Atch 21 APPENDIX 17 AF Form 103 Work Clearance Request Guidance.docx

Air Force Form DOCX document 34 KB Posted

Attached to
IDIQ Paving
Solicitation number
FA486122R0011
Issued by

View the file

Other versions and copies of AF Form 103

File Revision Posted Attached to
Attachment 3 AF Form 103 FA309925Q0006 Version 2.pdf Version 2 Tree Removal BPA
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf Aug 1, 1994 SABER IDIQ
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf Aug 1, 1994 SABER IDIQ
Attachment 3 AF Form 103.pdf Revision not stated Tree Trimming and Removal BPA
Appendix A - AF Form 103 - Work Clearance Request.pdf Revision not stated Right of Way Vegetation Clearing - Joint Base Charleston
Atch 19-APPENDIX 17 AF Form 103 - Dig Permit.pdf Revision not stated Nellis AFB Paving IDIQ
Atch 47-AF Form 103 - Outage Request.pdf Revision not stated Nellis AFB Paving IDIQ
Atch 20-APPENDIX 18 AF Form 103 - Outage Request.pdf Revision not stated Nellis AFB Paving IDIQ
08 FA489725B0008 AF Form 103 Work Clearance Request.pdf Revision not stated Repair Building 1330 Main Sewage Line
13 AF Form 103 Work Clearance Request.pdf Revision not stated Construct T-1A Static Display
ATT 10_AF Form 103.pdf Revision not stated Indefinite Delivery/Indefinite Quantity (IDIQ) Western-Range Operational Ordering Contract for Infrastructure Enhancement (WOOKIE) Multiple Award Construction Contract (MACC) at Vandenberg Space Force Base, California
SOW Attach 8 - AF Form 103.pdf Revision not stated Peterson SFB Bldg 3 Soil Erosion Repair
Attachment 24 AF FORM 103 Work Clearance.pdf Revision not stated Fiber Optic Cable Install - Qty 6
K. AF IMT 103 Base Civil Engineering Work Clearance Request.pdf Revision not stated Repair_Replace Liner, Wastewater Lagoon One
3ac. Appendix C - AF Form 103.pdf Revision not stated Tree Removal and Trimming at Yokota and GSUs, Japan
Attachment 6 - Blank AF Form 103 Dig Permit.pdf Revision not stated Laughlin AFB Tree Removal Blanket Purchase Agreement
14. AF Form 103 Base Civil Engineering Work Clearance Request (2 pages) - BLANK.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Atch 22 APPENDIX 17 AF Form 103 Work Clearance Request.pdf Revision not stated IDIQ Paving
Atch 34 AF Form 103 Base Civil Engineering Work Clearance Request.pdf Revision not stated IDIQ Paving
1C-03 AF Form 103 Base Civil Engineering Work Clearance Request.pdf Revision not stated Repair Overruns on Center Runway
Show all 20

