61-62 - EP3.0.pdf

PDF 564 KB Posted

Attached to
Surplus Real Property Sale For Economic Development; 438 Scott Boulevard
Solicitation number
RFP260305
Issued by
Hart County, Kentucky

About this file

This is an electrical engineering drawing prepared by the Commonwealth of Kentucky's Department for Facilities & Support Services, Division of Engineering, in conjunction with Kohrs Lonnemann Heil Engineers, PSC (KLH), a mechanical and electrical engineering firm. The document relates to the Gateway Urban Campus project located at 438-440 Scott Street in Covington, Kentucky. The drawing, designated as an Electrical Single Line Diagram for the Professional Services Classroom Center (EP3.0), was prepared on December 18, 2015, under KLH project number 11369.04 and engineering account number 470-C5N5-NC11-01. The drawing provides the electrical infrastructure design specifications for the classroom center component of the Gateway Urban Campus development.

This electrical single line diagram serves as a technical design document for the planned electrical systems and distribution required for the Professional Services Classroom Center at the Gateway Urban Campus. The document appears to be part of the preliminary or intermediate design phase for the facility development project. KLH Engineers, with offices in Lexington, Kentucky and additional locations in Columbus, Dayton, and New York, was contracted to provide professional engineering services for this project. The drawing is part of a larger set of design documentation that would support future construction contracting and implementation of the electrical infrastructure at the 438-440 Scott Street location in Covington.

View the file

Other files

File Type Posted
66-67 - CT0.0.pdf PDF
51-49 - HV1.3.pdf PDF
8-13 - A1-1 - FIRST FLOOR DEMOLITION AND NEW WORK PLANS.pdf PDF
34-35 - PD1.1.pdf PDF
30-30 - A8-2 - Basement - FINISHES.pdf PDF
29-29 - A8-1 - ROOM FINISH PLANS (N-I-C- FURNITURE LAYOUT).pdf PDF
12-11 - S4-2 - FRAMING DETAILS.pdf PDF
15-8 - S2-5 - ROOF FRAMING PLAN.pdf PDF
73-19 - A3-0 - BUILDING ELEVATIONS.pdf PDF
49-51 - HV2.0.pdf PDF
72-72 - CT5.2.pdf PDF
67-69 - CT1.2.pdf PDF
62-63 - EP4.0.pdf PDF
3-6 - S2-3 - SECOND FLOOR FRAMING PLAN.pdf PDF
23-24 - A5-2 - MISCELLANEOUS DETAILS.pdf PDF
43-46 - HV1.0.pdf PDF
17-3 - S1-1 - GENERAL NOTES.pdf PDF
13-18 - A2-1 - 2ND 3RD FLR REFLECTED CLG PLANS.pdf PDF
28-31 - A8-3 - 1st FLOOR - FINISHES.pdf PDF
21-23 - A5-1 - MISCELLANEOUS STAIR DETAILS.pdf PDF
70-71 - CT5.1.pdf PDF
36-37 - PL1.1.pdf PDF
42-44 - FP1.1.pdf PDF
31-32 - A8-4 - 2nd Floor - FINISHES.pdf PDF
32-33 - A8-5 - 3rd Floor - FINISHES.pdf PDF
50-52 - HV2.1.pdf PDF
38-40 - PL1.4.pdf PDF
35-34 - PD1.0.pdf PDF
69-70 - CT4.1.pdf PDF
39-39 - PL1.3.pdf PDF
11-12 - A1-0 - BASEMENT DEMOLITION AND NEW WORK PLANS.pdf PDF
68-68 - CT1.0.pdf PDF
25-26 - A6-1 - ENLARGED PLANS AND INTERIOR ELEVATIONS.pdf PDF
63-64 - EL1.0.pdf PDF
19-10 - S4-1 - FRAMING DETAILS.pdf PDF
65-66 - EL2.0.pdf PDF
2-2 - A0-1 - CODE INFO AND WALL TYPES.pdf PDF
9-14 - A1-2 - SECOND FLOOR DEMOLITION AND NEW WORK PLANS.pdf PDF
76-Elevator Inspection 2026-03-25-12-13-48.pdf PDF
58-59 - EP1.3.pdf PDF
46-47 - HV1.1.pdf PDF
57-58 - EP1.2.pdf PDF
80-438 Scott Full Inspection Report (PDF).pdf PDF
7-5 - S2-2 - FIRST FLOOR FRAMING PLAN.pdf PDF
53-54 - HV3.1.pdf PDF
4-9 - S3-1 - TYPICAL DETAILS.pdf PDF
1-4 - S2-1 - FOUNDATION PLAN.pdf PDF
24-25 - A6-0 - ENLARGED PLANS AND INTERIOR ELEVATIONS.pdf PDF
48-50 - HV1.4.pdf PDF
20-21 - A4-1 - BUILDING SECTIONS.pdf PDF
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE

DATE

ENGINEERING

DIVISION OF

AGENCY

AUTHORIZED AGENT

DIV. OF ENGR.

REVIEWED

ENGR. ACCT NO.

DRAWING NO.

DATE

A&E FILE NO.

CHECKED BY

SHEET DRAWN BY

RECORD DATE

DATEREVISIONS

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES & SUPPORT SERVICES

DIVISION OF ENGINEERING

FRANKFORT, KENTUCKY

WWW.KLHENGRS.COM

ENGINEERS, PSC

MECHANICAL/ELECTRICAL ENGINEERS

KOHRS LONNEMANN HEIL

LEXINGTON, KENTUCKY

COLUMBUS, OHIO

DAYTON, OHIO

NEW YORK, NEW YORK

1538 ALEXANDRIA PIKE, SUITE

11 FT. THOMAS, KENTUCKY

41075 800-354-9783

859-442-8050

859-442-8058 FAX

KLH PRO. NO.

11369.04

470-C5N5-NC11-01

GATEWAY URBAN CAMPUS

438-440 Scott St., Covington, KY 41011

12/18/15

201114.02

PROFESSIONAL SERVICES CLASSROOM CENTER

EP3.0

ELECTRICAL

SINGLE LINE DIAGRAM

File details come from the government source that posted it. Updated .