Atch 22-APPENDIX 20 Nuclear Gauge Request Form 1.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Nellis AFB Paving IDIQ
Solicitation number
FA486125R0006
Issued by

About this file

This document is an Authorization Form for Bringing Radioactive Materials (RAM) onto Nellis Air Force Base, Creech AFB, or the Nevada Test & Training Range (NTTR). The comprehensive form requires detailed documentation for contractors planning to use nuclear gauges, including submission of a complete package with specific requirements such as a request letter, contract copy, current NRC or state license, training certificates for authorized users, and leak test certificates. Contractors must complete all yellow-marked sections and submit the documentation at least 30 days prior to using nuclear density gauges, with the understanding that authorization may take up to 30 days to process and is valid for 3-6 months.

The form mandates strict safety protocols, including on-site logging of nuclear gauge usage, identification of Radiation Safety Officers, authorized users, and specific device details. Contractors must provide precise location maps, contact information, and agree to potential periodic assessments by the Installation Radiation Safety Officer to ensure compliance with radiation safety practices. The authorization letter does not guarantee base entry, and failure to submit a complete package will result in automatic denial of the request.

View the file

Other files

File Type Posted
Solicitation Amendment FA486125R00060001 SF 30.pdf PDF
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE.xlsx XLSX spreadsheet
Solicitation - FA486125R0006.pdf PDF
Atch 53-NV20250058 Highway.pdf PDF
Atch 32-APPENDIX 30 Plan 32-7086 Hazardous Material Management Plan June 2021.pdf PDF
Atch 21-APPENDIX 19 Schedule of Values Template.xlsx XLSX spreadsheet
Atch 16-APPENDIX 14 Compression Seal Detail.pdf PDF
Atch 13-APPENDIX 11 Rpr of Concrete (Fail Keyway).pdf PDF
Atch 11-APPENDIX 9 Partial Depth Rpr Details.pdf PDF
Atch 8-APPENDIX 6 Sidewalk Detail.pdf PDF
Atch 6-APPENDIX 4 A Curb Detail.pdf PDF
Atch 5-APPENDIX 3 Typical Wing Wall Inlet Detail.pdf PDF
Atch 1-NELLIS PAVING IDIQ SOW v3.2_12 Mar25.pdf PDF
Solicitation - FA486125R0006 (1).pdf PDF
Atch 44-APPENDIX 42 Uniform Standard Specifications for Clark County.pdf PDF
Atch 42-APPENDIX 40 Uniform Design and Construction Standards (UDACS).pdf PDF
Atch 41-APPENDIX 39 Nellis-Creech IFS Electrical Req.pdf PDF
Atch 34-APPENDIX 32 Installation Plan 12 - Hazardous Waste Management Plan (27 Sep 23).pdf PDF
Atch 31-APPENDIX 29 AF 3064 Progress Schedule Template.xlsx XLSX spreadsheet
Atch 24-APPENDIX 22 NAFB 0-74 Range Pass.pdf PDF
Atch 23-APPENDIX 21 Nuclear Gauge Request Form 2.pdf PDF
Atch 19-APPENDIX 17 AF Form 103 - Dig Permit.pdf PDF
Atch 17-APPENDIX 15 ADA Warning Panel Detail.pdf PDF
Atch 15-APPENDIX 13 Field Molded Joint Seal Details.pdf PDF
Atch 12-APPENDIX 10 Full Depth Rpr Details.pdf PDF
Atch 10-APPENDIX 8 Sleeve Bollards Detail.pdf PDF
Atch 9-APPENDIX 7 Valley Gutter Detail.pdf PDF
Atch 7-APPENDIX 5 L Curb and Gutter Detail.pdf PDF
Atch 4-APPENDIX 2 Mooring Detail.pdf PDF
Atch 50-Past Performance Questionnaire.pdf PDF
Atch 49-Past Performance Information Sheet.pdf PDF
Atch 47-AF Form 103 - Outage Request.pdf PDF
Atch 46-Nellis Single Pass (2 Months Max).pdf PDF
Atch 45-99 SFS-Mass Pass Request.xlsx XLSX spreadsheet
Atch 40-APPENDIX 38 Nellis-Creech 2710 Communication Installation Standards.pdf PDF
Atch 39-APPENDIX 37 Typical Exterior Color Schedule.pdf PDF
Atch 38-APPENDIX 36 AF 3000 Material Approval Submittal.pdf PDF
Atch 37-APPENDIX 35 AF 66 Schedule of Material Submittals.xlsx XLSX spreadsheet
Atch 36-APPENDIX 34 NAFB Suitable Tree List.pdf PDF
Atch 33-APPENDIX 31 14_USAF Integrated Cultural Resources Mgmt Plan 32-7065 ICRMP (15 Nov 2019).pdf PDF
Atch 18-Appendix 16 Nellis Creech IFS.pdf PDF
Atch 14-APPENDIX 12 Crack Rpr Detail.pdf PDF
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE 09AUG24_Blank.xlsx XLSX spreadsheet
Atch 52-NV20250001 Building Heavy and Highway.pdf PDF
Atch 51-Sample Client Authorization Letter.pdf PDF
Atch 48-Sub or Teaming Partner Consent Form.pdf PDF
Atch 43-APPENDIX 41 Uniform Standard Drawings for Clark County.pdf PDF
Atch 35-APPENDIX 33 Desert Tortoise Temporary Fencing Guidelines.pdf PDF
Atch 30-APPENDIX 28 AF Form 3065 Progress Report Template.pdf PDF
Atch 29-APPENDIX 27 NTTR Visit Request.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Authorization Form

