Atch 19-APPENDIX 17 AF Form 103 - Dig Permit.pdf

PDF 30 KB Posted

Attached to
Nellis AFB Paving IDIQ
Solicitation number
FA486125R0006
Issued by

About this file

The file appears to be a PDF document displaying a default Adobe Reader loading screen with instructions for upgrading Adobe Reader and trademark information. It does not contain substantive content related to the federal contract opportunity for Nellis AFB Paving IDIQ. To access the actual document contents, the PDF viewer may need to be updated or the file may require additional processing.

View the file

Other files

File Type Posted
Solicitation Amendment FA486125R00060001 SF 30.pdf PDF
Solicitation - FA486125R0006.pdf PDF
Atch 44-APPENDIX 42 Uniform Standard Specifications for Clark County.pdf PDF
Atch 42-APPENDIX 40 Uniform Design and Construction Standards (UDACS).pdf PDF
Atch 41-APPENDIX 39 Nellis-Creech IFS Electrical Req.pdf PDF
Atch 34-APPENDIX 32 Installation Plan 12 - Hazardous Waste Management Plan (27 Sep 23).pdf PDF
Atch 31-APPENDIX 29 AF 3064 Progress Schedule Template.xlsx XLSX spreadsheet
Atch 24-APPENDIX 22 NAFB 0-74 Range Pass.pdf PDF
Atch 23-APPENDIX 21 Nuclear Gauge Request Form 2.pdf PDF
Atch 17-APPENDIX 15 ADA Warning Panel Detail.pdf PDF
Atch 15-APPENDIX 13 Field Molded Joint Seal Details.pdf PDF
Atch 12-APPENDIX 10 Full Depth Rpr Details.pdf PDF
Atch 10-APPENDIX 8 Sleeve Bollards Detail.pdf PDF
Atch 9-APPENDIX 7 Valley Gutter Detail.pdf PDF
Atch 7-APPENDIX 5 L Curb and Gutter Detail.pdf PDF
Atch 4-APPENDIX 2 Mooring Detail.pdf PDF
Atch 53-NV20250058 Highway.pdf PDF
Atch 32-APPENDIX 30 Plan 32-7086 Hazardous Material Management Plan June 2021.pdf PDF
Atch 22-APPENDIX 20 Nuclear Gauge Request Form 1.xlsx XLSX spreadsheet
Atch 21-APPENDIX 19 Schedule of Values Template.xlsx XLSX spreadsheet
Atch 16-APPENDIX 14 Compression Seal Detail.pdf PDF
Atch 13-APPENDIX 11 Rpr of Concrete (Fail Keyway).pdf PDF
Atch 11-APPENDIX 9 Partial Depth Rpr Details.pdf PDF
Atch 8-APPENDIX 6 Sidewalk Detail.pdf PDF
Atch 6-APPENDIX 4 A Curb Detail.pdf PDF
Atch 5-APPENDIX 3 Typical Wing Wall Inlet Detail.pdf PDF
Atch 1-NELLIS PAVING IDIQ SOW v3.2_12 Mar25.pdf PDF
Solicitation - FA486125R0006 (1).pdf PDF
Atch 52-NV20250001 Building Heavy and Highway.pdf PDF
Atch 51-Sample Client Authorization Letter.pdf PDF
Atch 48-Sub or Teaming Partner Consent Form.pdf PDF
Atch 43-APPENDIX 41 Uniform Standard Drawings for Clark County.pdf PDF
Atch 35-APPENDIX 33 Desert Tortoise Temporary Fencing Guidelines.pdf PDF
Atch 30-APPENDIX 28 AF Form 3065 Progress Report Template.pdf PDF
Atch 29-APPENDIX 27 NTTR Visit Request.pdf PDF
Atch 28-APPENDIX 26 DOD Supplement to National Manual Uniform Traffic Control Devices.pdf PDF
Atch 27-APPENDIX 25 National Manual Uniform Traffic Control Devices 11th Edition.pdf PDF
Atch 26-APPENDIX 24 Work Clearance Triggers.pdf PDF
Atch 25-APPENDIX 23 Env Permit-ATP Guidance (2023).pdf PDF
Atch 20-APPENDIX 18 AF Form 103 - Outage Request.pdf PDF
Atch 3-APPENDIX 1 Utility Ducts Detail.pdf PDF
Atch 50-Past Performance Questionnaire.pdf PDF
Atch 49-Past Performance Information Sheet.pdf PDF
Atch 47-AF Form 103 - Outage Request.pdf PDF
Atch 46-Nellis Single Pass (2 Months Max).pdf PDF
Atch 45-99 SFS-Mass Pass Request.xlsx XLSX spreadsheet
Atch 40-APPENDIX 38 Nellis-Creech 2710 Communication Installation Standards.pdf PDF
Atch 39-APPENDIX 37 Typical Exterior Color Schedule.pdf PDF
Atch 38-APPENDIX 36 AF 3000 Material Approval Submittal.pdf PDF
Atch 37-APPENDIX 35 AF 66 Schedule of Material Submittals.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

DATE PREPARED

BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST

(See Instructions on Reverse)

1. Clearance is requested to proceed with work at on Work Order No.

, Contract No.

, involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.

