150 Per Day $0.00
150 Per Day $0.00
Total Meal/ $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement Name Equipment Rate Units Usage Totals
0 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement Name Purpose Rate Units Usage Totals Clark IDW - Water 90 Drum 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous 73 1 $0.00
TRPH FL PRO Water 88 1 $0.00
PAHs 8270 Water 110 1 $0.00
Lead - unfiltered 6010 Water 13 1 $0.00
Lead - field filtered 6010 Water 13 1 $0.00
TAT 24-hr=110% (3-day=65% (11-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 5--- --- 150 Per Cooler $0.00
Shipping - Small (0 to 25--- --- 110 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection Item Rate Unit Usage Totals
Total PPE: $0.00 Expendables Miscellaneous Expendables 40 Per Day 0
Total Expen $0.00 Equipment Items Tubing, Poly/HDPE 0.3 Per Foot 0 Tubing, Silicon 3/16x3/8 3 Per Foot 0 55-gallon Drum 100 Each 0
0.45 micron field filters 21 Each 0
Total Equip $0.00 Equipment Kits Shallow Groundwater Sampling Kit 290 Day 0 Deep Groundwater Sampling Kit 415 Day 0
Total Equip $0.00
TOTAL EQUIPMENT $0.00
SUBTASK 4: Semi-Annual Monitoring Event
DATE: 44665
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title) Principal (JP) Field & FDEP Communications,owner communications, PE field support 6
Staff Eng (ZV) Prep (4), field support (4) 8
Technician (DW) Prep (3), Round Trip Travel (5), WLs and MW Sampling Event (50) demob, paperwork (2) 60
Technician (DD) Prep (3), Round Trip Travel (5), WLs and MW Sampling Event (50) demob, paperwork (2) 60
Project Asst / MMc Data tracking 3
TOTAL LABOR 137
VEHICLE TYPE RATE UNIT USEAGE
Automobile 80 Per Day 0 0 $0.00
Van/Truck 120 Per Day 5 600 $600.00
TOTAL VEHICLE $600.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals
DW 36 Per Day 5 $180.00
DD 36 Per Day 5 $180.00
Hotel Category/Staff Rate Unit Usage Totals
DW 150 Per Day 5 $750.00
DD 150 Per Day 5 $750.00
Total Meal/Hotel: $1,860.00
TOTAL PER DIEM $1,860.00
SUBCONTRACTOR COSTS
Equipment Procurement Name Equipment Rate Units Usage Totals
0 Per Day 1 $0.00
Total Equip.: $0.00 Services Procurement Name Purpose Rate Units Usage Totals Clark IDW - Water 90 Lump Sum 3 $270.00
Total Services: $270.00
TOTAL $270.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (3-day=65% (11-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to --- --- 150 Per Cooler 4 $600.00
Shipping - Small (0 to 2--- --- 110 Per cooler 0 $0.00
Total Shipping: $600.00
TOTAL LAB $600.00
EQUIPMENT
Personal Protection Item Rate Unit Usage Totals
Total PPE: $0.00 Expendables Miscellaneous Expendables 40 Per Day 5 200
Total Expendables: $200.00 Equipment Items
Total Equipment Items: $0.00 Equipment Kits Shallow Groundwater Sampling Kit 290 Day 6 1740 Deep Groundwater Sampling Kit 415 Day 2 830
Total Equipment Kits: $2,570.00
TOTAL EQUIPMENT $2,770.00
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
Arcadis U.S., Inc.
4300 W Cypress Street Suite 450 Tampa Florida 33607 Phone: 813 903 3100 Fax: 813 350 9046 www.arcadis.com
FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062
1/3
Mr. Dennis A. Jensen Site Investigation Section Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4515 Tallahassee, Florida 32399-2400
Date: April 14, 2022 Our Ref:
Subject: Proposal for Site Meeting, Desk Top Document Review, and Semi- Annual Groundwater Monitoring Activities Deerwood Subdivision Site 14281 US Highway 301 South Starke, Bradford County, FL
ERIC_6157 (56SL)
Dear Mr. Jensen, Arcadis U.S., Inc. (Arcadis) is pleased to submit the following proposal/cost estimate to complete site recon, including a site meeting with the former contractor (AECOM), a desktop review of site documents, and performance of a semi-annual groundwater monitoring event at the Deerwood Subdivision Site (Site). As discussed with the Florida Department of Environmental Protection (FDEP), preparation and submittal of a Semi- Annual Monitoring Report for the Site will be tasked separately.
