Atch 14-APPENDIX 12 Crack Rpr Detail.pdf
PDF 2 MB Posted
- Attached to
- Nellis AFB Paving IDIQ
- Solicitation number
- FA486125R0006
About this file
This document is an Appendix 12 Crack Repair Detail technical drawing from February 7, 2016, associated with contract FA4861-16-R-A300. The image illustrates a three-stage crack repair process for concrete pavements: (1) Original Crack, (2) After Routing, and (3) Sealing (with a minimum 1/8" recess). The technical drawing notes that the variable width and amount of spalling along cracks necessitates different repair procedures, referencing additional figures 2-33a and 2-33b for detailed instructions. The reference documentation indicates the technical guidance is from TM 5-822-9/AFM 88-8, Chapter 10, specifically addressing repair of rigid pavements using epoxy resin grouts, mortars, and concrete. The document is part of the Nellis Air Force Base Paving IDIQ (Indefinite-Delivery Indefinite-Quantity) contract for construction and repair paving projects.
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix 12 Crack Repair Detail 7 Feb 2016
FA4861-16-R-A300
File details come from the government source that posted it. Updated .