SOW Attach 8 - AF Form 103.pdf
PDF 614 KB Posted
- Attached to
- Peterson SFB Bldg 3 Soil Erosion Repair
- Solicitation number
- FA251724Q0072
About this file
This document is an Air Force Form 103, which is a Base Civil Engineering Work Clearance Request used for all work that may disrupt aircraft, vehicular traffic, base utility services, fire/security systems, or routine base activities. The form requires the requestor to provide details on the proposed work location, description, equipment, depth, and coordination with various base agencies. The form must be approved by the Chief of Operations or Chief of Engineering Flight prior to the start of any excavation work on the installation. Key details include:
The proposed work involves repairing eroded portions of a drainage channel and soil erosion on the retention pond located south of Building 3, in accordance with the provided Statement of Work. The contractor must conduct all work per specifications, applicable codes, and the service requirement drawings/details. This form is associated with a federal contract opportunity (Solicitation Number FA251724Q0072) for the Peterson SFB Building 3 Soil Erosion Repair project, managed by the Department of the Air Force Space Command.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST
WORK TASK NO.
XXXXXXXXXXXXX
1. CONTACT INFORMATION
NAME OF REQUESTING OFFICIAL
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TELEPHONE NO.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ORGANIZATION
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
NAME OF 21 CES CONTRACT QAE / INSPECTOR (IF APPLICABLE) TELEPHONE NO. ORGANIZATION
2. WORK DETAILS
CLEARANCE IS REQUESTED TO PROCEED WITH WORK AT:
SUPPORTING WORK TASK / CONTRACT / PROJECT NO.
THIS EXCAVATION OR UTILITY DISTURBANCE AREA XX HAS XX HAS NOT BEEN CLEARLY MARKED
OR STAKED PER THE ATTACHED SKETCH.
3. TYPE OF FACILITY / WORK INVOLVED (MARK “ X ” IN ALL APPLICABLE FIELDS)
XX A. PAVEMENTS XX D. FIRE DETECTION & PROTECTION SYSTEMS XX G. AIRCRAFT OR VEHICULAR TRAFFIC
XX B. DRAINAGE SYSTEMS XX E. UTILITY XX OVERHEAD XX UNDERGROUND XX H. SECURITY
XX C. RAILROAD TRACKS XX F. COMM XX OVERHEAD XX UNDERGROUND XX I. OTHER (GAS) XXXXXXXXXXXXXXXXXX
4. ADDITIONAL DETAILS
BRIEF DESCRIPTION OF WORK TO BE ACCOMPLISHED.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
WHAT TYPE OF DIGGING EQUIPMENT WILL YOU BE USING?
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
CLEARANCE DATE REQUIRED:
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
HOW WIDE OF AN OPENING IS REQUIRED?
XXXXXXXXXXXXXXXXXXXXXXXXXXXX
WHAT IS THE MAXIMUM DEPTH REQUIRED?
XXXXXXXXXXXXXXXXXXXXXXXXXXXX
CAN THE DEPTH BE MODIFIED?
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
5. DECLARATION OF UNDERSTANDING
Initials I certify and/or understand the following:
I am the entity physically performing the excavation.
The proposed excavation site has been clearly marked using white flags or with environmentally safe, water-soluble white paint.
I must contact Colorado 811 for utility line locates (other than Base owned infrastructure).
The CSU Utility Line Locator service is a separate process from the 21 Civil Engineer Squadron (21 CES) Work Clearance.
I have included the Colorado 811 ticket number on my AF 103 Work Clearance Request.
The 21 CES Work Clearance request is valid for the duration of the project; it is my responsibility to maintain locate markings An active and approved 21 CES Work Clearance form must be on the excavation site at all times in the work site.
If excavation begins prior to approval of this Work Clearance request and/or if excavation occurs outside the boundaries of the indicated/marked proposed excavation site I can be held legally and financially liable for repairs.
I will contact 911 during any work related injuries requiring EMS.
I will call 21 CES at 719 556-4030 if utility lines are hit.
Company/Business/Squadron Telephone No.
