Atch 31-APPENDIX 29 AF 3064 Progress Schedule Template.xlsx

XLSX spreadsheet 502 KB Posted

Attached to
Nellis AFB Paving IDIQ
Solicitation number
FA486125R0006
Issued by

About this file

This file is an Air Force Form 3065 Contract Progress Report template spanning multiple weeks, designed for tracking contract progress across 48 weekly reporting periods. The template is a standardized Department of Defense form (OMB No. 0704-0188) intended for contractors to document project completion percentages, with spaces to record line-item work elements, total job percentages, and cumulative progress.

The template includes fields for reporting period details such as contract number, project number, completion date, and specific work element progress tracking. Each weekly report contains sections for scheduled versus actual progress, work element percentages completed this period and cumulatively, and a progress or completion certificate requiring contractor and contracting officer signatures. While the template is comprehensively structured, the specific example provided contains no actual data, showing only blank reporting fields with zero percentages across all weeks.

View the file

Other files

File Type Posted
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE.xlsx XLSX spreadsheet
Solicitation - FA486125R0006.pdf PDF
Atch 50-Past Performance Questionnaire.pdf PDF
Atch 49-Past Performance Information Sheet.pdf PDF
Atch 47-AF Form 103 - Outage Request.pdf PDF
Atch 46-Nellis Single Pass (2 Months Max).pdf PDF
Atch 45-99 SFS-Mass Pass Request.xlsx XLSX spreadsheet
Atch 40-APPENDIX 38 Nellis-Creech 2710 Communication Installation Standards.pdf PDF
Atch 39-APPENDIX 37 Typical Exterior Color Schedule.pdf PDF
Atch 38-APPENDIX 36 AF 3000 Material Approval Submittal.pdf PDF
Atch 37-APPENDIX 35 AF 66 Schedule of Material Submittals.xlsx XLSX spreadsheet
Atch 36-APPENDIX 34 NAFB Suitable Tree List.pdf PDF
Atch 33-APPENDIX 31 14_USAF Integrated Cultural Resources Mgmt Plan 32-7065 ICRMP (15 Nov 2019).pdf PDF
Atch 18-Appendix 16 Nellis Creech IFS.pdf PDF
Atch 14-APPENDIX 12 Crack Rpr Detail.pdf PDF
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE 09AUG24_Blank.xlsx XLSX spreadsheet
Atch 44-APPENDIX 42 Uniform Standard Specifications for Clark County.pdf PDF
Atch 42-APPENDIX 40 Uniform Design and Construction Standards (UDACS).pdf PDF
Atch 41-APPENDIX 39 Nellis-Creech IFS Electrical Req.pdf PDF
Atch 34-APPENDIX 32 Installation Plan 12 - Hazardous Waste Management Plan (27 Sep 23).pdf PDF
Atch 24-APPENDIX 22 NAFB 0-74 Range Pass.pdf PDF
Atch 23-APPENDIX 21 Nuclear Gauge Request Form 2.pdf PDF
Atch 19-APPENDIX 17 AF Form 103 - Dig Permit.pdf PDF
Atch 17-APPENDIX 15 ADA Warning Panel Detail.pdf PDF
Atch 15-APPENDIX 13 Field Molded Joint Seal Details.pdf PDF
Atch 12-APPENDIX 10 Full Depth Rpr Details.pdf PDF
Atch 10-APPENDIX 8 Sleeve Bollards Detail.pdf PDF
Atch 9-APPENDIX 7 Valley Gutter Detail.pdf PDF
Atch 7-APPENDIX 5 L Curb and Gutter Detail.pdf PDF
Atch 4-APPENDIX 2 Mooring Detail.pdf PDF
Atch 52-NV20250001 Building Heavy and Highway.pdf PDF
Atch 51-Sample Client Authorization Letter.pdf PDF
Atch 48-Sub or Teaming Partner Consent Form.pdf PDF
Atch 43-APPENDIX 41 Uniform Standard Drawings for Clark County.pdf PDF
Atch 35-APPENDIX 33 Desert Tortoise Temporary Fencing Guidelines.pdf PDF
Atch 30-APPENDIX 28 AF Form 3065 Progress Report Template.pdf PDF
Atch 29-APPENDIX 27 NTTR Visit Request.pdf PDF
Atch 28-APPENDIX 26 DOD Supplement to National Manual Uniform Traffic Control Devices.pdf PDF
Atch 27-APPENDIX 25 National Manual Uniform Traffic Control Devices 11th Edition.pdf PDF
Atch 26-APPENDIX 24 Work Clearance Triggers.pdf PDF
Atch 25-APPENDIX 23 Env Permit-ATP Guidance (2023).pdf PDF
Atch 20-APPENDIX 18 AF Form 103 - Outage Request.pdf PDF
Atch 3-APPENDIX 1 Utility Ducts Detail.pdf PDF
Atch 53-NV20250058 Highway.pdf PDF
Atch 32-APPENDIX 30 Plan 32-7086 Hazardous Material Management Plan June 2021.pdf PDF
Atch 22-APPENDIX 20 Nuclear Gauge Request Form 1.xlsx XLSX spreadsheet
Atch 21-APPENDIX 19 Schedule of Values Template.xlsx XLSX spreadsheet
Atch 16-APPENDIX 14 Compression Seal Detail.pdf PDF
Atch 13-APPENDIX 11 Rpr of Concrete (Fail Keyway).pdf PDF
Atch 11-APPENDIX 9 Partial Depth Rpr Details.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Info

