Atch 22 APPENDIX 17 AF Form 103 Work Clearance Request.pdf

Air Force Form PDF 28 KB Posted

Attached to
IDIQ Paving
Solicitation number
FA486122R0011
Issued by

View the file

Other versions and copies of AF Form 103

File Revision Posted Attached to
Attachment 3 AF Form 103 FA309925Q0006 Version 2.pdf Version 2 Tree Removal BPA
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf Aug 1, 1994 SABER IDIQ
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf Aug 1, 1994 SABER IDIQ
Attachment 3 AF Form 103.pdf Revision not stated Tree Trimming and Removal BPA
Appendix A - AF Form 103 - Work Clearance Request.pdf Revision not stated Right of Way Vegetation Clearing - Joint Base Charleston
Atch 19-APPENDIX 17 AF Form 103 - Dig Permit.pdf Revision not stated Nellis AFB Paving IDIQ
Atch 47-AF Form 103 - Outage Request.pdf Revision not stated Nellis AFB Paving IDIQ
Atch 20-APPENDIX 18 AF Form 103 - Outage Request.pdf Revision not stated Nellis AFB Paving IDIQ
08 FA489725B0008 AF Form 103 Work Clearance Request.pdf Revision not stated Repair Building 1330 Main Sewage Line
13 AF Form 103 Work Clearance Request.pdf Revision not stated Construct T-1A Static Display
ATT 10_AF Form 103.pdf Same revision and size as this file Revision not stated Indefinite Delivery/Indefinite Quantity (IDIQ) Western-Range Operational Ordering Contract for Infrastructure Enhancement (WOOKIE) Multiple Award Construction Contract (MACC) at Vandenberg Space Force Base, California
SOW Attach 8 - AF Form 103.pdf Revision not stated Peterson SFB Bldg 3 Soil Erosion Repair
Attachment 24 AF FORM 103 Work Clearance.pdf Revision not stated Fiber Optic Cable Install - Qty 6
K. AF IMT 103 Base Civil Engineering Work Clearance Request.pdf Revision not stated Repair_Replace Liner, Wastewater Lagoon One
3ac. Appendix C - AF Form 103.pdf Same revision and size as this file Revision not stated Tree Removal and Trimming at Yokota and GSUs, Japan
Attachment 6 - Blank AF Form 103 Dig Permit.pdf Revision not stated Laughlin AFB Tree Removal Blanket Purchase Agreement
14. AF Form 103 Base Civil Engineering Work Clearance Request (2 pages) - BLANK.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Atch 34 AF Form 103 Base Civil Engineering Work Clearance Request.pdf Same revision and size as this file Revision not stated IDIQ Paving
Atch 21 APPENDIX 17 AF Form 103 Work Clearance Request Guidance.docx Revision not stated IDIQ Paving
1C-03 AF Form 103 Base Civil Engineering Work Clearance Request.pdf Same revision and size as this file Revision not stated Repair Overruns on Center Runway
Show all 20

Who attaches AF Form 103

Other files

File Type Posted
Atch 33 Temporary Fencing Guidelines for Desert Tortoise Projects (2022).pdf PDF
Atch 09 APPENDIX 5 L Curb and Gutter Detail.pdf PDF
Atch 31 Progress Report Template_AF3065.pdf PDF
Atch 42 Past Performance Information Sheet.pdf PDF
Atch 08 APPENDIX 4 A Curb Detail.pdf PDF
Atch 06 APPENDIX 2 Mooring Detail.pdf PDF
Atch 40 (DBIDS) Installation Pass Request_Creech Template.pdf PDF
Atch 11 APPENDIX 7 Valley Gutter Detail.pdf PDF
Atch 13 APPENDIX 9 Partial Depth Rpr Details.pdf PDF
Atch 29 NTTR Visit Request.pdf PDF
Atch 00-Paving IDIQ List of Attachments.pdf PDF
Atch 25 APPENDIX 19 T10_1-Bollards Fixed- Type 2.pdf PDF
Atch 18 APPENDIX 14 Compression Seal Detail.pdf PDF
Atch 35 Request for Authorization for Radioactive Materials.pdf PDF
Atch 28 APPENDIX 22 DOD Supplement to National Manual Uniform Traffic Control Devices.pdf PDF
Atch 07 APPENDIX 3 Typical Wing Wall Inlet Detail.pdf PDF
Atch 26 APPENDIX 20 Environmental Permit Guidance Mar 2022.pdf PDF
Atch 34 AF Form 103 Base Civil Engineering Work Clearance Request.pdf PDF
Atch 44- Sample Client Authorization Letter.pdf PDF
Atch 39 Nellis Single Pass 1 Year Request Template.docx DOCX document
Atch 12 APPENDIX 8 Sleeve Bollards Detail.pdf PDF
Atch 20 Appendix 16 Nellis_Creech_IFS_Final.pdf PDF
Atch 36 Wage Determination Number Number NV1.pdf PDF
Atch 21 APPENDIX 17 AF Form 103 Work Clearance Request Guidance.docx DOCX document
Atch 38 99 SFS - Mass Pass Request Template.xlsx XLSX spreadsheet
Atch 16 APPENDIX 12 Crack Rpr Detail.pdf PDF
Atch 15 APPENDIX 11 Rpr of Concrete (Fail Keyway).pdf PDF
Atch 37 Wage Determination Number NV24.pdf PDF
Atch 27 APPENDIX 21 National_Manual_Uniform Traffic Control Devices.pdf PDF
Atch 43 Past Performance Questionnaire.pdf PDF
Solicitation - FA486122R0011.pdf PDF
Atch 19 APPENDIX 15 ADA Warning Panel Detail.pdf PDF
Atch 23 APPENDIX 18 Nuclear Gauge Form 1.xlsx XLSX spreadsheet
Atch 30 Progress Schedule.xlsx XLSX spreadsheet
Atch 02 Paving IDIQ Bid Schedule.xlsx XLSX spreadsheet
Atch 41 Subcontractor or Teaming Partner Consent Form.pdf PDF
Atch 17 APPENDIX 13 Field Molded Joint Seal Details.pdf PDF
Atch 14 APPENDIX 10 Full Depth Rpr Details.pdf PDF
Atch 01 Paving SOW.pdf PDF
Atch 32 Plan 32-7086 Hazardous Material Management Plan.pdf PDF
Atch 05 APPENDIX 1 Utility Ducts Detail.pdf PDF
Atch 24 APPENDIX 18 Nuclear Gauge Request Form 2.pdf PDF
Atch 10 APPENDIX 6 Sidewalk Detail.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The document you are trying to load requires Adobe Reader 8 or higher. You may not have the Adobe Reader installed or your viewing environment may not be properly configured to use Adobe Reader.