This proposal includes the scope of work pursuant to recent communications with FDEP and estimated costs with a schedule for completion. The following tasks were developed and in accordance with Chapter 62-780 F.A.C.
and applicable standard operating procedures (SOP) (DEP-SOP-001/01).
SCOPE OF WORK
Task 1: Project Management
Project management includes technical support and general administrative and health and safety tasks related to the items below.
Task 2: Site Recon and Site Meeting
Arcadis will schedule a site meeting with the former contractor (AECOM) and FDEP. The purpose of the site visit shall be physically locating monitoring wells and obtaining a better understanding of Site and off-site conditions and potential health and safety concerns. Arcadis staff to perform the site visit shall include the project manager, engineer, and field technician.
In addition, Arcadis will conduct a conference call with AECOM to discuss Site history and current conditions.
Arcadis will request AECOM provide site files to Arcadis, including data base, CAD, survey, access agreements and any other relevant files not available through Oculus. Specifically important for the efficient development of the Semi-Annual Monitoring Report will be receipt of live file versions of excel and CAD drawings.
Florida Department of Environmental Protection April 14, 2022
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
2/3
Task 3: Desktop Review of Site Documents
A desktop review of site documents available in Oculus and soon to be submitted final AECOM Semi-Annual Monitoring Report will be performed to understand previous site activities and current site conditions. This review will be used in conjunction with the analysis of data collected during proposed groundwater monitoring event, to determine a conceptual path to closure for the Site, what potential data gaps exist, if additional site assessment (groundwater or soil) is required and if additional remediation may be warranted. These topics will be discussed in detail within the proposed Semi-Annual Monitoring Report.
Task 4: Semi-Annual Groundwater Monitoring Event
Prior to initiation of field work, Arcadis will prepare a Health and Safety Plan (HASP) to identify task-specific hazards, hazard controls, and monitoring and safety requirements for all phases of work anticipated.
As performed during the August 2019 monitoring event, groundwater elevations will be collected from 121 monitor wells utilizing a water level probe relative to each top of well casing. These data will be used to determine relative groundwater elevations and gradient conditions in the respective aquifer zones.
Following the completion of the groundwater elevation gauging, 61 Site monitor wells will be sampled using low-flow techniques and in accordance with the current version of DEP-SOP-001/01 FS2200. Samples will be submitted to the FDEP Central Lab for analysis. All samples will be analyzed for CVOCs per USEPA Method 8260B, five samples will be analyzed for 1,4-dioxane by 8260 SIM-ID and 24 samples will be analyzed for total organic carbon (TOC) by standard method SM 5310B. Monitor wells selected for 1,4-dioxane analysis are those with detections above 0.35 ug/L and monitor wells selected for TOC analysis had at least one CVOC compound above the FDEP GCTL during the August 2019 sampling event. A total of eight duplicate samples (6 – CVOC and 2 – TOC) will be collected for QA/QC analysis. This proposal assumes that three drums of non-hazardous purge water will be generated during implementation of Task 4. It is assumed that Arcadis can utilize the existing waste profile for the disposal of purge water.
Arcadis will provide FDEP with a brief field work summary memorandum (with field documentation and photos) approximately 10 days following completion of the sampling event.
Task 5: Reporting
Reporting will be tasked separately.
SCHEDULE
Arcadis will begin coordinating schedules immediately following receipt of a signed Task Assignment. The field work summary memorandum will be submitted to FDEP within 10 days of completion of field work.
Florida Department of Environmental Protection April 14, 2022
This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.
www.arcadis.com Deerwood Proposal - 04.14.22
3/3
COST ESTIMATE
Level of Effort (LOE) Forms and a Cost Estimate Form (CEF) that present estimated project costs are enclosed as Attachment 1.
CLOSING REMARKS
Arcadis appreciates the opportunity to assist the FDEP-SOLCP at this Site. If you have any questions or wish to discuss this proposal, please contact the undersigned.
Sincerely, Arcadis U.S., Inc.
Gus Suarez, P.E.
Project Manager
Email: gus.suarez@arcadis.com Direct Line: 813.353.5778 Mobile: 813.205.4703
CC. John F. Perella, P.E. (Arcadis Project Engineer)
Enclosures:
Attachment 1 - CEF-LOE