1. CONTRACT NUMBER:
2. PROJECT NUMBER:
3. PROJECT TITLE:
4. STARTING DATE:
5. PROJECTED COMPLETION DATE:
6. PURCHASE REQUEST NO.
7. NTP DATE:
8. PERIOD OF PERFORMANCE:
9. CONTRACT COMPLETION DATE:
10. SUBMITTED BY:

Schedule1 # Work Elements 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99 31 Dec 99

0.00%

TOTALS 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

123456789101112
SCHEDULED0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
ACTUAL0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0CONTRACT NO.0
0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Schedule2

#Work Elements31 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 99
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
TOTALS0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
CARRIED OVER FROM SCHEDULE 10.00%
131415161718192021222324
SCHEDULED0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
ACTUAL0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0CONTRACT NO.0
0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Schedule3

#Work Elements31 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 99
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
TOTALS0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
CARRIED OVER FROM SCHEDULE 20.00%
252627282930313233343536
SCHEDULED0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
ACTUAL0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0CONTRACT NO.0
0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Schedule4

#Work Elements31 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 9931 Dec 99
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
00.00%
TOTALS0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
CARRIED OVER FROM SCHEDULE 30.00%
373839404142434445464748
SCHEDULED0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
ACTUAL0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%
0CONTRACT NO.0
0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Week1

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
1FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

CONTRACTOR

BASE CIVIL ENGINEER

Week2

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
2FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week3

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
3FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week4

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
4FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week5

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
5FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week6

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
6FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week7

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
7FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week8

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
8FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week9

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
9FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week10

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
10FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week11

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
11FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week12

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
12FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week13

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
13FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week14

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
14FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week15

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
15FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week16

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
16FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week17

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
17FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week18

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
18FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week19

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
19FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%
TOTAL0.00%0.00%0.00%
REMARKS:
SCHEDULED: 0.00%
ACTUAL: 0.00%
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR

TYPE OR PRINT NAME AND TITLE SIGNATURE DATE

REVIEWED BY OR FOR CONTRACTING OFFICER
TYPE OR PRINT NAME AND TITLESIGNATUREDATE

AF IMT 3065, 19960401, V1 PREVIOUS EDITION IS OBSOLETE.

BASE CIVIL ENGINEER

Week20

CONTRACT PROGRESS REPORTOMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations
and Reports (OMB No. 9000-0058), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of
law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a curently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO: SAF/AQCO, 1060 Air Force Pentagon, Washington DC 20330-1060
CONTRACTORADDRESS
0.00.0
0.00.0
0.00.0
REPORT NO.PERIOD COVEREDPROJECT NO.CONTRACT NO.COMPLETION DATE
20FROM:TO:0031-December-1899
31-Dec-189931-Dec-1899
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
0.00.00%0.00%
0.00.00%0.00%
0.00.00%0.00%

This is the start of the file's text. The full file is on GovTribe.