Requesting Authorization to Bring Radioactive Materials (RAM) onto Nellis AFB, Creech AFB, or The Nevada Test & Training Range (NTTR)
Submit to: usaf.nellis.99-mdg.list.99-omrs-sgpb-all-personnel@mail.mil Phone: 702-653-3316
1What base you will be working on? Nellis/Creech/NTTR/?
Name of the Licensee (person or firm proposing to conduct the activities described below):
The final approval letter will be sent to: Attention to (Name & Cell #):
The Email address the approval letter will be sent to:
Full Physical Address/Phone # of Licensee:
Email address of the licensee:

Author: Author:

2ContractEnsure you submit a copy of the contract.
Contract Project #:
Project Name:
Projected Starting Date:
Projected Ending Date:
Type of scope of activities to be performed:
Project Location:

Author: Provide: the closest major cross street & Bld#(if any).

Map Link:

Author: Place a MAP Link (google/other) indicate where exactly the equipment will be used (with an arrow). Or place a map on the bottom of this sheet showing the exact location where the equipment will be used, major cross street needs to be shown. If there are more than one location, please ensure you paste more than one map under each others.

Author: Author:

3Radiation Safety Officer(RSO)
RSO on site Name and Cell #:
Alternate RSO Name /email/Cell #:
Safety Monitor Name/email/Cell #:
Onsite Project Mgr Name/email/Cell #:
4Is a copy of the following A or B attached with your request?Please make sure you submit this required document.
A) State of Nevada Dept Of Health Human Sevices health deivision, Bureau of Health care quality and compliance (Nevada License and Authorized Rad Material).(YES) _______ (NO)____________
B) NRC Approval (required only for NTTR/TTR operation) not required for Creech or Nellis.(YES) _______ (NO)____________
5Authorized Users
Author: Please make sure you submit all their certificates in the same order as in this sheetPlease make sure you submit all their certificates in the pdf file in the same order as in this sheet
a- Authorized User Name:
User's Certification date:
b-Authorized User Name:
User's Certification date:
c-Authorized User Name:
User's Certification date:
d-Authorized User Name:
User's Certification date:
e-Authorized User Name:
User's Certification date:
f-Authorized User Name:
User's Certification date:
g-Authorized User Name:
User's Certification date:
h-Authorized User Name:
User's Certification date:
6Authorization devicesPlease make sure you submit all the leak certificates in the pdf file in the same order as in this sheet. Certificates in this sheet should match the one in pdf.
a-Authorized Device Model #:
Authorized Device Manufacturer:
Authorized Device Serial #:
Swipe Test Date:
RAD Sources:
Activities:
b-Authorized Device Model #:
Authorized Device Manufacturer:
Authorized Device Serial #:
Swipe Test Date:
RAD Sources:
Activities:
c-Authorized Device Model #:
Authorized Device Manufacturer:
Authorized Device Serial #:
Swipe Test Date:
RAD Sources:
Activities:
d-Authorized Device Model #:
Authorized Device Manufacturer:
Authorized Device Serial #:
Swipe Test Date:
RAD Sources:
Activities:
e-Authorized Device Model #:
Authorized Device Manufacturer:
Authorized Device Serial #:
Swipe Test Date:
RAD Sources:
Activities:
f-Authorized Device Model #:
Authorized Device Manufacturer:
Authorized Device Serial #:
Swipe Test Date:
RAD Sources:
Activities:
7License
Company's RAM License #:
Name of the license under:
Expiration Date:
Please ensure you send the following documents in one pdf file in the same order 1-6 as follows:
1- A request letter from the company (what/where/when/who?)
2- Copy of this spread sheet.
3- Copy of the contract
4*- Copy of the current NRC or Agreement State License. (Working in NTTR ranges requires an approval from the Nuclear Regulatory Commission (NRC)- A signed form 241 is required. OR a copy of the license from an approved state only if your work area is only within Nellis/Creech)
5- Copy of training Certificates for all authorized users listed on this document. Training should be commensurate with the hazard material being used.
6- Copy of a current leak test certificate that meets the requirements of the RAM license.
7- Another copy of this sheet in Excel Format (* need to be sent separately*).
8- The contractor MUST use the "LOG sheet" (see next tab in this Excel Sheet). All yellow marking needs to be completed before emailing the log sheet. Please make sure you follow the proper procedure within the authorization letter that you will be receiving within 30 days or less from the date that this sheet is received. This 30 days may exceed if the required information is not completed.
9- Once you receive your authorization letter, make sure you carry it at all time while you are on base.
10 - Keep in mind your Authorization may take 30 days to be approved by Bioenvironmental Engineering
11- The authorization letter does not mean you have a clearence to enter USAF base
12- The above items along with this excel sheet must be submitted 30 days prior using nuclear density gauge on base.
12- Ensure all the yellow boxes are filled out accordingly. All information will be re-verified.
13- You will receive the approval for 3 or 6 months or up to the swipe sample date whichever is less, the approval can be extended.
Failure to submit a complete package containing the aforementioned documents will result in automatic denial of the request.
By signing this agreement you acknowledge the Installation RSO may conduct a periodic assessment of your work to ensure contractor personnel are complying with radiation safety practices to prevent exposures to USAF personnel and the general public, as well as, avoiding contamination of government property.
Name, Signature &Date:
Place your map here below (resize it to fit this frame)

Log

1- This log is required to be kept onsite at all-time PROJECT/Contract #:_______________________________________
2- Fill out #1-5 (and email this sheet no less than 24 hours before entering the installation). Make sure you place the Project # in the subject line windows. #1-4 can be empty if unknown, but then it will be filled out accordingly.Email: usaf.nellis.99-mdg.mbx.99-amds-bio-eng@mail.mil
3- Fill out # 6-9 before leaving the installation. No need to email it when completed. However, this sheet can be requested at any time by the Installation Radiation Safety Officer (IRSO).During Duty Hours: 702-653-3316

After Duty Hours: 702-289-3486

4- Name your file in the following format before emailing it to IRSO: Date-ProjName-ProjNumber with attention in the subject line: IRSO Project/contract#
Nellis AFB/Creech AFB/NTTR (Circle one) RAM UTILIZATION LOG
RAM Use Location:Company:Project:
Event123456789
Operator (Full Name)ModelSerial NumberCalibration DateProjected Date &Time Entering BaseActual Date & Time Entering BaseActual Date & Time Exiting BaseTime Source Removed from ShieldingTime Source Returned to Shielding
1|||
2|||
3|||
4|||
5|||
6|||
7|||
8|||
9|||
10|||
11|||
12|||
13|||
14|||
15|||
16|||
17|||
18|||
19|||
20|||
21|||
22|||
23|||
24|||
25|||
26|||
27|||
28|||
29|||
30|||

File details come from the government source that posted it. Updated .