Atch 37-APPENDIX 35 AF 66 Schedule of Material Submittals.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Nellis AFB Paving IDIQ
Solicitation number
FA486125R0006
Issued by

About this file

The document is a Schedule of Material Submittals template for a federal contract related to the Nellis AFB Paving IDIQ (Indefinite-Delivery Indefinite-Quantity) project. The template is designed for tracking material submissions throughout the construction/repair paving project, with designated columns for line items, submittal types, required copies, submission dates, review dates, approvals, and remarks.

The template includes multiple categories of potential submittals such as shop drawings, samples, color selections, manufacturer's recommendations, warranties, catalog data, operating instructions, technical data, test reports, and field reports. It is specifically associated with Solicitation Number FA486125R0006 for the 99th Contracting Squadron, covering paving projects at Nellis Air Force Base and southern portions of the Nevada Test and Training Range. The contract will be executed through individual task orders under the IDIQ framework, managed by the Department of the Air Force Air Combat Command.

View the file

Other files

File Type Posted
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE.xlsx XLSX spreadsheet
Solicitation - FA486125R0006.pdf PDF
Atch 52-NV20250001 Building Heavy and Highway.pdf PDF
Atch 51-Sample Client Authorization Letter.pdf PDF
Atch 48-Sub or Teaming Partner Consent Form.pdf PDF
Atch 43-APPENDIX 41 Uniform Standard Drawings for Clark County.pdf PDF
Atch 35-APPENDIX 33 Desert Tortoise Temporary Fencing Guidelines.pdf PDF
Atch 30-APPENDIX 28 AF Form 3065 Progress Report Template.pdf PDF
Atch 29-APPENDIX 27 NTTR Visit Request.pdf PDF
Atch 28-APPENDIX 26 DOD Supplement to National Manual Uniform Traffic Control Devices.pdf PDF
Atch 27-APPENDIX 25 National Manual Uniform Traffic Control Devices 11th Edition.pdf PDF
Atch 26-APPENDIX 24 Work Clearance Triggers.pdf PDF
Atch 25-APPENDIX 23 Env Permit-ATP Guidance (2023).pdf PDF
Atch 20-APPENDIX 18 AF Form 103 - Outage Request.pdf PDF
Atch 3-APPENDIX 1 Utility Ducts Detail.pdf PDF
Atch 44-APPENDIX 42 Uniform Standard Specifications for Clark County.pdf PDF
Atch 42-APPENDIX 40 Uniform Design and Construction Standards (UDACS).pdf PDF
Atch 41-APPENDIX 39 Nellis-Creech IFS Electrical Req.pdf PDF
Atch 34-APPENDIX 32 Installation Plan 12 - Hazardous Waste Management Plan (27 Sep 23).pdf PDF
Atch 31-APPENDIX 29 AF 3064 Progress Schedule Template.xlsx XLSX spreadsheet
Atch 24-APPENDIX 22 NAFB 0-74 Range Pass.pdf PDF
Atch 23-APPENDIX 21 Nuclear Gauge Request Form 2.pdf PDF
Atch 19-APPENDIX 17 AF Form 103 - Dig Permit.pdf PDF
Atch 17-APPENDIX 15 ADA Warning Panel Detail.pdf PDF
Atch 15-APPENDIX 13 Field Molded Joint Seal Details.pdf PDF
Atch 12-APPENDIX 10 Full Depth Rpr Details.pdf PDF
Atch 10-APPENDIX 8 Sleeve Bollards Detail.pdf PDF
Atch 9-APPENDIX 7 Valley Gutter Detail.pdf PDF
Atch 7-APPENDIX 5 L Curb and Gutter Detail.pdf PDF
Atch 4-APPENDIX 2 Mooring Detail.pdf PDF
Atch 50-Past Performance Questionnaire.pdf PDF
Atch 49-Past Performance Information Sheet.pdf PDF
Atch 47-AF Form 103 - Outage Request.pdf PDF
Atch 46-Nellis Single Pass (2 Months Max).pdf PDF
Atch 45-99 SFS-Mass Pass Request.xlsx XLSX spreadsheet
Atch 40-APPENDIX 38 Nellis-Creech 2710 Communication Installation Standards.pdf PDF
Atch 39-APPENDIX 37 Typical Exterior Color Schedule.pdf PDF
Atch 38-APPENDIX 36 AF 3000 Material Approval Submittal.pdf PDF
Atch 36-APPENDIX 34 NAFB Suitable Tree List.pdf PDF
Atch 33-APPENDIX 31 14_USAF Integrated Cultural Resources Mgmt Plan 32-7065 ICRMP (15 Nov 2019).pdf PDF
Atch 18-Appendix 16 Nellis Creech IFS.pdf PDF
Atch 14-APPENDIX 12 Crack Rpr Detail.pdf PDF
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE 09AUG24_Blank.xlsx XLSX spreadsheet
Atch 53-NV20250058 Highway.pdf PDF
Atch 32-APPENDIX 30 Plan 32-7086 Hazardous Material Management Plan June 2021.pdf PDF
Atch 22-APPENDIX 20 Nuclear Gauge Request Form 1.xlsx XLSX spreadsheet
Atch 21-APPENDIX 19 Schedule of Values Template.xlsx XLSX spreadsheet
Atch 16-APPENDIX 14 Compression Seal Detail.pdf PDF
Atch 13-APPENDIX 11 Rpr of Concrete (Fail Keyway).pdf PDF
Atch 11-APPENDIX 9 Partial Depth Rpr Details.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:

(To be completed by Project Engineer or Contractor)(To be completed by Contract Administrator)
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNUMBER OF COPIES REQUIREDREQUIRED SUBMISSION DATE

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the date received from the Contractor. (MM/DD/YY)

DATE T CIVIL ENGINEERING

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the date the submittal is due back from CE

(MM/DD/YY) SUBMITTAL NUMBERS

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter Resubmittal Number

FINAL APPROVAL

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter any comments pertaining to the submittal

CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTS
APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the submittal final approval date

(MM/DD/YY)

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter any comments pertaining to the submittal

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)