This is a roof framing plan prepared by Brown & Kubican, PSC, for the Commonwealth of Kentucky's Department for Facilities Management, Division of Engineering, for the Professional Services Classroom Center at Gateway Urban Campus located at 438-440 Scott Street in Covington, Kentucky. The plan details structural modifications and new construction related to roof framing systems, including the installation of new 2x12 wood rafters at 24-inch on-center spacing, new APA-rated roof sheathing overlays, steel reinforcement channels for existing wood girders, new steel beam installations with specified load capacities ranging from 200 to 3,000 pounds per reaction point, and associated structural connections using Simpson metal connectors. The project involves coordination between existing structural elements and new installations, including roof hatch modifications, mechanical unit support framing, and masonry wall reinforcement with channel bearing members. The drawing is dated December 18, 2015, and is approved for program concept only, scaled at 1/4 inch equals 1 foot.
The plan emphasizes field verification requirements, including contractor confirmation of all dimensions and existing wood column positions prior to steel shop drawing submission. Critical construction notes specify bearing requirements of two inches minimum on masonry walls, diagonal notching requirements for new members bearing on existing girders, firecut specifications at wall ends, and tight grouting of bearing pockets. Installation details include Simpson LTT19 rafter ties at six-foot maximum on-center spacing with adhesive anchors, Simpson LUS metal connectors for rafter and header connections, and 16-penny nails at 18-inch on-center spacing for sheathing attachment. The document requires contractor compliance with architectural and mechanical drawings for roofing systems, mechanical unit installation, and curb construction, with existing roofing systems to be removed as specified in accompanying demolition drawings.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H
S4.1
Hsim
S4.1
Ktyp
S4.1
B
C D EA
4"
O .C
EX
x1
W O
O D
R A
FT
ER
S
4"
O .C
EX
x1
W O
O D
R A
FT
ER
S
EX WOOD
ROOF DECK
EX WOOD
ROOF DECK
4"
O .C
EX
x1
W O
O D
R A
FT
ER
S
EX 8x11 WOOD GIRDER
EX 8x11 WOOD GIRDER
EX 8x11 WOOD GIRDER
EX 8x11 WOOD GIRDER
EX 8x11 WOOD GIRDER
EX WOOD GIRDER
+ NEW 15/32
APA
+ NEW 15/32
APA
1/4±
1/4±
5/8±
5/8±
5/8±
5/8±
ELEVATOR SHAFT
94' - 10 1/4" ±
6' - 6" ± 16' - 0" ± 18' - 0" ± 18' - 0" ± 17' - 0" ± 3' - 11" ± 15' - 5 1/4" ±
/8
/8
3typ
3typ
3typ 4typ
3typ4typ
P.T. (2) 2x12
6typ
8 8
C10x15.3
C10x15.3
C10x15.3
C10x15.3
C10x15.3
C10x15.3
C10x15.3
C10x15.3
C10x15.3
C10x15.3
W 8x
W 8x
W8x18 (8k)
W8x18 (8k)
N
S4.1
K
S4.1
K
S4.1
BP-1
BP-1
Mtyp
S4.1
Ltyp
S4.1
J
S4.1
P.
T.
(2 ) 2 x1
1 3/4x11 1/4 LVL 1 3/4x11 1/4 LVL
P
S4.1
14 14 14 14
RTU 3,000#
RTU 200#
RTU 1,700#
RTU 1,300#
W8x18 (8k)
W 8x
W 8x
BP-1
BP-1
N
S4.1
M
S4.2
P.
T.
(2 ) 2 x1
P.T. (2) 2x12
B
S2.5
FRAMING LEGEND
FRAMING PLAN NOTES
PROJECT
CONTRACTOR TO VERIFY ALL
DIMENSIONS IN THE FIELD
SERVICE LOAD REACTION (KIPS) EACH END.
W12x53 (8k)
L-1 = STEEL LINTEL. SEE SCHEDULE DETAIL R/S3.1.
= APPROXIMATE ROOF SLOPE.
BP-1 = STEEL BEAM BEARING PLATE. SEE DETAIL F/S3.1.
= 2 7/16" NORMAL WEIGHT CONCRETE REINFORCED W/
4x4-W2.1xW2.1 W.W.F. ON 9/16" 24 GA GALVANIZED NON-COMPOSITE
STEEL FORM DECK. (3" TOTAL THICKNESS).
S-3.0
= WALL BELOW.
1. ELEVATIONS SHOWN ARE REFERENCED FROM THE FINISHED FIRST
FLOOR REFERENCE ELEVATION = +0'-0".
