Atch 23-APPENDIX 21 Nuclear Gauge Request Form 2.pdf

PDF 142 KB Posted

Attached to
Nellis AFB Paving IDIQ
Solicitation number
FA486125R0006
Issued by

About this file

This document is a Request for Authorization to Bring Radioactive Materials (RAM) form for Nellis AFB, Creech AFB, or the Nevada Test and Training Range (NTTR). The form requires detailed information about the licensee, including contact details, activities to be conducted (such as well logging, leak testing, calibrations, portable gauges, or radiography), and specific documentation requirements for bringing radioactive materials onto military installations.

The form mandates submission at least 30 calendar days before bringing RAM onto the installation, with a comprehensive package including a copy of the USAF contract clause, current NRC or Agreement State license, written authorization for periodic assessments, training certificates for authorized users, and a current leak test certificate. Failure to submit a complete package will result in automatic denial. The form includes a warning that false statements will lead to immediate denial of the application and potential notification to the Nuclear Regulatory Commission with possible civil and/or criminal penalties.

View the file

Other files

File Type Posted
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE.xlsx XLSX spreadsheet
Solicitation - FA486125R0006.pdf PDF
Atch 44-APPENDIX 42 Uniform Standard Specifications for Clark County.pdf PDF
Atch 42-APPENDIX 40 Uniform Design and Construction Standards (UDACS).pdf PDF
Atch 41-APPENDIX 39 Nellis-Creech IFS Electrical Req.pdf PDF
Atch 34-APPENDIX 32 Installation Plan 12 - Hazardous Waste Management Plan (27 Sep 23).pdf PDF
Atch 31-APPENDIX 29 AF 3064 Progress Schedule Template.xlsx XLSX spreadsheet
Atch 24-APPENDIX 22 NAFB 0-74 Range Pass.pdf PDF
Atch 19-APPENDIX 17 AF Form 103 - Dig Permit.pdf PDF
Atch 17-APPENDIX 15 ADA Warning Panel Detail.pdf PDF
Atch 15-APPENDIX 13 Field Molded Joint Seal Details.pdf PDF
Atch 12-APPENDIX 10 Full Depth Rpr Details.pdf PDF
Atch 10-APPENDIX 8 Sleeve Bollards Detail.pdf PDF
Atch 9-APPENDIX 7 Valley Gutter Detail.pdf PDF
Atch 7-APPENDIX 5 L Curb and Gutter Detail.pdf PDF
Atch 4-APPENDIX 2 Mooring Detail.pdf PDF
Atch 52-NV20250001 Building Heavy and Highway.pdf PDF
Atch 51-Sample Client Authorization Letter.pdf PDF
Atch 48-Sub or Teaming Partner Consent Form.pdf PDF
Atch 43-APPENDIX 41 Uniform Standard Drawings for Clark County.pdf PDF
Atch 35-APPENDIX 33 Desert Tortoise Temporary Fencing Guidelines.pdf PDF
Atch 30-APPENDIX 28 AF Form 3065 Progress Report Template.pdf PDF
Atch 29-APPENDIX 27 NTTR Visit Request.pdf PDF
Atch 28-APPENDIX 26 DOD Supplement to National Manual Uniform Traffic Control Devices.pdf PDF
Atch 27-APPENDIX 25 National Manual Uniform Traffic Control Devices 11th Edition.pdf PDF
Atch 26-APPENDIX 24 Work Clearance Triggers.pdf PDF
Atch 25-APPENDIX 23 Env Permit-ATP Guidance (2023).pdf PDF
Atch 20-APPENDIX 18 AF Form 103 - Outage Request.pdf PDF
Atch 3-APPENDIX 1 Utility Ducts Detail.pdf PDF
Atch 50-Past Performance Questionnaire.pdf PDF
Atch 49-Past Performance Information Sheet.pdf PDF
Atch 47-AF Form 103 - Outage Request.pdf PDF
Atch 46-Nellis Single Pass (2 Months Max).pdf PDF
Atch 45-99 SFS-Mass Pass Request.xlsx XLSX spreadsheet
Atch 40-APPENDIX 38 Nellis-Creech 2710 Communication Installation Standards.pdf PDF
Atch 39-APPENDIX 37 Typical Exterior Color Schedule.pdf PDF
Atch 38-APPENDIX 36 AF 3000 Material Approval Submittal.pdf PDF
Atch 37-APPENDIX 35 AF 66 Schedule of Material Submittals.xlsx XLSX spreadsheet
Atch 36-APPENDIX 34 NAFB Suitable Tree List.pdf PDF
Atch 33-APPENDIX 31 14_USAF Integrated Cultural Resources Mgmt Plan 32-7065 ICRMP (15 Nov 2019).pdf PDF
Atch 18-Appendix 16 Nellis Creech IFS.pdf PDF
Atch 14-APPENDIX 12 Crack Rpr Detail.pdf PDF
Atch 2-Nellis PAVING IDIQ PRICING SCHEDULE 09AUG24_Blank.xlsx XLSX spreadsheet
Atch 53-NV20250058 Highway.pdf PDF
Atch 32-APPENDIX 30 Plan 32-7086 Hazardous Material Management Plan June 2021.pdf PDF
Atch 22-APPENDIX 20 Nuclear Gauge Request Form 1.xlsx XLSX spreadsheet
Atch 21-APPENDIX 19 Schedule of Values Template.xlsx XLSX spreadsheet
Atch 16-APPENDIX 14 Compression Seal Detail.pdf PDF
Atch 13-APPENDIX 11 Rpr of Concrete (Fail Keyway).pdf PDF
Atch 11-APPENDIX 9 Partial Depth Rpr Details.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR AUTHORIZATION TO BRING RADIOACTIVE MATERIALS (RAM) ONTO NELLIS AFB,

