Atch 19-APPENDIX 17 AF Form 103 - Dig Permit.pdf
PDF 30 KB Posted
- Attached to
- Nellis AFB Paving IDIQ
- Solicitation number
- FA486125R0006
About this file
The file appears to be a PDF document displaying a default Adobe Reader loading screen with instructions for upgrading Adobe Reader and trademark information. It does not contain substantive content related to the federal contract opportunity for Nellis AFB Paving IDIQ. To access the actual document contents, the PDF viewer may need to be updated or the file may require additional processing.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
DATE PREPARED
BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST
(See Instructions on Reverse)
1. Clearance is requested to proceed with work at on Work Order No.
, Contract No.
, involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.
2. TYPE OF FACILITY/WORK INVOLVED
G. AIRCRAFT OR VEHICULAR TRAFFIC FLOW
A. PAVEMENTS
D. FIRE DETECTION & PROTECTION SYSTEMS
H. SECURITY
B. DRAINAGE SYSTEMS
E. UTILITY
OVERHEAD
UNDERGROUND
I. OTHER
C. RAILROAD TRACKS
F. COMM
OVERHEAD
UNDERGROUND
4. DATE OF CLEARANCE
3. DATE CLEARANCE REQUIRED
5. SIGNATURE OF REQUESTING OFFICIAL
6. TELEPHONE NO.
7. ORGANIZATION
REMARKS
(Use Reverse for additional comments)
REVIEWER'S NAME AND INITIALS
ORGANIZATION
8.
A. ELECTRICAL DISTRIBUTION
B A S
B. STEAM DISTRIBUTION
E
C. WATER DISTRIBUTION
C I
D. POL DISTRIBUTION
V I L
E. SEWER DISTRIBUTION
E N
F. ENVIRONMENTAL
G I
G. PAVEMENTS/ GROUNDS
N E E
H. FIRE PROTECTION
R I
I. ZONE
N G J. OTHER (Specify)
9. SECURITY POLICE
10. SAFETY
11. COMMUNICATIONS
12. BASE OPERATIONS
13. CABLE TV
14. COMMERCIAL UTILITY COMPANY
TELEPHONE
GAS
ELECTRIC
15. OTHER (Specify)
APPROVED
DISAPPROVED
16. REQUESTED CLEARANCE
17. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 17a. DATE SIGNED
PREVIOUS EDITIONS ARE OBSOLETE.
AF IMT 103, 19940801, V3
Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign
INSTRUCTIONS
The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.
18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)
AF IMT 103, 19940801, V3
(REVERSE)
8.2.1.3158.1.475346.466429
| HAS: 0 |
| HASNOT: 0 |
| APPRVD: 0 |
| DAPPRVD: 0 |
| Entery date as YYYYMMDD.: |
| LOCA: |
| WONO: |
| CTRNO: |
| ABC: 0 |
| ABC_2: 0 |
| ABC_3: 0 |
| D: 0 |
| E: 0 |
| F: 0 |
| OVHA: 0 |
| OVHB: 0 |
| UNDGA: 0 |
| UNDGB: 0 |
| GHI: 0 |
| GHI_2: 0 |
| GHI_3: 0 |
| OTH: |
| Enter date as YYYYMMDD.: |
| ReqOffclSig: |
| TELE: |
| ORGN: |
| REMKA: |
| SIGNATURE1: |
| REMKA_2: |
| SIGNATURE2: |
| REMKA_3: |
| SIGNATURE3: |
| REMKA_4: |
| SIGNATURE4: |
| REMKA_5: |
| SIGNATURE5: |
| REMKA_6: |
| SIGNATURE6: |
| REMKA_7: |
| SIGNATURE7: |
| REMKA_8: |
| SIGNATURE8: |
| ZONE: |
| REMKB: |
| SIGNATURE9: |
| OTHB: Natural Gas |
| REMKC: |
| SIGNATURE10: |
| REMKD: |
| SIGNATURE11: |
| REMKD_2: |
| SIGNATURE12: |
| REMKD_3: Comm help desk 2-2666 |
| SIGNATURE13: |
| REMKD_4: |
| SIGNATURE14: |
| REMKD_5: |
| OTHC: CLEARANCE IS VALID FOR 90 DAYS FROM APPROVAL DATE. EXPIRES ON: |
| REMKE: FILL OUT USA NORTH TICKET FORM AND CALL |
811. USA NORTH REQUIRES TWO FULL WORKING
DAYS NOTICE BEFORE YOU DIG. USA NORTH
TICKET #
| COMUTIL: 1 |
| COMUTIL_2: 1 |
| COMUTIL_3: 1 |
| AppOffcrSig: |
| SIGNATURE16: |
| SIGNATUREfor13: |
| EF_1: |
| EF_2: |
| REMKSF: |
*** REQUESTOR IS RESPONSIBLE FOR MAINTAINING MARKINGS ***
*DIG REQUEST NEEDS TO BE SUBMITTED 30 DAYS IN ADVANCE.*
1. WHAT IS THE PURPOSE OF THE DIGGING?
2. IF THIS WORK IS BEING COMPLETED BY CONTRACT PROVIDE NAME OF NAFB POINT OF CONTACT
3. INCLUDE MAP WITH DIMENSIONS AND A PLAIN VIEW REFERENCE POINTS. This map needs to include access roads, storage of equipment, and stockpiles and be consistent with the dimensions provided in question 5.
4 WHAT IS THE SPECIFIC ADDRESS AND LOCATION OF AREA BEING DUG? If more than one location, provide addresses of all the locations.
5. WHAT IS THE TOTAL AREA IN ACRES THAT IS GOING TO BE DISTURBED? Please include access roads, storage of equipment, and stockpiles in the total. _________
If above 0.25 acres, did you include a copy of your dust permit? Yes or No If above 1 acre, did you include your SWPPP? Yes or No
6. WHAT IS THE SPECIFIC LOCATION OF DIGGING STARTING POINT?
7. WHAT IS THE SPECIFIC LOCATION OF DIGGING ENDING POINT?
8. IF TRENCHING, PROVIDE THE FOLLOWING?
LINEAR FEET: ____________ DEPTH: ____________ WIDTH: ____________
If trenching is over 100 ft, did you include a copy of your dust permit? Yes or No
9. WHAT IS THE PROJECTED DATE DIGGING WILL START/END DATES?
START DATE: ____________ END DATE: ____________
10. WILL THIS DIGGING PERMIT REQUIRE A UTILITY OUTAGE ( ELECT, GAS, WATER)?
11. WILL YOU BE RESTRICTING OR CLOSING ROADS/PARKING LOTS TO FACILITATE THE WORK?
IF UNSURE ON HOW TO PROCESS THIS APPLICATION, PLEASE CONTACT AIR QUALITY AT (702) 652-2882.
*Please note any changes to your project need to be reevaluated for the appropriate permits through a new dig application.
**A copy of the Dust Permit must be submitted to Nellis.Air.Quality@us.af.mil once approved by the Clark County. 01Nov23
| SignatureStyle1: |
| SignatureStyle2: |
File details come from the government source that posted it. Updated .