Signature Of Requesting Official Today’s Date
AF FORM 103, NOV 17 PREVIOUS EDITIONS ARE OBSOLETE PAGE 1
1388453148A Underline
6. BASE AGENCIES
ORGANIZATION LOCATION PHONE REMARKS REVIEWER’S SIGNATURE
COLORADO 811
CO 811 reaches out to
CSU
16361 Table Mountain Pkwy, Golden, CO 80403 811
21 SECURITY FORCES
SQUADRON BLDG. 1376 556-4025
(E) 556-4000
21 SAFETY OFFICE BLDG. 845 556-6780
(E) 556-4555
21 COMMUNICATION
SQUADRON BLDG. 1038 556-3797
(E) 554-COMM
BASE OPERATIONS BLDG. 122 556-4986
(E) 556-4666
CABLE TV 301 MITCHELL ST 597-0873
649-3500
FAA BLDG. 205
C: 719 510-4721 O: 719 380-6744
7. SPECIAL COORDINATION WHEN EXCAVATING IN EITHER THE HOUSING AREA OR ALONG EAST AIR FIELD FENCE LINE
TIERRA VISTA
COMMUNITIES 650 MCCHORD ST
597-2372
(E) 550-1254
425-0790
MAGELLAN
(PETROLIUM LINE)
1004 S Santa Fe Ave, Fountain, CO 80817
C: 719 248-5550
(E) 800-720-2417
8. ADDITIONAL COMMENTS SECTION
AF FORM 103, NOV 17 PREVIOUS EDITIONS ARE OBSOLETE PAGE 2
AF FORM 103 PART II CIVIL ENGINEER USE ONLY
FLIGHT LOCATION PHONE COMMENTS REVIEWER’S
SIGNATURE / INITIALS
ENVIRONMENTAL B1324 556-7305
FIRE DEPARTMENT B218 556-4242
PAVEMENTS B1324 556-1442
IRRIGATION B1324 556-1479
WFSM B1284 556-1462
ELECTRICAL B1324 556-1470
HVAC B1324 556-1451
9. ADDITIONAL COMMENTS
10. IMPORTANT INFORMATION
-CATHODIC TEST STATIONS SHOULD BE VISIBLE IF PRESENT IN THE AREA-
FIRE DISPATCH (556-8376) BIO (556-7721) BLDG 1246 - CONFINED SPACE ENTRY & POTABLE WATER LINE BREAKS SECURITY FORCES BDOC (556-4000)
11. APPROVING OFFICIAL
NAME OF APPROVING OFFICER (CHIEF OF OPERATIONS OR CHIEF OF ENGINEERING FLIGHT)
DATE SIGNED SIGNATURE OF APPROVING OFFICER
AF FORM 103, NOV 17 PREVIOUS EDITIONS ARE OBSOLETE PAGE 3
DENIED
CLEARANCE REQUEST
APPROVED
AF FORM 103 WORK CLEARANCE REQUEST INSTRUCTIONS
The BCE work clearance request is used for all work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. This form is required for all excavation on the installation, regardless of depth and must be completed by the entity physically performing the excavation.
1. Requests to locate utilities by 21 Civil Engineering Squadron (21 CES) must be made no later than 14 days prior to excavation. Large or multi-location requests may take longer than 14 days depending on the size or scope.
2. The requester will complete sections 1-8 of the Work Clearance Form 103 and provide all the necessary work specifications. A diagram of the proposed work area must submitted with all requests or they will be denied. Please use GeoBase map website to create your work area map at: https://maps.af.mil/geoportal/home/webmap/ viewer.html?webmap=f3899106a6e54c5494a3281a75b3480c
3. The designated area must be clearly marked before submitting a work clearance request form. Mark the area with environmentally safe, water-soluble white paint (latex paint), we strongly recommend using flags during rain or snow. The requester will ensure utilities have been marked before excavating and will be responsible for maintaining those markings. The markings of underground utilities shall be considered valid as long as the markings are clearly visible, all markings are good from the 21 CES approval date. The requester is responsible for keeping up with the markings for the duration of the project. The contract QAE/Inspector is responsible for ensuring that the contractor is maintaining the markings by repainting, and putting locate flags. Keep in mind Colorado Springs Utilities (CSU) clearance requests have their own expiration date and must be maintained as well, the Colorado 811 locate request is separate from the AF Form 103 request.
4. The Magellan LP Damage Prevention operator must be on site when digging anywhere near the Magellan Liquid Petroleum Pipeline, please notify Chance Brabham at C: (719) 248-5550. Alternatively, call Magellan LP. at
(800) 720-2417. Please refer to the last page for the location of the pipeline; please contact the R&O office if you have any questions.
5. The requester will not proceed until the form has been fully completed and approved by the 21 CES Operations Flight Commander or Chief. The R&O office will contact the requester once the request has been approved. If any utilities are damaged without an approved AF Form 103 the contractor will be held responsible for the damage and repair.
6. The requester will provide a copy of the completed AF Form 103, with attachments, to the contract QAE/inspector (if applicable) or to a 21 CES Engineering personnel. Additionally a copy of the request form must be kept on the job site. Upon installation of new utilities the requester will provide updated as- built diagrams to 21 CES Engineering Flight.
IN THE EVENT OF UTILITY LINE(S) DAMAGE:
The requester will immediately contact the Base Fire Department at ext. 911 for any situation that requires emergency response. The requester will also immediately notify the Customer Service section of 21 CES at ext.
556-4030 and the Contracting Officer or Inspector when any utility line is damaged. Other agencies listed on the AF Form 103 will be contacted by the requester as appropriate.
AF FORM 103, NOV 17 PREVIOUS EDITIONS ARE OBSOLETE PAGE 4
Suffo lk St
Pa in e St
Hamilt on Ave
O ti s S t
McC hord
St
Peterson Blvd
Kincheloe Loop
Ent A ve
Va nd en be rg S t
Tr av is S t
Malm str om St
Pa tr ic k
St
Glasg ow Ave
Actus Way
Stewart A ve
Flig htli ne Acce ss
Road
Mitchell St
Min ot S t
Harti nger S t
Truax St
Tyndall A ve
Dover S t
Kelley St
Langley St
Se lfr id ge
D r
Goodfello w St
Cape Cod W ay
Dulu th
Ave St ew ar t B lv d
Clear LnBe al e Ln
Selfridge Way
Minot L n
Selfr idge St
Tin ker St
Thule St P.M cDonald W ay
Perrin St
Pe rr in Ln
Selfridge Ct
Se lfr id ge
A ve
Otis Circ le
Travis Cir
Vince nt S t
Ent A ve
Paine St
Vincent St
Tyndall Ave
Peterson Blvd
Langley St
Ent A ve
Duluth Ave
Otis St
Otis St
Peterson Blvd
Stewart A ve
St ew ar t A ve
Pain e St
M cC ho rd
S t
Pe rr in S t C lin ic
G ym
C lu b
C
IC
C D
C
N or th er n C om m an d
A F
Sp ac e C om m an d
Fi re
D ep t
M is si on
S up po rt
F ac ili ty
D
FA
C C ha pe l
C iv il En gi ne er in g
B ow lin g
LD
C
S
W H
Q
A rm y St ra te gi c
C om m an d
C D
C
Sw im m in g
TL
F
Pa tr io t H al l
N et w or k O ps
M is sl e
D ef en se
AW
H
Q
FA
A
To w er
Sh op et te
A ud ito riu m
Po st
O ffi ce
M cD on al d' s
M us eu m
Vi si to r C en te r
0 65
2 66
1 3
55 37
D oc um en t P at h:
O
:\1 _C om pr eh en si ve
_P la ns _a nd _S up po rti ng
_D at a\ 5_
P et er so nA
FB
\A _C
IP
\1
_M ap s\ 2_
M X
D \A
1_ C
LR
_B
_L _V
IS
IT
O R
.m xd
Stewart A ve
Se id le r
St
East Gate
St
Ea st
G at e En tr y
Stewart Ave
Ex ch an ge
C om m is sa ry
In te gr at io n
Su pp or t
C D
C D en ta l L ab
A
M ap
P ub lic at io n
D at e:
M ar ch
Pu bl ish er
: 2
SW
G eo In te gr at io n O ffi ce
Th is m ap is fo r re fe re nc e an d pla nn ing p ur po se s on ly an d is no t m ea nt to be u se d fo r en gi ne er ing o r su rv ey w or k.
Ev er y re as on ab le ef fo rt ha s be en m ad e to a ss ur e th e ac cu ra cy of th is m ap an d as so cia te d da ta
In fo rm at ion sa fe gu ar din g is th e re sp on sib ilit y of th e in div idu al/ ag en cy co m pa ny re qu es tin g an d ta kin g po ss es sio n of th is m ap
Re le as e or re pr od uc tio n of th is m ap or a ny p ar t of i t is pr oh ibi te d ex ce pt fo r of fic ial us e on ly.
No pu bl ic pu bli ca tio n of th is by an y m ea ns au th or ize d.
Th us t be de str oy ed pr op er ly.
Di re ct an y qu es tio ns in re ga rd s to th is po lic y to th e
HQ
AF
SP
C
GI
O at
-5
-6 or D
SN
-6
3.
I nf or m at io n Sa fe gu ar di ng re qu ire m en ts ar e pe rA
FM
AN
7-
4, A
FI
3-
2, D oD
R eg
.11 an d Ex ec ut ive O rd er wh en a pp lic ab le)
TH
IS
M A
P
IS
F O
R O
FF
IC
IA
L
U S
E O
N
LY
IN
FO
R
M
AT
IO
N
S A
FE
G
U A
R D
IN
G
IS
R
E Q
U
IR
E D
D O
N O
T D
U P
LI
C
A
TE
Pe te rs on
A
FB
V is ito r
M ap
1, 1, Fe et
C oo rd in at e
S ys te m
N
A D
S ta te
P la ne C ol or ad o
C en tra l F
IP
S
Fe et Pr oj ec tio n:
L am be rt
C on fo rm al C on ic
D at um : N or th
A m er ic an
Fa ls e Ea st in g:
,0
,0
.0
Fa ls e
N or th in g:
,0
,0
.0
C en tra l M er id ia n:
-1
.5
St an da rd
P ar al le l 1 : 3
8.
St an da rd P ar al le l 2
: 3 9.
La tit ud e
O f O rig in
: 3 7.
U ni ts : F oo t U
S
Le ge nd B ui ld in gs
A irf ie ld
S ur fa ce
R oa d
G ol fC ou rs e
In st al la tio n
W
ES
T G
A T
E
N O
R T
H G
A T
E
EA
ST
G A
T E
G at e H ou rs
N or th G at e:
M -F
0-
W es t G at e:
O pe n h rs /7 d ay s
Ea st
G at e:
M
-F
0-
Sa t 0
0-
Su n
-0 st
S pa ce W in g H
Q
..8
2n d A irl ift W in g H
Q…
.8
AF
S pa ce
C om m an d
HQ
..1
Ar y St ra te gi c C om m an d
HQ
Au di to riu m
..1
Bo w lin g
Al le y…
.4
Ch el
.1
Ch ild
D ev el op m en t C en te r (
CD
C)
.1
Ch ild
D ev el op m en t C en te r (
CD
C)
.1
Ch ild
D ev el op m en t C en te r (
CD
C)
.2
Ci vil
E ng in ee rin g…
..1
Cl ub
..1
Co m m iss ar y…
.2
De nt al La b…
Di ni ng F ac ili ty (D
FA
C)
Ex ch an ge
FA
A
To w er
..2
Fir e
De pa rt m en t…
Gy m
In te gr at io n
Su pp or t…
Le ar ni ng
D ev el op m en t C en te r (
LD
C)
M ed ic al
C lin ic
M iss ile D ef en se
.1
M iss io n
Su pp or t F ac ilit y…
M us eu m
Ne tw or k
O ps
.1
No rt he rn
C om m an d H
Q
.2
Pa tri ot H al l…
..5
Po st
O ffi ce
Sh op et te
Sw im m in g Po ol
Te m p Lo dg in g…
5, , 8
, 8
, 8
Vi si to r C en te r…
.1
Yo ut h Ce nt er
..1
_______________POL Line
| WORK TASK NO. |
| BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST |
| 556-4025 |
| BLDG. 1376 |
| (E) 556-4000 |
| ADPF5A5.tmp |
| Slide Number 1 |
| NAME OF REQUESTING OFFICIAL: |
| TELEPHONE NO: |
| ORGANIZATION: |
| NAME OF 21 CES CONTRACT QAE INSPECTOR IF APPLICABLE: |
| TELEPHONE NO_2: |
| ORGANIZATION_2: |
| CLEARANCE IS REQUESTED TO PROCEED WITH WORK AT: |
| SUPPORTING WORK TASK CONTRACT PROJECT NO: |
| BRIEF DESCRIPTION OF WORK TO BE ACCOMPLISHED: |
| WHAT TYPE OF DIGGING EQUIPMENT WILL YOU BE USING: |
| CLEARANCE DATE REQUIRED: |
| HOW WIDE OF AN OPENING IS REQUIRED: |
| WHAT IS THE MAXIMUM DEPTH REQUIRED: |
| CAN THE DEPTH BE MODIFIED: |
| OTHER: |
| COMPANY/BUSINESS/SQUADRON: |
| TODAY'S DATE: |
| TELEPHONE NO_3: |
| WORK TASK NO: |
| INITIALS: |
| 0: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: |
| 2: |
| 3: |
| 4: |
| Check Box10: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 6: Off |
| 7: Off |
| 8: Off |
| 9: Off |
| 10: Off |
| 11: Off |
| 12: |
| 0: Off |
| 1: Off |
| 2: Off |
| Safety: |
| Comm: |
| OPS: |
| Cable: |
| FAA: |
| TVC: |
| 8 ADDITIONAL COMMENTS SECTIONRow1: |
| POL: |
| ENVIRONMENTAL: |
| FIRE DEP: |
| PAVE: |
| GRDS: |
| WFSM: |
| ELECTRICAL: |
| HVAC: |
| ENG: |
| ADDITIONAL COMMENTS_2: |
| APPROVE: |
| 0: Off |
| DENIED: Off |
| NAME OF APPROVING OFFICER CHIEF OF OPERATIONS OR CHIEF OF ENGINEERING FLIGHT: |
| DATE SIGNED: |
| 0: |
| EXT DATE: |
| SIGNATURE OF APPROVING OFFICER: |
| CSU: 811 ticket # |
| SFS: |
File details come from the government source that posted it. Updated .