Who attaches AF Form 103

Other files

File Type Posted
Atch 33 Temporary Fencing Guidelines for Desert Tortoise Projects (2022).pdf PDF
Atch 09 APPENDIX 5 L Curb and Gutter Detail.pdf PDF
Atch 31 Progress Report Template_AF3065.pdf PDF
Atch 42 Past Performance Information Sheet.pdf PDF
Atch 08 APPENDIX 4 A Curb Detail.pdf PDF
Atch 06 APPENDIX 2 Mooring Detail.pdf PDF
Atch 40 (DBIDS) Installation Pass Request_Creech Template.pdf PDF
Atch 11 APPENDIX 7 Valley Gutter Detail.pdf PDF
Atch 13 APPENDIX 9 Partial Depth Rpr Details.pdf PDF
Atch 29 NTTR Visit Request.pdf PDF
Atch 00-Paving IDIQ List of Attachments.pdf PDF
Atch 25 APPENDIX 19 T10_1-Bollards Fixed- Type 2.pdf PDF
Atch 18 APPENDIX 14 Compression Seal Detail.pdf PDF
Atch 35 Request for Authorization for Radioactive Materials.pdf PDF
Atch 28 APPENDIX 22 DOD Supplement to National Manual Uniform Traffic Control Devices.pdf PDF
Atch 07 APPENDIX 3 Typical Wing Wall Inlet Detail.pdf PDF
Atch 26 APPENDIX 20 Environmental Permit Guidance Mar 2022.pdf PDF
Atch 22 APPENDIX 17 AF Form 103 Work Clearance Request.pdf PDF
Atch 34 AF Form 103 Base Civil Engineering Work Clearance Request.pdf PDF
Atch 44- Sample Client Authorization Letter.pdf PDF
Atch 39 Nellis Single Pass 1 Year Request Template.docx DOCX document
Atch 12 APPENDIX 8 Sleeve Bollards Detail.pdf PDF
Atch 20 Appendix 16 Nellis_Creech_IFS_Final.pdf PDF
Atch 36 Wage Determination Number Number NV1.pdf PDF
Atch 38 99 SFS - Mass Pass Request Template.xlsx XLSX spreadsheet
Atch 16 APPENDIX 12 Crack Rpr Detail.pdf PDF
Atch 15 APPENDIX 11 Rpr of Concrete (Fail Keyway).pdf PDF
Atch 37 Wage Determination Number NV24.pdf PDF
Atch 27 APPENDIX 21 National_Manual_Uniform Traffic Control Devices.pdf PDF
Atch 43 Past Performance Questionnaire.pdf PDF
Solicitation - FA486122R0011.pdf PDF
Atch 19 APPENDIX 15 ADA Warning Panel Detail.pdf PDF
Atch 23 APPENDIX 18 Nuclear Gauge Form 1.xlsx XLSX spreadsheet
Atch 30 Progress Schedule.xlsx XLSX spreadsheet
Atch 02 Paving IDIQ Bid Schedule.xlsx XLSX spreadsheet
Atch 41 Subcontractor or Teaming Partner Consent Form.pdf PDF
Atch 17 APPENDIX 13 Field Molded Joint Seal Details.pdf PDF
Atch 14 APPENDIX 10 Full Depth Rpr Details.pdf PDF
Atch 01 Paving SOW.pdf PDF
Atch 32 Plan 32-7086 Hazardous Material Management Plan.pdf PDF
Atch 05 APPENDIX 1 Utility Ducts Detail.pdf PDF
Atch 24 APPENDIX 18 Nuclear Gauge Request Form 2.pdf PDF
Atch 10 APPENDIX 6 Sidewalk Detail.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please make sure to mention that the area in the map for the dig permit is covered by the dust permit and SWPPP (if applicable) Additional acreage will require additional permits.

Please include all environmental permit, Cultural resources, and Natural resources survey requirements with AF Form 103 dig permit submittals. (Dust permit, SWPPP, BSDW Water Line Connection, Cultural Survey results and SHPO Consultation Letter, Natural Resources Survey Reports) ENVIRONMENTAL AF Form 103 (DIG PERMIT) Requirements Guidance for CEN Projects

CONTRACTOR MUST SUBMIT ALL THE INFORMATION MENTIONED HERE WITH THE AF FORM 103

TO AVOID ANY DELAYS IN APPROVAL FROM ENVIRONMENTAL

Does your project involve:

- Trenching 100 linear ft or more? – Dust permit required (Including hydro-excavation). Time to obtain is at least 2 weeks.

- Disturbing unpaved soil .25 acre or more? – Dust permit required

- Disturbing unpaved soil 1 acre or more? Requires Storm water pollution prevention plan from NDEP (takes 1 week). Make sure to fill out all the SWPPP form questions as much as possible to avoid re-submittal.

- Demolishing 1000sqft or more? (This will require internal NEPA coordination and multiple permits– may take up to 12 months)

- Expanding a parking lot? (This will require internal NEPA coordination and multiple permits – may take up to 12 months)

- Tapping into main water line? Bureau of Safe Drinking Water (BSDW) Permit required. May take up to 90 days.

- Please make sure to follow up with cultural resources program managers about SHPO consultation from the beginning of your project. This process is the lengthiest of all, and may delay your project.

- Natural Resources Surveys for Desert Tortoise, Migratory Birds, Burrowing Owl, Tree Removal require at least 2 weeks’ notice.
Environmental Program Managers contact details can be found in Attachment 11.