This document is a detailed guideline for temporary fencing requirements when conducting construction projects in desert tortoise habitats at Nellis Air Force Base. The guidelines specify that temporary fencing should be flush with the ground or up to 4 inches deep, standing 18-24 inches high, and can be constructed using fabric cloth or plastic mesh with gaps no larger than 2x2 inches. Fencing must be staked 6-12 inches into the ground and placed around work areas, with provisions for gates and ensuring complete coverage of exposed trenches.

The Nellis Natural Resource Program will provide clearance surveys for short-duration projects, requiring at least a couple weeks' notice to schedule an Authorized Biologist. The biologist will conduct a site survey and provide a mandatory 10-minute Awareness Training for contractors, as required under the Nellis AFB Programmatic Biological Opinion. Contact for these services is Anna Johnson, who can be reached at anna.johnson.18@us.af.mil or 702-652-4354, with an electronic copy of the Biological Opinion available upon request.

View the file

Other files

File Type Posted
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE.xlsx XLSX spreadsheet
Solicitation - FA486125R0006.pdf PDF
Atch 44-APPENDIX 42 Uniform Standard Specifications for Clark County.pdf PDF
Atch 42-APPENDIX 40 Uniform Design and Construction Standards (UDACS).pdf PDF
Atch 41-APPENDIX 39 Nellis-Creech IFS Electrical Req.pdf PDF
Atch 34-APPENDIX 32 Installation Plan 12 - Hazardous Waste Management Plan (27 Sep 23).pdf PDF
Atch 31-APPENDIX 29 AF 3064 Progress Schedule Template.xlsx XLSX spreadsheet
Atch 24-APPENDIX 22 NAFB 0-74 Range Pass.pdf PDF
Atch 23-APPENDIX 21 Nuclear Gauge Request Form 2.pdf PDF
Atch 19-APPENDIX 17 AF Form 103 - Dig Permit.pdf PDF
Atch 17-APPENDIX 15 ADA Warning Panel Detail.pdf PDF
Atch 15-APPENDIX 13 Field Molded Joint Seal Details.pdf PDF
Atch 12-APPENDIX 10 Full Depth Rpr Details.pdf PDF
Atch 10-APPENDIX 8 Sleeve Bollards Detail.pdf PDF
Atch 9-APPENDIX 7 Valley Gutter Detail.pdf PDF
Atch 7-APPENDIX 5 L Curb and Gutter Detail.pdf PDF
Atch 4-APPENDIX 2 Mooring Detail.pdf PDF
Atch 52-NV20250001 Building Heavy and Highway.pdf PDF
Atch 51-Sample Client Authorization Letter.pdf PDF
Atch 48-Sub or Teaming Partner Consent Form.pdf PDF
Atch 43-APPENDIX 41 Uniform Standard Drawings for Clark County.pdf PDF
Atch 30-APPENDIX 28 AF Form 3065 Progress Report Template.pdf PDF
Atch 29-APPENDIX 27 NTTR Visit Request.pdf PDF
Atch 28-APPENDIX 26 DOD Supplement to National Manual Uniform Traffic Control Devices.pdf PDF
Atch 27-APPENDIX 25 National Manual Uniform Traffic Control Devices 11th Edition.pdf PDF
Atch 26-APPENDIX 24 Work Clearance Triggers.pdf PDF
Atch 25-APPENDIX 23 Env Permit-ATP Guidance (2023).pdf PDF
Atch 20-APPENDIX 18 AF Form 103 - Outage Request.pdf PDF
Atch 3-APPENDIX 1 Utility Ducts Detail.pdf PDF
Atch 50-Past Performance Questionnaire.pdf PDF
Atch 49-Past Performance Information Sheet.pdf PDF
Atch 47-AF Form 103 - Outage Request.pdf PDF
Atch 46-Nellis Single Pass (2 Months Max).pdf PDF
Atch 45-99 SFS-Mass Pass Request.xlsx XLSX spreadsheet
Atch 40-APPENDIX 38 Nellis-Creech 2710 Communication Installation Standards.pdf PDF
Atch 39-APPENDIX 37 Typical Exterior Color Schedule.pdf PDF
Atch 38-APPENDIX 36 AF 3000 Material Approval Submittal.pdf PDF
Atch 37-APPENDIX 35 AF 66 Schedule of Material Submittals.xlsx XLSX spreadsheet
Atch 36-APPENDIX 34 NAFB Suitable Tree List.pdf PDF
Atch 33-APPENDIX 31 14_USAF Integrated Cultural Resources Mgmt Plan 32-7065 ICRMP (15 Nov 2019).pdf PDF
Atch 18-Appendix 16 Nellis Creech IFS.pdf PDF
Atch 14-APPENDIX 12 Crack Rpr Detail.pdf PDF
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE 09AUG24_Blank.xlsx XLSX spreadsheet
Atch 53-NV20250058 Highway.pdf PDF
Atch 32-APPENDIX 30 Plan 32-7086 Hazardous Material Management Plan June 2021.pdf PDF
Atch 22-APPENDIX 20 Nuclear Gauge Request Form 1.xlsx XLSX spreadsheet
Atch 21-APPENDIX 19 Schedule of Values Template.xlsx XLSX spreadsheet
Atch 16-APPENDIX 14 Compression Seal Detail.pdf PDF
Atch 13-APPENDIX 11 Rpr of Concrete (Fail Keyway).pdf PDF
Atch 11-APPENDIX 9 Partial Depth Rpr Details.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Temporary Fencing for Desert Tortoise Projects

The requirements for temporary fencing for a construction project are less stringent than permanent tortoise proof fencing, and are as follows:

• The fencing should be flush with the ground (no gaps) or up to 4 inches deep, and height of fence 18-24 inches above the ground.

• The fencing can be staked with rebar or other stakes, with the stakes sunk 6-12 inches into the ground.

• The fencing can be fabric cloth fencing or plastic mesh fencing provided the gaps in the mesh are 2X2 inches or less in size.

• Place the fencing around the area to be trenched, include enough area within fencing to allow for needed workspace, equipment, etc.

• Enclosed area may have an opening for a gate (section that opens) to let people and equipment in and out, but gate should remain closed when not in use.

• A clearance survey the first day of the work prior to placing the fencing is needed.

• If a clearance survey were to identify an active tortoise burrow immediately adjacent to the work site, fencing can be placed around the burrow for the few days duration of work at that work site, and then removed when the work moves down the line.

• If a project is going to be completed in phases, then fencing can be placed in the section being worked.

• Trenches need to be fenced the entire length of exposed trench.

The Nellis Natural Resource Program can provide clearance surveys for short duration/small scale projects. We need to know the time work to be executed with a couple weeks’ notice, or as much as possible to schedule ‘Authorized Biologist’. The biologist shall provide contractor with Awareness Training at the site (~10 min); (required under the Nellis AFB Programmatic Biological Opinion, File No.

1-5-07-F-497).

Nellis Natural Resource Program points of contact:

Anna Johnson anna.johnson.18@us.af.mil 702-652-4354

Note: An electronic copy of the Nellis AFB Programmatic Biological Opinion, File No. 2022-0051434, can be provided upon request.

mailto:anna.johnson.18@us.af.mil

File details come from the government source that posted it. Updated .