Atch 47-AF Form 103 - Outage Request.pdf
PDF 79 KB Posted
- Attached to
- Nellis AFB Paving IDIQ
- Solicitation number
- FA486125R0006
About this file
The document is an Air Force Form 103 (Base Civil Engineering Work Clearance Request), which is a standardized form used to coordinate and request clearance for work that may disrupt base operations, utilities, or traffic flow. The form requires detailed information about a proposed work project, including specific location, type of facility/work involved, proposed start and end dates, affected facilities, and potential impacts to base housing or infrastructure.
Key instructions specify that utility outages must be submitted at least 30 days in advance and the form is designed to coordinate work with base activities while minimizing customer inconvenience and identifying potential hazardous work conditions. The form includes sections for various base engineering departments to review and approve the proposed work, with specific areas to document utility distribution systems, environmental considerations, safety concerns, and required precautionary measures for work accomplishment.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE PREPAREDBASE CIVIL ENGINEERING WORK CLEARANCE REQUEST
(See Instructions on Reverse)
1. Clearance is requested to proceed with work at on Work Order No. , Contract No. , involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.
2. TYPE OF FACILITY/WORK INVOLVED
G. AIRCRAFT OR VEHICULAR TRAFFIC FLOWA. PAVEMENTS D. FIRE DETECTION & PROTECTION SYSTEMS
H. SECURITYB. DRAINAGE SYSTEMS E. UTILITY OVERHEAD UNDERGROUND
I. OTHERC. RAILROAD TRACKS F. COMM OVERHEAD UNDERGROUND
3. DATE CLEARANCE REQUIRED 4. DATE OF CLEARANCE
5. SIGNATURE OF REQUESTING OFFICIAL 6. TELEPHONE NO. 7. ORGANIZATION
ORGANIZATION REMARKS (Use Reverse for additional comments) REVIEWER'S NAME AND INITIALS
8.
A. ELECTRICAL DISTRIBUTION
B A
S B. STEAM DISTRIBUTION
E
C. WATER DISTRIBUTION
C I
D. POL DISTRIBUTIONV
I L
E. SEWER DISTRIBUTION
E N
F. ENVIRONMENTAL
G
I
G. PAVEMENTS/ GROUNDSN
E
E H. FIRE PROTECTION
R
I
I. ZONEN
G
J. OTHER (Specify)
9. SECURITY POLICE
10. SAFETY
11. COMMUNICATIONS
12. BASE OPERATIONS
13. CABLE TV
14. COMMERCIAL UTILITY COMPANY
TELEPHONE
GAS
ELECTRIC
15. OTHER (Specify)
16. REQUESTED CLEARANCE APPROVED DISAPPROVED
17. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 17a. DATE SIGNED
PREVIOUS EDITIONS ARE OBSOLETE.AF FORM 103, 19940801 (IMT-V1)
* UTILITY OUTAGES MUST BE SUBMITTED AT LEAST 30 DAYS IN ADVANCE.
1. What is the specific address and/or location where the work will be done?
2. Include a map with plain view reference points (building numbers, road names, ect...)?
3. Is this outage a road closure? If so provide detailed detour map.
4. Provide a detailed description of work:
4. What is the requested work directly in support of (facility repair, infrastructure repair, project construction)?
5. Requested outage START DATE & TIME?
Start Date: ________ Start Time: ________
End Date: ________ End Time: ________
6. What facility(s) will be affected by this outage?
7. Will Base Housing area be affected by this outage?
8. Who is the Project Manager or Point of Contact within CE?
9. Are there any reasons why work cannot be done after hours (>1700hrs) and/or over the weekend (Saturday & Sunday)?
Yes No If yes, explain: ______________________________________________________________
INSTRUCTIONS
The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.
18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)
AF FORM 103, 19940801 (IMT-V1) (REVERSE)
FOR ELECTRICAL OUTAGES, CONTACT ELECTRICAL SHOP (702-652-3114/8143) AND YOUR 99 CES PROJECT
MANAGER TO COORDINATE AND DISCUSS OUTAGE DETAILS BEFORE SUBMITTING AF FORM 103
| DATE PREPARED: |
| 1 Clearance is requested to proceed with work at: |
| on Work Order No: |
| Contract No: |
| has: Off |
| has not been staked or clearly marked: Off |
| 2 TYPE OF FACILITYWORK INVOLVED: |
| A PAVEMENTS: Off |
| D FIRE DETECTION PROTECTION SYSTEMS: Off |
| G AIRCRAFT OR VEHICULAR TRAFFIC FLOW: Off |
| B DRAINAGE SYSTEMS: Off |
| E UTILITY: Off |
| OVERHEAD: Off |
| UNDERGROUND: Off |
| H SECURITY: Off |
| C RAILROAD TRACKS: Off |
| F COMM: Off |
| OVERHEAD_2: Off |
| UNDERGROUND_2: Off |
| I OTHER: Off |
| 3 DATE CLEARANCE REQUIRED: |
| 4 DATE OF CLEARANCE: |
| 5 SIGNATURE OF REQUESTING OFFICIAL: |
| 6 TELEPHONE NO: |
| 7 ORGANIZATION: |
| TELEPHONE: Off |
| GAS: Off |
| ELECTRIC: |
| APPROVED: Off |
| DISAPPROVED: Off |
| 17 TYPED NAME AND SIGNATURE OF APPROVING OFFICER Chief of Operations Flight or Chief of Engineering Flight: |
| Start Date: |
| Start Time: |
| End Date: |
| End Time: |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Text30: |
| Text31: |
| Text32: |
| Text33: |
| Text34: |
File details come from the government source that posted it. Updated .