13 AF Form 103 Work Clearance Request.pdf

PDF 30 KB Posted

Attached to
Construct T-1A Static Display Federal contract opportunity
Solicitation number
FA309925R0002
Issued by
Department of the Air Force Air Education and Training Command

About this file

The document appears to be a placeholder PDF with instructions for troubleshooting Adobe Reader, containing no substantive contract information. The page displays technical guidance about potentially unloadable PDF files and provides links to download Adobe Reader for various operating systems. No federal contract details are present in this specific file.

View the file

Other files for this federal contract opportunity

Other files attached to Construct T-1A Static Display, newest first.
File Type Posted
15 Financial Institution Reference Sheet.pdf PDF
Solicitation Amendment FA309925R00020003 SF 30.pdf PDF
01 MXDP 24-1015 Construct T-1A Static Display - Draft Statement of Work v2.pdf PDF
Solicitation Amendment FA309925R00020002 SF 30.pdf PDF
Solicitation Amendment_FA309925R00020001 SF 30.pdf PDF
14 Requests for Information.pdf PDF
11 Updated Past Performance Questionnaire.pdf PDF
Solicitation_FA309925R0002.pdf PDF
01 MXDP 24-1015 Construct T-1A Static Display - Draft Statement of Work.pdf PDF
04 C. Environmental Quality Construction Specifications Laughlin AFB May 2024.pdf PDF
05 D. Laughlin Legacy Sustainable Landscape Plan 2011.pdf PDF
10 Notification of Compliance with Contracting Insurance Requirements.pdf PDF
08 G. Progress Schedule Form and Contract Progress Report.xlsx XLSX spreadsheet
11 Past Performance Questionnaire.pdf PDF
12 AF Form 3000.pdf PDF
02 A. MXDP 24-1015 Construct T-1A Static Display Conceptual Layout.pdf PDF
03 B. Laughlin AFB Division 01 General Specifications.pdf PDF
06 E. Laughlin Installation Facility Standards.pdf PDF
07 F. Schedule of Material Submittals.xlsx XLSX spreadsheet
09 Wage Determination_TX20250090_03Jan25.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

DATE PREPARED

BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST

(See Instructions on Reverse)

1. Clearance is requested to proceed with work at on Work Order No.

, Contract No.

, involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.

2. TYPE OF FACILITY/WORK INVOLVED

G. AIRCRAFT OR VEHICULAR TRAFFIC FLOW

A. PAVEMENTS

D. FIRE DETECTION & PROTECTION SYSTEMS

H. SECURITY

B. DRAINAGE SYSTEMS

E. UTILITY

OVERHEAD

UNDERGROUND

I. OTHER

C. RAILROAD TRACKS

F. COMM

OVERHEAD

UNDERGROUND

4. DATE OF CLEARANCE

3. DATE CLEARANCE REQUIRED

5. SIGNATURE OF REQUESTING OFFICIAL

6. TELEPHONE NO.

7. ORGANIZATION

REMARKS

(Use Reverse for additional comments)

REVIEWER'S NAME AND INITIALS

ORGANIZATION

8.

A. ELECTRICAL DISTRIBUTION

B A S

B. STEAM DISTRIBUTION

E

C. WATER DISTRIBUTION

C I

D. POL DISTRIBUTION

V I L

E. SEWER DISTRIBUTION

E N

F. ENVIRONMENTAL

G I

G. PAVEMENTS/ GROUNDS

N E E

H. FIRE PROTECTION

R I

I. ZONE

N G J. OTHER (Specify)

9. SECURITY POLICE

10. SAFETY

11. COMMUNICATIONS

12. BASE OPERATIONS

13. CABLE TV

14. COMMERCIAL UTILITY COMPANY

TELEPHONE

GAS

ELECTRIC

15. OTHER (Specify)

APPROVED

DISAPPROVED

16. REQUESTED CLEARANCE

17. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 17a. DATE SIGNED

PREVIOUS EDITIONS ARE OBSOLETE.

AF IMT 103, 19940801, V3

Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign

INSTRUCTIONS

The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.

18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)

AF IMT 103, 19940801, V3

(REVERSE)

8.2.1.3158.1.475346.466429

HAS: 0
HASNOT: 0
APPRVD: 0
DAPPRVD: 0
Entery date as YYYYMMDD.:
LOCA:
WONO:
CTRNO:
ABC: 0
ABC_2: 0
ABC_3: 0
D: 0
E: 0
F: 0
OVHA: 0
OVHB: 0
UNDGA: 0
UNDGB: 0
GHI: 0
GHI_2: 0
GHI_3: 0
OTH:
Enter date as YYYYMMDD.:
ReqOffclSig:
TELE:
ORGN:
REMKA:
SIGNATURE1:
REMKA_2:
SIGNATURE2:
REMKA_3:
SIGNATURE3:
REMKA_4:
SIGNATURE4:
REMKA_5:
SIGNATURE5:
REMKA_6:
SIGNATURE6:
REMKA_7:
SIGNATURE7:
REMKA_8:
SIGNATURE8:
ZONE:
REMKB:
SIGNATURE9:
OTHB:
REMKC:
SIGNATURE10:
REMKD:
SIGNATURE11:
REMKD_2:
SIGNATURE12:
REMKD_3:
SIGNATURE13:
REMKD_4:
SIGNATURE14:
REMKD_5:
OTHC:
REMKE:
COMUTIL: 0
COMUTIL_2: 0
COMUTIL_3: 0
AppOffcrSig:
SIGNATURE16:
SIGNATUREfor13:
EF_1:
EF_2:
REMKSF: Disclaimer: Clearance requests are not valid until signed by the approving officer and assigned a permit number. The approving officer will not sign the request until all utilities are marked, and all utility agency signatures are on the clearance request. Once completed and approved, the original work clearance request, with any applicable attachments, will be maintained on the job site by the requester during excavation and construction.

47 CES is only liable to maintain markings 30 days after AF103 approval. After 30 days of flags being placed, the Contractor shall be responsible to maintain markings. The Government is not liable for any lines hit within 5 feet of marking (flag or paint).

Grounds shall be kept with a professional appearance and ensure grass height matches surrounding areas. Pick up rocks, debris, and litter prior to mowing. Remove or mulch visible grass clippings before leaving work area. Contractor shall return site to the government in the same conditions as it was before work began.

If Contractor hits a water line, the contractor shall contact CE Customer Service, (830) 298-5488, and Bio Environmental Engineering, (830) 298-6859, with the location of the break and details. If the contractor is responsible for the repair they must ensure a certified water works operator is on site to disinfect, sample, and flush the water per the American Water Works Association requirements. The Contractor shall provide documentation of certification to the Government before commencing work. If necessary, a boil water notice will be submitted to Bio-Environmental Engineering for distribution to the required Laughlin AFB population. The Contractor shall provide a copy of all sample results to the Government. Reference 30 TAC 290.46

Job specific procedures by contractor:

Duration of work:

Dimensions of Dig (Depth and Length/Width/Radius, if applicable):

Location(s)(Nearest Building, Intersections, and Google GPS):

Type of Equipment being used:

Purpose of Dig:

SignatureStyle1:
SignatureStyle2:

File details come from the government source that posted it. Updated .