2. SEE DWG S1.1 FOR GENERAL NOTES AND COLUMN SCHEDULE.
3. SEE DWG S3.1 FOR TYPICAL DETAILS.
4. DIMENSIONS ARE GIVEN TO THE FACE OF MASONRY WHERE APPLICABLE.
5. STEEL FRAMING AT NEW STAIR CONSTRUCTION IS INTENDED TO BE
POSITIONED SUCH THAT FINISHED FLOOR ELEVATION AT THE NEW
LANDINGS MATCH ELEVATION OF THE ADJACENT EXISTING FLOOR.
FIELD VERIFY EXISTING FLOOR ELEVATIONS AND ADJUST NOTED BEAM
AND SLAB ELEVATIONS AS REQUIRED TO ACHIEVE DESIGN INTENT.
6. WHERE NEW STEEL MEMBER ELEVATION IS NOT GIVEN IN PLAN, SEE
DETAILS FOR ADDITIONAL INFORMATION.
= EXISTING LOAD BEARING C.M.U. WALL.
= EXISTING LOAD BEARING BRICK MASONRY WALL.
5/8±
EX HW
= EXISTING STRUCTURALLY SPANNING HARDWOOD FLOORING.
EX HW +
(2) 3/4 SLATS = EXISTING HARDWOOD FLOORING OVER (2) LAYERS OF
3/4" DIAGONAL WOOD SLATS.
EX WOOD
ROOF DECK = EXISTING WOOD ROOF DECK SYSTEM. OVERLAY WITH 15/32" APA
RATED SHEATHING (EXPOSURE 1). NOTE, EXISTING ROOFING SYSTEM
(EXCLUDING DECKING) TO BE REMOVED. SEE DEMOLITION DWGS FOR
COMPLETE INFORMATION FOR WHAT IS TO BE REMOVED.
+ NEW 15/32
APA
EX HW (HIGH) +
= EXISTING FLOOR SYSTEM CONSISTING OF STRUCTURALLY
SPANNING HARDWOOD OVER SLEEPERS OVER (2) LAYERS
OF 3/4" WOOD SLATS SUPPORTED BY FLOOR JOISTS.
(2) 3/4 SLATS (LOW)
STEEL BEAM SIZE.
(+15'-11") = TOP OF BEAM / FLOOR ELEVATION (AS APPLICABLE).
SEE ARCH DWGS FOR
NEW ROOFING & SLOPE
EXISTING ROOF SHEATHING
NEW OVERLAY SHEATHING
SEE ROOF FRAMING PLAN
EXISTING ROOF
FRAMING MEMBEREXISTING ROOF
FRAMING MEMBER
NEW 2x12 + 2x2 LEDGER
TYP OF (2)
(TO REPLACE EXISTING FRAMING)
NEW 3/4" APA SHEATHING (OR RIPPED 2x)
INSTALL TIGHT TO UNDERSIDE OF EXISTING
ROOF SHEATHING
16d NAILS AT 18" O.C.
TYP
3/16"x2 1/2" (MIN) WOOD SCREWS @ 36" O.C.
(2x2 TO SHEATHING)
TYP
NOTES:
1. BEAR JOISTS 2" (MIN) ON MASONRY WALL AT ONE END. INCREASE SIZE OF
EXISTING WALL POCKET AS NEEDED TO AVOID NOTCHING 2x. FIRECUT 2x END AT WALL. INFILL MASONRY TIGHT POCKET TIGHT TO 2x.
2. AT EXISTING WOOD GIRDER, NOTCH NEW 2x12 MEMBERS TO BEAR ON TOP OF
GIRDER. NOTCH SHALL BE DIAGONAL CUT (SQAURE CUT IS NOT PERMITTED).
INSTALL 2x BLOCKING TO ADJACENT MEMBERS AT 2x12 BEARING.
NEW 2x BLOCKING TO MATCH
EXISTING BRIDGING LOCATIONS
TYP
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
ENGINEERING
DIVISION OF
AGENCY
AUTHORIZED AGENT
FOR INTENT ONLY
DIV. OF ENGR.
REVIEWED
ENGR. ACCT. NO.
DRAWING NO.
DATE
A&E FILE NO.
CHECKED BY
SHEET DRAWN BY
RECORD DATE
DATEREVISIONS
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES MANAGEMENT
DIVISION OF ENGINEERING
FRANKFORT, KENTUCKYDK
BSM
470-C5N5-NC11-01
PROFESSIONAL SERVICES CLASSROOM CENTER
RECORD DRAWINGS DATE: 12/18/2015
BROWN & KUBICAN, PSC.
