Atch 37-APPENDIX 35 AF 66 Schedule of Material Submittals.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- Nellis AFB Paving IDIQ
- Solicitation number
- FA486125R0006
About this file
The document is a Schedule of Material Submittals template for a federal contract related to the Nellis AFB Paving IDIQ (Indefinite-Delivery Indefinite-Quantity) project. The template is designed for tracking material submissions throughout the construction/repair paving project, with designated columns for line items, submittal types, required copies, submission dates, review dates, approvals, and remarks.
The template includes multiple categories of potential submittals such as shop drawings, samples, color selections, manufacturer's recommendations, warranties, catalog data, operating instructions, technical data, test reports, and field reports. It is specifically associated with Solicitation Number FA486125R0006 for the 99th Contracting Squadron, covering paving projects at Nellis Air Force Base and southern portions of the Nevada Test and Training Range. The contract will be executed through individual task orders under the IDIQ framework, managed by the Department of the Air Force Air Combat Command.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
| (To be completed by Project Engineer or Contractor) | (To be completed by Contract Administrator) | |||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | NUMBER OF COPIES REQUIRED | REQUIRED SUBMISSION DATE |
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the date received from the Contractor. (MM/DD/YY)
DATE T CIVIL ENGINEERING
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the date the submittal is due back from CE
(MM/DD/YY) SUBMITTAL NUMBERS
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter Resubmittal Number
FINAL APPROVAL
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter any comments pertaining to the submittal
| CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | |
| APPROVED |
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the submittal final approval date
(MM/DD/YY)
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter any comments pertaining to the submittal
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| 12 |
| 13 |
| 14 |
| 15 |
| 16 |
| 17 |
| 18 |
| 19 |
| 20 |
| 21 |
| 22 |
| 23 |
| 24 |
| Schedule of Material Submittals Template, Feb 05 (SAF/AQCP) |
File details come from the government source that posted it. Updated .