This document is a Schedule of Values Template for a construction project, detailing a comprehensive breakdown of project costs across 33 divisions with a total bid value of $3,887,625.72. The template covers multiple construction aspects including project management, demolition, concrete work, masonry, electrical, HVAC, communications, and specialty systems for what appears to be a warehouse construction project.

Key cost divisions include Electrical (26.00% or $1,010,782.68), HVAC (25.80% or $1,003,007.42), Communications (8.29% or $322,284.18), and Finishes (10.96% or $426,083.78). The project involves significant infrastructure work such as steel doors and frames, fire suppression systems, plumbing, electrical distribution systems, low voltage switchgear, and communications infrastructure. While the template is associated with a Nellis Air Force Base paving IDIQ contract, this specific document appears to be for a warehouse construction project with detailed line-item cost allocations across various construction disciplines.

View the file

Other files

File Type Posted
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE.xlsx XLSX spreadsheet
Solicitation - FA486125R0006.pdf PDF
Atch 44-APPENDIX 42 Uniform Standard Specifications for Clark County.pdf PDF
Atch 42-APPENDIX 40 Uniform Design and Construction Standards (UDACS).pdf PDF
Atch 41-APPENDIX 39 Nellis-Creech IFS Electrical Req.pdf PDF
Atch 34-APPENDIX 32 Installation Plan 12 - Hazardous Waste Management Plan (27 Sep 23).pdf PDF
Atch 31-APPENDIX 29 AF 3064 Progress Schedule Template.xlsx XLSX spreadsheet
Atch 24-APPENDIX 22 NAFB 0-74 Range Pass.pdf PDF
Atch 23-APPENDIX 21 Nuclear Gauge Request Form 2.pdf PDF
Atch 19-APPENDIX 17 AF Form 103 - Dig Permit.pdf PDF
Atch 17-APPENDIX 15 ADA Warning Panel Detail.pdf PDF
Atch 15-APPENDIX 13 Field Molded Joint Seal Details.pdf PDF
Atch 12-APPENDIX 10 Full Depth Rpr Details.pdf PDF
Atch 10-APPENDIX 8 Sleeve Bollards Detail.pdf PDF
Atch 9-APPENDIX 7 Valley Gutter Detail.pdf PDF
Atch 7-APPENDIX 5 L Curb and Gutter Detail.pdf PDF
Atch 4-APPENDIX 2 Mooring Detail.pdf PDF
Atch 50-Past Performance Questionnaire.pdf PDF
Atch 49-Past Performance Information Sheet.pdf PDF
Atch 47-AF Form 103 - Outage Request.pdf PDF
Atch 46-Nellis Single Pass (2 Months Max).pdf PDF
Atch 45-99 SFS-Mass Pass Request.xlsx XLSX spreadsheet
Atch 40-APPENDIX 38 Nellis-Creech 2710 Communication Installation Standards.pdf PDF
Atch 39-APPENDIX 37 Typical Exterior Color Schedule.pdf PDF
Atch 38-APPENDIX 36 AF 3000 Material Approval Submittal.pdf PDF
Atch 37-APPENDIX 35 AF 66 Schedule of Material Submittals.xlsx XLSX spreadsheet
Atch 36-APPENDIX 34 NAFB Suitable Tree List.pdf PDF
Atch 33-APPENDIX 31 14_USAF Integrated Cultural Resources Mgmt Plan 32-7065 ICRMP (15 Nov 2019).pdf PDF
Atch 18-Appendix 16 Nellis Creech IFS.pdf PDF
Atch 14-APPENDIX 12 Crack Rpr Detail.pdf PDF
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE 09AUG24_Blank.xlsx XLSX spreadsheet
Atch 52-NV20250001 Building Heavy and Highway.pdf PDF
Atch 51-Sample Client Authorization Letter.pdf PDF
Atch 48-Sub or Teaming Partner Consent Form.pdf PDF
Atch 43-APPENDIX 41 Uniform Standard Drawings for Clark County.pdf PDF
Atch 35-APPENDIX 33 Desert Tortoise Temporary Fencing Guidelines.pdf PDF
Atch 30-APPENDIX 28 AF Form 3065 Progress Report Template.pdf PDF
Atch 29-APPENDIX 27 NTTR Visit Request.pdf PDF
Atch 28-APPENDIX 26 DOD Supplement to National Manual Uniform Traffic Control Devices.pdf PDF
Atch 27-APPENDIX 25 National Manual Uniform Traffic Control Devices 11th Edition.pdf PDF