These record drawings have been prepared, in part, on the basis of information compiled and furnished by others. The Engineers has not verified the accuracy and/or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.
/3
/2
:3 5:
A
M C
:\U se rs \b m cm ill an
\D es kt op
\L oc al F ile s\
\ 1
_0
G C
T C
A bo de
B K
L
O C
A L
B
S M
S
3.
rv t
S2.5
ROOF FRAMING PLAN
GATEWAY URBAN CAMPUS
438-440 Scott St., Covington, KY 41011
01/06/14
201114.02
1/4" = 1'-0"S2.5
A ROOF FRAMING PLAN
TAG NOTES
EX ELEVATOR SHAFT CAP LOCATED 4'-0"± ABOVE ROOF.
REINFORCE EX GIRDER WITH NOTED CHANNEL ON EACH SIDE. CONNECT
CHANNELS TO GIRDER PER DET L/S4.1 AND M/S4.1.
SIMPSON LTT19 SIMPSON TIE FROM RAFTER TO WALL @ 6'-0" O.C. (MAX) W/ (1)
5/8"øx6" EMBED ADHESIVE ANCHOR.
WHERE RAFTERS RUN PARALLEL TO WALL, ADD 2x BLOCKING BETWEEN
RAFTERS FOR SIMPSON TIE CONNECTION.
NEW ROOF HATCH. SEE ARCH DWGS FOR HATCH / CURB CONSTRUCTION.
SHORE AND CUT EX ROOF RAFTERS. FASTEN TO HEADER W/ SIMPSON LUS310
METAL CONNECTOR. ADD WOOD SHIMS TO THE SIDE OF EX RAFTER AT
CONNECTOR TO CREATE TIGHT FIT.
CONNECT NEW HEADER TO LVL SUPPORT MEMBER WITH SIMPSON LUS210-2
METAL CONNECTOR.
SISTER NEW LVL TO EX ROOF RAFTER ON HATCH SIDE OF RAFTER. SEE DET
H/S3.1 FOR LVL CONNECTION DETAILING.
INSTALL NOTED RAFTER TO FRAME EDGE OF HATCH OPENING. CONNECT TO
SUPPORT AT EACH END W/ SIMPSON LUS210-2 METAL CONNECTOR.
OPENING IN ROOF TO BE COVERED BY MECHANICAL UNIT AND CURB. SEE
ARCH AND MEP DWGS FOR UNIT, CURB, AND ROOFING CONSTRUCTION.
POCKET EX MASONRY WALL BEAR CHANNEL REINFORCING MEMBERS 8"
MINIMUM ON WALL. GROUT SOLID BELOW BEARING. CONNECT (BOLT) END OF
EX WOOD GIRDER TO CHANNEL AS SHOWN IN DET M/S4.1.
GROUT BEARING POCKET SOLID AFTER NEW MEMBER INSTALLATION IS
COMPLETE.
EXISTING ROOF HATCH TO BE COVERED. PROVIDE 2x6 @ 16" O.C. (MAX) INFILL
FRAMING AT EXISTING HATCH. FASTEN TO EX HEADERS WITH SIMPSON LUS26
METAL CONNECTOR AT EACH END. PROVIDE 1/2" APA SHEATHING IN MULTIPLE
LAYERS AS REQUIRED TO BUILD UP TO TYPICAL ADJACENT EX ROOF
SHEATHING ELEVATION.
GRIDS ARE SET TO NEW STEEL COLUMNS AND MAY OR MAY NOT ALIGN WITH
EXISTING WOOD COLUMNS AT UPPER LEVELS. CONTRACTOR SHALL FIELD
VERIFY EXISTING WOOD COLUMN POSITIONS PRIOR TO SUBMITTING STEEL
SHOP DRAWINGS FOR REVIEW. TRUE EXISTING COLUMN POSITION SHALL BE
NOTED ON THE STEEL SHOP DRAWINGS.
2x12 BLOCKING AT ROOF TOP UNIT PERIMETER. INSTALL BLOCKINGTIGHT TO
UNDERSIDE OF EXISTING ROOF SHEATHING.
EXISTING ROOF TOP MECHANICAL UNIT BEING REMOVED (SEE DEMOLITION
DWGS). IF ROOF PENETRATION OCCURS BELOW EXISTING UNIT, INFILL VOID
PER TAG NOTE 13 (THIS SHEET) AS PART OF BASE BID.
1 1/2" = 1'-0"S2.5