Peterson SFB Bldg 3 Soil Erosion Repair
Cancelled Solicitation Posted
- Solicitation number
- FA251724Q0072
- Agency
-
Air Force Space Command
Air Force, Department of Defense
- Responses due
- Set-aside
- HUBZone
Opportunity facts
- NAICS code
- 561730 Landscaping Services
- PSC
- F999 Other Environmental Services
- Place of performance
- Colorado Springs, Colorado 80915, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Space Command is issuing a solicitation (FA251724Q0072) for the repair of eroded portions of the drainage channel and soil erosion on the retention pond located on the south side of Building 3 at Peterson Space Force Base. The contractor shall conduct all work in accordance with the specifications, applicable codes, and service requirement drawings and details. The evaluation factors are Technical Approach and Price, with award based on the lowest price technically acceptable offer. Quotations are due by 10:00 AM Mountain Time on 6 September 2024, and a site visit is scheduled for 15 August 2024.
This requirement is set aside for 100% HUBZone small businesses. The period of performance is 90 days from award, excluding final seed stabilization. The contract will be a firm fixed-price purchase order. Offerors must be registered in SAM and WAWF. The project location is Colorado Springs, CO 80915.
Notice text
2 versions
Update #2 · Latest ·
This requirement is for the Contractor to repair eroded portions of the drainage channel and the soil erosion on the retention pond located on the south side of Building 3, in accordance with (IAW) the Statement of Work (SOW). The Contractor shall conduct all work IAW the specifications, all applicable codes, and the service requirement drawings and details.
Amendment 1: The purpose of this amendment is to post the Questions and Answers with the associated attachments; futhermore, the AF Form 3000 has also been included in this amendment.
Update #1 ·
This requirement is for the Contractor to repair eroded portions of the drainage channel and the soil erosion on the retention pond located on the south side of Building 3, in accordance with (IAW) the Statement of Work (SOW). The Contractor shall conduct all work IAW the specifications, all applicable codes, and the service requirement drawings and details.
Files
Show all 21
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Paving Acquisition Vehicle - Rockies (PAV-R) IDIQ Sources Sought | Air Force Space Command | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity