The document is an Air Force Material Approval Submittal (AF IMT 3000) form used by contractors to submit shop drawings, equipment data, manufacturer's literature, certificates, and material samples for government approval during contract execution. The form is designed for contractors to certify that materials comply with contract specifications, with spaces for itemizing specific materials, specification sections, and drawing/catalog numbers for review and approval by contracting officers.

Key instructions include: numbering submissions consecutively by contract, clearly identifying and tabbing items for approval, preparing 4 copies of the form, and understanding that the submittal is not valid without the contracting officer's signature. The form is part of the Nellis AFB Paving Indefinite-Delivery Indefinite-Quantity (IDIQ) contract (Solicitation Number FA486125R0006), which covers construction and repair paving projects for Nellis Air Force Base and southern portions of the Nevada Test and Training Range.

View the file

Other files

File Type Posted
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE.xlsx XLSX spreadsheet
Solicitation - FA486125R0006.pdf PDF
Atch 52-NV20250001 Building Heavy and Highway.pdf PDF
Atch 51-Sample Client Authorization Letter.pdf PDF
Atch 48-Sub or Teaming Partner Consent Form.pdf PDF
Atch 43-APPENDIX 41 Uniform Standard Drawings for Clark County.pdf PDF
Atch 35-APPENDIX 33 Desert Tortoise Temporary Fencing Guidelines.pdf PDF
Atch 30-APPENDIX 28 AF Form 3065 Progress Report Template.pdf PDF
Atch 29-APPENDIX 27 NTTR Visit Request.pdf PDF
Atch 28-APPENDIX 26 DOD Supplement to National Manual Uniform Traffic Control Devices.pdf PDF
Atch 27-APPENDIX 25 National Manual Uniform Traffic Control Devices 11th Edition.pdf PDF
Atch 26-APPENDIX 24 Work Clearance Triggers.pdf PDF
Atch 25-APPENDIX 23 Env Permit-ATP Guidance (2023).pdf PDF
Atch 20-APPENDIX 18 AF Form 103 - Outage Request.pdf PDF
Atch 3-APPENDIX 1 Utility Ducts Detail.pdf PDF
Atch 44-APPENDIX 42 Uniform Standard Specifications for Clark County.pdf PDF
Atch 42-APPENDIX 40 Uniform Design and Construction Standards (UDACS).pdf PDF
Atch 41-APPENDIX 39 Nellis-Creech IFS Electrical Req.pdf PDF
Atch 34-APPENDIX 32 Installation Plan 12 - Hazardous Waste Management Plan (27 Sep 23).pdf PDF
Atch 31-APPENDIX 29 AF 3064 Progress Schedule Template.xlsx XLSX spreadsheet
Atch 24-APPENDIX 22 NAFB 0-74 Range Pass.pdf PDF
Atch 23-APPENDIX 21 Nuclear Gauge Request Form 2.pdf PDF
Atch 19-APPENDIX 17 AF Form 103 - Dig Permit.pdf PDF
Atch 17-APPENDIX 15 ADA Warning Panel Detail.pdf PDF
Atch 15-APPENDIX 13 Field Molded Joint Seal Details.pdf PDF
Atch 12-APPENDIX 10 Full Depth Rpr Details.pdf PDF
Atch 10-APPENDIX 8 Sleeve Bollards Detail.pdf PDF
Atch 9-APPENDIX 7 Valley Gutter Detail.pdf PDF
Atch 7-APPENDIX 5 L Curb and Gutter Detail.pdf PDF
Atch 4-APPENDIX 2 Mooring Detail.pdf PDF
Atch 50-Past Performance Questionnaire.pdf PDF
Atch 49-Past Performance Information Sheet.pdf PDF
Atch 47-AF Form 103 - Outage Request.pdf PDF
Atch 46-Nellis Single Pass (2 Months Max).pdf PDF
Atch 45-99 SFS-Mass Pass Request.xlsx XLSX spreadsheet
Atch 40-APPENDIX 38 Nellis-Creech 2710 Communication Installation Standards.pdf PDF
Atch 39-APPENDIX 37 Typical Exterior Color Schedule.pdf PDF
Atch 37-APPENDIX 35 AF 66 Schedule of Material Submittals.xlsx XLSX spreadsheet
Atch 36-APPENDIX 34 NAFB Suitable Tree List.pdf PDF
Atch 33-APPENDIX 31 14_USAF Integrated Cultural Resources Mgmt Plan 32-7065 ICRMP (15 Nov 2019).pdf PDF
Atch 18-Appendix 16 Nellis Creech IFS.pdf PDF
Atch 14-APPENDIX 12 Crack Rpr Detail.pdf PDF
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE 09AUG24_Blank.xlsx XLSX spreadsheet
Atch 53-NV20250058 Highway.pdf PDF
Atch 32-APPENDIX 30 Plan 32-7086 Hazardous Material Management Plan June 2021.pdf PDF
Atch 22-APPENDIX 20 Nuclear Gauge Request Form 1.xlsx XLSX spreadsheet
Atch 21-APPENDIX 19 Schedule of Values Template.xlsx XLSX spreadsheet
Atch 16-APPENDIX 14 Compression Seal Detail.pdf PDF
Atch 13-APPENDIX 11 Rpr of Concrete (Fail Keyway).pdf PDF
Atch 11-APPENDIX 9 Partial Depth Rpr Details.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For Evaluation and Action

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

Form Approved OMB No 9000-0062 Expires May 31, 2005

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCP, 1060 Air Force Pentagon, Washington DC 20330-1060.