2. TYPE OF FACILITY/WORK INVOLVED

G. AIRCRAFT OR VEHICULAR TRAFFIC FLOW

A. PAVEMENTS

D. FIRE DETECTION & PROTECTION SYSTEMS

H. SECURITY

B. DRAINAGE SYSTEMS

E. UTILITY

OVERHEAD

UNDERGROUND

I. OTHER

C. RAILROAD TRACKS

F. COMM

OVERHEAD

UNDERGROUND

4. DATE OF CLEARANCE

3. DATE CLEARANCE REQUIRED

5. SIGNATURE OF REQUESTING OFFICIAL

6. TELEPHONE NO.

7. ORGANIZATION

REMARKS

(Use Reverse for additional comments)

REVIEWER'S NAME AND INITIALS

ORGANIZATION

8.

A. ELECTRICAL DISTRIBUTION

B A S

B. STEAM DISTRIBUTION

E

C. WATER DISTRIBUTION

C I

D. POL DISTRIBUTION

V I L

E. SEWER DISTRIBUTION

E N

F. ENVIRONMENTAL

G I

G. PAVEMENTS/ GROUNDS

N E E

H. FIRE PROTECTION

R I

I. ZONE

N G J. OTHER (Specify)

9. SECURITY POLICE

10. SAFETY

11. COMMUNICATIONS

12. BASE OPERATIONS

13. CABLE TV

14. COMMERCIAL UTILITY COMPANY

TELEPHONE

GAS

ELECTRIC

15. OTHER (Specify)

APPROVED

DISAPPROVED

16. REQUESTED CLEARANCE

17. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 17a. DATE SIGNED

PREVIOUS EDITIONS ARE OBSOLETE.

AF IMT 103, 19940801, V3

Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign

INSTRUCTIONS

The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.

18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)

AF IMT 103, 19940801, V3

(REVERSE)

8.2.1.3158.1.475346.466429

HAS: 0
HASNOT: 0
APPRVD: 0
DAPPRVD: 0
Entery date as YYYYMMDD.:
LOCA:
WONO:
CTRNO:
ABC: 0
ABC_2: 0
ABC_3: 0
D: 0
E: 0
F: 0
OVHA: 0
OVHB: 0
UNDGA: 0
UNDGB: 0
GHI: 0
GHI_2: 0
GHI_3: 0
OTH:
Enter date as YYYYMMDD.:
ReqOffclSig:
TELE:
ORGN:
REMKA:
SIGNATURE1:
REMKA_2:
SIGNATURE2:
REMKA_3:
SIGNATURE3:
REMKA_4:
SIGNATURE4:
REMKA_5:
SIGNATURE5:
REMKA_6:
SIGNATURE6:
REMKA_7:
SIGNATURE7:
REMKA_8:
SIGNATURE8:
ZONE:
REMKB:
SIGNATURE9:
OTHB: Natural Gas
REMKC:
SIGNATURE10:
REMKD:
SIGNATURE11:
REMKD_2:
SIGNATURE12:
REMKD_3: Comm help desk 2-2666
SIGNATURE13:
REMKD_4:
SIGNATURE14:
REMKD_5:
OTHC: CLEARANCE IS VALID FOR 90 DAYS FROM APPROVAL DATE. EXPIRES ON:
REMKE: FILL OUT USA NORTH TICKET FORM AND CALL

811. USA NORTH REQUIRES TWO FULL WORKING

DAYS NOTICE BEFORE YOU DIG. USA NORTH

TICKET #

COMUTIL: 1
COMUTIL_2: 1
COMUTIL_3: 1
AppOffcrSig:
SIGNATURE16:
SIGNATUREfor13:
EF_1:
EF_2:
REMKSF:

*** REQUESTOR IS RESPONSIBLE FOR MAINTAINING MARKINGS ***

*DIG REQUEST NEEDS TO BE SUBMITTED 30 DAYS IN ADVANCE.*

1. WHAT IS THE PURPOSE OF THE DIGGING?

2. IF THIS WORK IS BEING COMPLETED BY CONTRACT PROVIDE NAME OF NAFB POINT OF CONTACT

3. INCLUDE MAP WITH DIMENSIONS AND A PLAIN VIEW REFERENCE POINTS. This map needs to include access roads, storage of equipment, and stockpiles and be consistent with the dimensions provided in question 5.

4 WHAT IS THE SPECIFIC ADDRESS AND LOCATION OF AREA BEING DUG? If more than one location, provide addresses of all the locations.

5. WHAT IS THE TOTAL AREA IN ACRES THAT IS GOING TO BE DISTURBED? Please include access roads, storage of equipment, and stockpiles in the total. _________

If above 0.25 acres, did you include a copy of your dust permit? Yes or No If above 1 acre, did you include your SWPPP? Yes or No

6. WHAT IS THE SPECIFIC LOCATION OF DIGGING STARTING POINT?

7. WHAT IS THE SPECIFIC LOCATION OF DIGGING ENDING POINT?

8. IF TRENCHING, PROVIDE THE FOLLOWING?

LINEAR FEET: ____________ DEPTH: ____________ WIDTH: ____________

If trenching is over 100 ft, did you include a copy of your dust permit? Yes or No

9. WHAT IS THE PROJECTED DATE DIGGING WILL START/END DATES?

START DATE: ____________ END DATE: ____________

10. WILL THIS DIGGING PERMIT REQUIRE A UTILITY OUTAGE ( ELECT, GAS, WATER)?

11. WILL YOU BE RESTRICTING OR CLOSING ROADS/PARKING LOTS TO FACILITATE THE WORK?

IF UNSURE ON HOW TO PROCESS THIS APPLICATION, PLEASE CONTACT AIR QUALITY AT (702) 652-2882.

*Please note any changes to your project need to be reevaluated for the appropriate permits through a new dig application.

**A copy of the Dust Permit must be submitted to Nellis.Air.Quality@us.af.mil once approved by the Clark County. 01Nov23