CREECH AFB, OR THE NEVADA TEST AND TRAINING RANGE (NTTR)

1. NAME OF LICENSEE (person or firm proposing to conduct the activities described below)

2. TYPE OF REQUEST

INITIAL UPDATE

3. ADDRESS OF LICENSEE (mailing address or other location where licensee may be located)

4. LICENSEE CONTACT AND TITLE

5. PHONE NUMBER

6. WORK CELL NUMBER

7. FAX NUMBER

8. LICENSEE RADIATION SAFETY OFFICER NAME

9. RSO PHONE NUMBER

10. LICENSEE EMAIL ADDRESS

11. ACTIVITES TO BE CONDUCTED ON THE INSTALLATION

Well Logging Leak Testing and/or Calibrations

Portable Gauges Other (specify):

Radiography

12. INSTALLATION WHERE ACTIVITIES WILL BE CONDUCTED

Nellis AFB

Creech AFB

NTTR

13. PRIMARY CONTRACTOR INFORMATION (Name, Address, City, State, Zip Code)

14. ACTUAL PHYSICAL ADDRESS OF WORK LOCATION (Provide GPS coordinates if known)

15. PRIMARY CONTRACTOR PHONE NUMBER 16. WORK LOCATION PHONE NUMBER

Office

Work Cell

Office

Work Cell

17. DATES FOR REQUEST AUTHORIZATION 18. NUMBER OF DAYS

19. ADD

20. DELETE

21. CONTRACT PROJECT NUMBER

FROM:

TO:

WEEKENDS

YES NO

LIST ADDITIONAL WORK SITES ON A SEPARATE SHEET(S) TO INCLUDE ALL INFORMATION CONTAINED IN ITEMS 12-21 ABOVE

22. PROVIDE A DESCRIPTION OF THE TYPE AND SCOPE OF THE ACTIVITIES TO BE PERFORMED

23. MANUFACTURER:

24. MODEL NO:

25. SERIAL NO:

26. RAM License Number:

27. STATE: 28. EXPIRATION DATE:

29. AUTHORIZED USERS: (Last Name, First Name)

This request for authorization must be submitted to the Installation RSO at least 30 calendar days before bringing RAM onto the installation IAW AFI 40-201. Submission of this request for authorization with less than 30 days notice requires a signed letter by the requesting military organization addressing why the requirements of AFI 40-201 could not be met. The letter must also contain a signed acknowledgement from the requesting organization’s group commander.

In addition to this document the following information must be submitted as a part of the request for authorization:

- A copy of the USAF contract clause describing work to be performed at the installation and the inclusive dates of the work.

- A copy of a current NRC or Agreement State license

- Written authorization for the Installation RSO to conduct periodic assessments to ensure contractor personnel are complying with radiation safety practices to prevent exposures to USAF personnel and the general public, as well as, avoiding contamination of government property.

- Applicants holding a RAM license not issued by an Agreement State must also submit an approved NRC Form 241.

- Applicants applying to bring RAM onto NTTR must also submit an approved NRC Form 241.

- A copy of training certificates for all authorized users listed on this document. Training should be commensurate with the hazard/material being used.

- A copy of a current leak test certificate which meets the requirements of the RAM license.

Failure to submit a complete package containing the aforementioned documents will result in automatic denial of the request.

NOTE: If locations, dates, and times cannot be provided as a result of them being undetermined, written or email notification will be provided to the Installation RSO not later than 24 hours prior to bringing RAM onto the installation. The notification must contain the location, date, and time window of the activity is to be performed. Failure to comply with this requirement may result in rescinding of the authorization and notification to the NRC and/or State.

WARNING: False statements on this request for authorization to bring radioactive material onto Nellis AFB, Creech AFB, or the NTTR will result in immediate denial of this application or rescinding of your authorization if already issued. Additionally, notification will be made immediately to the Nuclear Regulatory Commission and/or the Agreement State jurisdictionally responsible for your license. Notification to the

NRC or State may result in civil and/or criminal penalties.

File details come from the government source that posted it. Updated .