Atch 26-APPENDIX 24 Work Clearance Triggers.pdf PDF
Atch 25-APPENDIX 23 Env Permit-ATP Guidance (2023).pdf PDF
Atch 20-APPENDIX 18 AF Form 103 - Outage Request.pdf PDF
Atch 3-APPENDIX 1 Utility Ducts Detail.pdf PDF
Atch 53-NV20250058 Highway.pdf PDF
Atch 32-APPENDIX 30 Plan 32-7086 Hazardous Material Management Plan June 2021.pdf PDF
Atch 22-APPENDIX 20 Nuclear Gauge Request Form 1.xlsx XLSX spreadsheet
Atch 16-APPENDIX 14 Compression Seal Detail.pdf PDF
Atch 13-APPENDIX 11 Rpr of Concrete (Fail Keyway).pdf PDF
Atch 11-APPENDIX 9 Partial Depth Rpr Details.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF VALUES
Contract No: FA4861-XX
Project No & Title: RKMF/LKTC XX-XXXX Construct Warehouse
DIVISION 01 - GENERAL REQUIREMENTS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
1.1Project Management$38,098.730.98%
1.2Supervision$37,709.970.97%
1.3Project Trailer$1,555.050.04%
1.4Dumpster$777.530.02%
1.5Temporary Fence$777.530.02%
1.6Bond$54,038.001.39%
Division 01 Total$132,956.813.42%3.42%
DIVISION 02 - EXISTING CONDITIONS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
2.1Demolition Interior (Electrical)$11,662.880.30%
2.2Demolition Interior (Mechanical)$17,494.320.45%
2.3Demolition (Plumbing)$4,665.150.12%
2.4Demolition (Flooring)$4,665.150.12%
2.5Demolition (Openings)$11,662.880.30%
2.6Demolition (Concrete)$11,662.880.30%
2.7Demolition (Ceilings)$11,662.880.30%
2.8Demolition (Walls)$17,105.550.44%
2.9Demolition (Fire Suppression)$11,662.880.30%
2.10Demolition (Fire Alarm System)$5,442.680.14%
2.11Demolition (Communications)$7,775.250.20%
Division 02 Total$115,462.502.97%2.97%
DIVISION 03 - CONCRETE
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
3.1Concrete Pad (Generator)$48,595.321.25%
3.2Concrete Ceiling {Vault)$5,442.680.14%
3.3Concrete Pad (Mechanical Yard}$34,599.870.89%
3.4Concrete Pad (HVAC Units)$6,608.960.17%
3.5Concrete Reinforcements$27,602.140.71%
3.6Expansion Joints, Contraction Joinls$20,993.180.54%
Division 03 Total$143,842.153.70%3.70%
DIVISION 04 - MASONRY
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
4.1Mechanical Yard Masonrv Wall$40,431.311.04%
4.2Generator Pad Masonry Wall$20,215.650.52%
4.3Infill (Front Entry Area)$6,608.960.17%
4.4Masonry Patch Work (Roll-up Door)$6,608.960.17%
4.5Infill (Mechanical Louver Area$6,220.200.16%
4.6Vault$13,217.930.34%
Division 04 Total$93,303.012.40%2.40%
DIVISION 05 - METALS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
5.1Metal Stud Framing (Interior)$8,552.780.22%
5.20.00%
5.30.00%
Division 05 Total$8,552.780.22%0.22%
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
6.1Casework (Women's Restroom)$2,721.340.07%
6.2Casework (Men's Restroom)$2,721.340.07%
6.3Casework (Break Room)0.00%
Division 06 Total$5,442.680.14%0.14%
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
7.1Mineral Fiber Blanket lnsulation (Interior)$40,042.541.03%
7.20.00%
7.30.00%
Division 07 Total$40,042.541.03%1.03%
DIVISION 08 - OPENINGS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
8.1Steel Doors and Frames$186,606.034.80%
8.2Rolling Service Doors$10,885.350.28%
8.3Windows$4,276.390.11%
Division 08 Total$201,767.775.19%5.19%
DIVISION 09 - FINISHES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
9.1Gypsum Board$148,507.303.82%
9.2Paints and Coatings$65,312.111.68%
9.3Epoxy Flooring$9,719.060.25%
9.4Acoustlcal Ceiling$35,766.160.92%
9.5Resilient Flooring & Ceramic Tile$20,604.420.53%
9.6Rigid Access Flooring$146,174.733.76%
Division 09 Total$426,083.7810.96%10.96%
DIVISION 10 - SPECIALTIES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