For information on how to install Adobe Reader and configure your viewing environment please see http://www.adobe.com/go/pdf_forms_configure.

DATE PREPARED

BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST

(See Instructions on Reverse)

1. Clearance is requested to proceed with work at on Work Order No.

, Contract No.

, involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.

2. TYPE OF FACILITY/WORK INVOLVED

G. AIRCRAFT OR VEHICULAR TRAFFIC FLOW

A. PAVEMENTS

D. FIRE DETECTION & PROTECTION SYSTEMS

H. SECURITY

B. DRAINAGE SYSTEMS

E. UTILITY

OVERHEAD

UNDERGROUND

I. OTHER

C. RAILROAD TRACKS

F. COMM

OVERHEAD

UNDERGROUND

4. DATE OF CLEARANCE

3. DATE CLEARANCE REQUIRED

5. SIGNATURE OF REQUESTING OFFICIAL

6. TELEPHONE NO.

7. ORGANIZATION

REMARKS

(Use Reverse for additional comments)

REVIEWER'S NAME AND INITIALS

ORGANIZATION

8.

A. ELECTRICAL DISTRIBUTION

B A S

B. STEAM DISTRIBUTION

E

C. WATER DISTRIBUTION

C I

D. POL DISTRIBUTION

V I L

E. SEWER DISTRIBUTION

E N

F. ENVIRONMENTAL

G I

G. PAVEMENTS/ GROUNDS

N E E

H. FIRE PROTECTION

R I

I. ZONE

N G J. OTHER (Specify)

9. SECURITY POLICE

10. SAFETY

11. COMMUNICATIONS

12. BASE OPERATIONS

13. CABLE TV

14. COMMERCIAL UTILITY COMPANY

TELEPHONE

GAS

ELECTRIC

15. OTHER (Specify)

APPROVED

DISAPPROVED

16. REQUESTED CLEARANCE

17. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 17a. DATE SIGNED

PREVIOUS EDITIONS ARE OBSOLETE.

AF IMT 103, 19940801, V3

Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign

INSTRUCTIONS

The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.

18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)

AF IMT 103, 19940801, V3

(REVERSE)

8.2.1.3158.1.475346.466429

HAS:
HASNOT:
APPRVD:
DAPPRVD:
Entery date as YYYYMMDD.:
LOCA:
WONO:
CTRNO:
ABC:
ABC_2:
ABC_3:
D:
E:
F:
OVHA:
OVHB:
UNDGA:
UNDGB:
GHI:
GHI_2:
GHI_3:
OTH:
Enter date as YYYYMMDD.:
ReqOffclSig:
TELE:
ORGN:
REMKA:
SIGNATURE1:
REMKA_2:
SIGNATURE2:
REMKA_3:
SIGNATURE3:
REMKA_4:
SIGNATURE4:
REMKA_5:
SIGNATURE5:
REMKA_6:
SIGNATURE6:
REMKA_7:
SIGNATURE7:
REMKA_8:
SIGNATURE8:
ZONE:
REMKB:
SIGNATURE9:
OTHB:
REMKC:
SIGNATURE10:
REMKD:
SIGNATURE11:
REMKD_2:
SIGNATURE12:
REMKD_3:
SIGNATURE13:
REMKD_4:
SIGNATURE14:
REMKD_5:
OTHC:
REMKE:
COMUTIL:
COMUTIL_2:
COMUTIL_3:
AppOffcrSig:
SIGNATURE16:
SIGNATUREfor13:
EF_1:
EF_2:
REMKSF:
SignatureStyle1:
SignatureStyle2:

File details come from the government source that posted it. Updated .