TO: (Contracting Officer) FROM: (Contractor) DATE

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

NEW RESUBMITTAL

PREVIOUS SUBMISSION NUMBER PROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM SPECIFICATION SECTION/ DESCRIPTION OF MATERIAL AP-

PROVED

DISAP-

PROVED

SEE

REVERSE INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.

DATE TYPE OR PRINT NAME AND TITLE SIGNATURE

FOR GOVERNMENT USE ONLY

TO: (Base Civil Engineering Officer)

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

TO: (AF Contracting Office)

RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

TO: (Contractor)

DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUEST

APPROVED

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN DAYS OF DATE SHOWN BELOW.

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE.

NO. PARA NO./DRAWING NO. (Include Type, Model Number, Catalog Number, Mfg., etc.)

COMMENTS

(Number to correspond with applicable Item Number on reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.

4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

AF IMT 3000, 20030901, V1 (REVERSE)

TO Contracting Officer:
FROM Contractor:
YYYYMMDD DATE:
CONTRACT NUMBER:
SUBMISSION NUMBER:
NEW: Off
RESUBMITTAL: Off
PREVIOUS SUBMISSION NUMBER:
PROJECT NUMBER:
ITEM NORow1:
SPECIFICATION SECTION PARA NODRAWING NORow1:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow1:
INITIAL:
ITEM NORow2:
SPECIFICATION SECTION PARA NODRAWING NORow2:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow2:
INITIAL_2:
ITEM NORow3:
SPECIFICATION SECTION PARA NODRAWING NORow3:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow3:
INITIAL_3:
ITEM NORow4:
SPECIFICATION SECTION PARA NODRAWING NORow4:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow4:
INITIAL_4:
ITEM NORow5:
SPECIFICATION SECTION PARA NODRAWING NORow5:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow5:
INITIAL_5:
ITEM NORow6:
SPECIFICATION SECTION PARA NODRAWING NORow6:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow6:
INITIAL_6:
ITEM NORow7:
SPECIFICATION SECTION PARA NODRAWING NORow7:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow7:
INITIAL_7:
ITEM NORow8:
SPECIFICATION SECTION PARA NODRAWING NORow8:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow8:
INITIAL_8:
ITEM NORow9:
SPECIFICATION SECTION PARA NODRAWING NORow9:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow9:
INITIAL_9:
ITEM NORow10:
SPECIFICATION SECTION PARA NODRAWING NORow10:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow10:
INITIAL_10:
ITEM NORow11:
SPECIFICATION SECTION PARA NODRAWING NORow11:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow11:
INITIAL_11:
YYYYMMDD DATE_2:
TYPE OR PRINT NAME AND TITLE:
TO Base Civil Engineering Officer:
For Evaluation and Action:
YYYYMMDD DATE_3:
TYPE OR PRINT NAME AND GRADE:
TO AF Contracting Office:
YYYYMMDD DATE_4:
TYPE OR PRINT NAME AND GRADE_2:
TO Contractor:
APPROVED: Off
RESUBMITTAL ON DISAPPROVED ITEMS WITHIN:
YYYYMMDD DATE_5:
TYPE OR PRINT NAME AND GRADE_3:
COMMENTS Number to correspond with applicable Item Number on reverseRow1:
COMMENTS Number to correspond with applicable Item Number on reverseRow2:
COMMENTS Number to correspond with applicable Item Number on reverseRow3:
COMMENTS Number to correspond with applicable Item Number on reverseRow4:
COMMENTS Number to correspond with applicable Item Number on reverseRow5:
COMMENTS Number to correspond with applicable Item Number on reverseRow6:
COMMENTS Number to correspond with applicable Item Number on reverseRow7:
COMMENTS Number to correspond with applicable Item Number on reverseRow8:
COMMENTS Number to correspond with applicable Item Number on reverseRow9:
COMMENTS Number to correspond with applicable Item Number on reverseRow10:
COMMENTS Number to correspond with applicable Item Number on reverseRow11:
COMMENTS Number to correspond with applicable Item Number on reverseRow12:
COMMENTS Number to correspond with applicable Item Number on reverseRow13:
COMMENTS Number to correspond with applicable Item Number on reverseRow14:
COMMENTS Number to correspond with applicable Item Number on reverseRow15:
COMMENTS Number to correspond with applicable Item Number on reverseRow16:
COMMENTS Number to correspond with applicable Item Number on reverseRow17:
COMMENTS Number to correspond with applicable Item Number on reverseRow18:
COMMENTS Number to correspond with applicable Item Number on reverseRow19:
COMMENTS Number to correspond with applicable Item Number on reverseRow20:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off

File details come from the government source that posted it. Updated .