10.1Toilet Accessories$4,665.150.12%
10.2Interior Signage$3,498.860.09%
10.30.00%
Division 10 Total$8,164.010.21%0.21%
DIVISION 13 - SPECIAL CONSTRUCTION
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
13.1Steel Deck Vault$17,105.550.44%
13.2Steel I-beam (Openings)$27,990.900.72%
13.3Steel louvers (Mech Yard)$8,552.780.22%
13.4Steel Gale (Generator)$2,332.580.06%
Division 13 Total$55,981.811.44%1.44%
DIVISION 21 - FIRE SUPPRESSION
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
21.1Riser$39,265.021.01%
21.2Wet Pipe Fire Sprinkler Piping$27,602.140.71%
21.3Testing$8,552.780.22%
Division 21 Total$75,419.941.94%1.94%
DIVISION 22 - PLUMBING
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
22.1Plumbing (Fixtures)$80,085.092.06%
22.2Plumbing Piping& Materials$38,098.730.98%
22.30.00%
Division 22 Total$118,183.823.04%3.04%
DIVISION 23 - HEATING, VENTILATION AND AIR CONDITIONING
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
23.1HVAC Air Handlers$204,489.115.26%
23.2Acoustics Duct Silencers$20,993.180.54%
23.3Exhaust & Supply Fans$10,885.350.28%
23.4Boiler & Computer Room Units (CRAC)$257,749.586.63%
23.5Variable Air Volume 0JAV) Boxes$15,161.740.39%
23.6Fire Smoke Dampers & Louvers$10,885.350.28%
23.7Testing, Adjusting & Balancing of HVAC Sys$34,211.110.88%
23.8Thermal lnsulation for Mechanical Sys$10,885.350.28%
23.9Duct Insulation$53,649.231.38%
23.10Duct Work & Duct Work Accessories$123,626.503.18%
23.11Diffusers, Registers & Grills$45,485.221.17%
23.12HVAC Controls$214,985.705.53%
Division 23 Total$1,003,007.4225.80%25.80%
DIVISION 26 - ELECTRICAL
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
26.1Electrical Conduit, Fillings, Boxes$138,788.243.57%
26.2Electrical Wire & Cable$291,571.937.50%
26.3Interior Distribution Systems$198,268.915.10%
26.4Low Voltage SwitchQear$192,826.234.96%
26.5Switchboards & Panel Boards$46,651.511.20%
26.6Interior lighting$65,312.111.68%
26.7Electrical Exterior Underground$77,363.751.99%
Division 26 Total$1,010,782.6826.00%26.00%
DIVISION 27 - COMMUNICATIONS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
27.1Comm Piping, Fittings and Boxes$96,801.882.49%
27.2Communications Wire$145,008.443.73%
27.3Communications Cable Tray$47,817.801.23%
27.4Testing$32,656.060.84%
Division 27 Total$322,284.188.29%8.29%
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
28.1Fire Alarm System Conduit & Fittings$43,930.171.13%
28.2Fire Alarm Panel and Power Boosters$6,608.960.17%
28.3Fire Alarm Programming & Testing$1,555.050.04%
28.4MNS Conduit and Fittings$22,159.470.57%
28.5MNS Panels$12,440.400.32%
28.6MNS Programming & Testing$1,166.290.03%
Division 28 Total$87,860.342.26%2.26%
DIVISION 31 - EARTHWORK
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
31.1Landscaping (Demo)$9,719.060.25%
31.2Landscaping (Replace)$9,719.060.25%
31.3Soil Compaction Test$4,665.150.12%
Division 31 Total$24,103.270.62%0.62%
DIVISION 32 - EXTERIOR IMPROVEMENTS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
32.1Bollards$2,332.580.06%
32.2Concrete Sidewalks$1,555.050.04%
32.3Fog Seal (Parking Lot)$3,887.630.10%
32.4Curb Stops (Parking Lot)$1,555.050.04%
32.5Restnping (Parking Lot)$1,166.290.03%
Division 32 Total$10,496.600.27%0.27%
DIVISION 33 - UTILITIES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
33.1Natural Gas$3,887.630.10%
33.20.00%
33.30.00%
Division 33 Total$3,887.630.10%0.10%
CLOSE-OUT DOCUMENTS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
AAs-Built Drawings0.00%
BWarranties
CO&M Manuals0.00%
D0.00%
Close-out Total$0.000.00%0.00%
BID TOTAL$3,887,625.72100.00%100.00%