This document is an Air Force Form 103 Base Civil Engineering Work Clearance Request for a project involving utility and potential excavation work. The form is associated with a Design-Build project to repair the main sewage line for Building 1330 at Mountain Home Air Force Base in Idaho. The clearance request involves multiple utility coordination points, including electrical, water, steam, sewer, and environmental systems distribution, with contact information provided for various base engineering and operational departments. The form requires stakeholder review and approval from different base organizations to ensure safe work execution, including security police, safety, communications, base operations, and utility companies. The form is specifically marked for work in the Cass Shop and Geo Base areas, with a checkbox indicating the work area has been staked and marked for excavation or utility disturbance.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cass Shop
Geo Base
MXG (If in airfield area)- Maj Sullivan, CMSgt Long, SMSgt Darling; Bldg: 7270 Rm: 127; Ph: 5824
DATE PREPAREDBASE CIVIL ENGINEERING WORK CLEARANCE REQUEST
(See Instructions on Reverse)
1. Clearance is requested to proceed with work at on Work Order No. , Contract No. , involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.
2. TYPE OF FACILITY/WORK INVOLVED
G. AIRCRAFT OR VEHICULAR TRAFFIC FLOWA. PAVEMENTS D. FIRE DETECTION & PROTECTION SYSTEMS
H. SECURITYB. DRAINAGE SYSTEMS E. UTILITY OVERHEAD UNDERGROUND
I. OTHERC. RAILROAD TRACKS F. COMM OVERHEAD UNDERGROUND
3. DATE CLEARANCE REQUIRED 4. DATE OF CLEARANCE
5. SIGNATURE OF REQUESTING OFFICIAL 6. TELEPHONE NO. 7. ORGANIZATION
ORGANIZATION REMARKS (Use Reverse for additional comments) REVIEWER'S NAME AND INITIALS
8.
A. ELECTRICAL DISTRIBUTION
B A
S B. STEAM DISTRIBUTION
E
C. WATER DISTRIBUTION
C I
D. POL DISTRIBUTIONV
I L
E. SEWER DISTRIBUTION
E N
F. ENVIRONMENTAL
G
I
G. PAVEMENTS/ GROUNDSN
E
E H. FIRE PROTECTION
R
I
I. ZONEN
G
J. OTHER (Specify)
9. SECURITY POLICE
10. SAFETY
11. COMMUNICATIONS
12. BASE OPERATIONS
13. CABLE TV
14. COMMERCIAL UTILITY COMPANY
TELEPHONE
GAS
ELECTRIC
15. OTHER (Specify)
16. REQUESTED CLEARANCE APPROVED DISAPPROVED
17. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 17a. DATE SIGNED
PREVIOUS EDITIONS ARE OBSOLETE.AF FORM 103, 19940801 (IMT-V1)
To include Cathodic and WIMS cable: Ralph Dupres/Mark Butler Bldg 8210 Ph. 5538/5541
H/W & Chilled Water Lines & Ice Melt at 7502 Mr. Davis, Bldg 8210, Ph 2503
28 CES Utilities Shop (To include irrigation lines) Mr. Smith, Bldg 8210, Ph. 5395 or 6222
Mr. Spicer/Mr. Fairey Bldg 8210, Ph. 2507 or 5402
28 CES Utilities Shop Mr. Smith or Mr. Israel Bldg 8210, Ph. 5395 or 6222
Compliance - Mr. Johnson, Bldg 8225 Ph. 2692 Restoration - Ms. Jensen, Bldg 8225 Ph. 2685
Mr. Macy or Mr. Malone, Bldg 7612 Dock #52 Ph. 2209 This includes RIDS (R/W Ice Detection System)
Mr. Beck Bldg 7502, 385-7306 Mr. Hilton, Fire Dept., Ph. 385-7305
Bldg 8210 Ph. 385-5143 Mr. Davis
Mr.Pape (CEN) Bldg: 1st floor bldg 8225; Ph: 385-6420
SFS Desk 5-4001 (Resource Security office near south door) Bldg 4400 Lori Watson Ph# 5-2988
Mr. Smartt or Mr. Walter, Base Ops.
Bldg 7501 Ph. 385-7233
Bldg 4307 Ph. 385-8353
MSgt Martinez (If on Airfield, Call Before You Dig) Base Ops, Bldg 7501 Ph. 385-1052/4275/1065
Mid-Continent Cable Quest One Stop 800-781-7474 Confirmation #
Telephone Systems O & M Contractor 385-1543 Bldg #4307
Natural Gas Maint.Mr. Smith/Mr. Israel Bldg 8210 Ph. 6222 or 5395
INSTRUCTIONS
The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.
18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)