36-37 - PL1.1.pdf
PDF 642 KB Posted
- Solicitation number
- RFP260305
- Issued by
- Hart County, Kentucky
About this file
This is a plumbing design drawing for new first-floor mechanical, electrical, and plumbing (MEP) systems prepared by the Commonwealth of Kentucky's Finance and Administration Cabinet, Department for Facilities & Support Services, Division of Engineering, in partnership with KLH Engineers, PSC for the Gateway Urban Campus project located at 438-440 Scott Street in Covington, Kentucky. The drawing details comprehensive plumbing installation requirements for a cosmetology salon and related tenant spaces, including fixture locations, piping routes, drain configurations, supply line specifications, and venting systems. The design encompasses multiple plumbing fixtures across diverse spaces including a reception area, waiting area, consultation room, manicure/pedicure area, cosmetology salon, restrooms, dispensary, HVAC room, storage, and custodial areas. The document specifies detailed piping sizes (ranging from 1/2 inch to 4 inches), fixture connections, trap configurations, and coordination requirements between plumbing and other mechanical trades.
Key specifications include sanitary and vent piping for floor drains, water supply lines with hot and cold water distribution at various temperatures (100°F and 140°F), gas piping for equipment, and storm drainage systems. The drawing establishes critical installation requirements including pressure-reducing valves, vacuum breaker connections on hair wash sinks, trap seal primers on floor drains, and coordination protocols with HVAC, electrical, and sprinkler contractors. The contractor is required to conduct a site visit prior to bidding to verify existing conditions and identify any discrepancies between plans and field conditions, with immediate notification to the engineer required if variations are discovered. All work must comply with applicable local and state codes, with piping installation concealed wherever possible and fire-resistant, watertight sealing required at all penetrations.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B C D EA G
F
STORAGE
WOMEN
HVAC
DISPENSARY
CORRIDOR
100B
MEN
STAIR
D1
COSMETOLOGY SALON
WAITING AREA
RECEPTION
100A
CONSULTATION
100C
MANICURE/PEDICURE
AREA
100D
EXISTING STAIR
B
CORRIDOR
100E
S
V
S
S
S
V
V
V
S
S
S
S
S S
CUSTODIAL
FD1
FD1
WB1
WC1
WC1
UR1
LV1
LV1
HD1
HD1
HD1
HD1
SK2
DF1
SK1
PS1
PS1
PS1
PS1
HS1
HS1
HS1
HS1
HS1
MS1
1-1/2"VENT
DOWN
1-1/2"VENT
DOWN
1-1/2"VENT
DOWN
V
2"VENT DOWN
1-1/2"VENT
DOWN
2"VENT
DOWN
4"SAN
DOWN
3"SAN. TO FD1
ABOVE
1-1/2"SAN. TO SK3
ABOVE
4"SAN. TO WC1
ABOVE
4"SAN UP
3"VENT UP
2"SAN. TO UR1
ABOVE
1-1/2"VENT
DOWN
1-1/2"VENT
DOWN
1-1/2"SAN. TO
DF1 ABOVE
TO LV1
ABOVE
1-1/2"VENT
DOWN
1-1/2"VENT
DOWN
1-1/2"VENT
DOWN
1-1/2"VENT
DOWN
1-1/2"VENT
UP
3" SAN. TO
FD1 ABOVE
4"SAN. TO WC1
ABOVE
1-1/2"SAN. TO
LV1 ABOVE
4"STORM
DOWN
4"STORM
UP
3"SAN. TO
MS1 ABOVE
ISLAND VENT
FOR HS1
ISLAND VENT
FOR HS1
ISLAND VENT
FOR HS1
TO WB1
ABOVE
2"VENT DOWN
1-1/2"VENT DOWN
2"VENT
UP
1-1/2"SAN.
TO SK1 ABOVE
2"VENT DOWN
2"VENT UP
CO
2"VENT
DOWN
CO
CO
CO
CO
S T
ISLAND VENT
FOR HS1
2"SAN. UP TO
HS2 ABOVE
2"SAN. UP TO
HS2 ABOVE
2"SAN. UP TO
HS2 ABOVE
RUN PIPING TO
AVOID STRUCTURAL
ISSUES. MINIMIZE
THE NUMBER OF
STRUCTURAL
CROSSINGS IN THE
FIELD.
WH EXHAUST
THRU WALL
4" EXHAUST FROM
WATER HEATER
BELOW
B C D EA G
F
1" 100ºHW
1" CW
C W
1 1/4" CW
1" 100ºHW
STORAGE
WOMEN
HVAC
DISPENSARY
CORRIDOR
100B
MEN
STAIR
D1
COSMETOLOGY SALON
WAITING AREA
RECEPTION
100A
CONSULTATION
100C
MANICURE/PEDICURE
AREA
100D
EXISTING STAIR
B
CORRIDOR
100E
CUSTODIAL
WB1
HB
HB
WC1
WC1
UR1
LV1
LV1
SK2
DF1
SK1
MS1
3/4"CW DOWN
TO WC1
3/4"CW DOWN TO UR1
1/2"H&CW UP
TO MS1
1/2"CW DOWN
TO DF1
1/2"H&CW DOWN
TO LV1
1/2"H&CW DOWN
TO LV1
1/2"CW DOWN
TO HB
1/2"CW DOWN
TO HB
3/4"CW DOWN
TO WC1
1/2"H&CW DOWN
TO WB1
1/2"H&CW DOWN
TO SK2
3/4"CW UP
PS1
PS1
PS1
PS1
2"GAS UP
1/2"H&CW
FROM
BELOW
TO PS1
1/2"H&C
W FROM
BELOW
TO PS1
1/2"H&C
W FROM
BELOW
TO PS1
1/2"H&C
W FROM
BELOW
TO PS1
1/2"H&CW UP
TO LV1 ABOVE
1/2"H&CW UP
TO MS1 ABOVE
1/2"H&CW
DOWN TO SK1
1-1/4"H&CW UP 3/4"HWR UP&
DOWN,1-1/4"HW&
1-1/2"CW DOWN
2"GAS DOWN
1/2"H&CW
FROM BELOW
TO HS1
1/2"H&CW
FROM BELOW
TO HS1
1/2"H&CW
FROM BELOW
TO HS1
1/2"H&CW
FROM BELOW
TO HS1
1/2"H&CW
UP TO WB1
/4
C
W
/2
ºH W
1/2" CW
/4
C
W
G
1/2" 100ºHW
1/2" CW
1/2" CW
/4
C
W
/2
ºH W
3/4" CW1" CW
1" CW
1/2" 100ºHW
C W
3/4" 100ºHW
1" CW
C W
ºH
W
INSTALL TP1 TO SERVE
FLOOR DRAINS IN
1ST FLOOR RESTROOMS
1/2" HWR
/2
H
W R
/2
H
W R
3/4" 140ºHW1/2" 140ºHW
/2
ºH W
/2
ºH W
/4
ºH W
140° 3/4"HW UP
/2
ºH W
140° 3/4"HW DOWN
/2
H
W R
1/2" HWR
1/2" HWR
HS1
HS1
HS1
HS1
HS1
1/2"H&CW
FROM BELOW
TO HS1
3/4"H&CW UP
140° 3/4"HW UP
C W
1" CW
3/4" HW
HB
S.C. SPRINKLER CONTRACTOR
P.C. PLUMBING CONTRACTOR
HUB DRAINHD
PRV PRESSURE REDUCING VALVE
RD ROOF DRAIN
INVERT ELEVATIONI.E.
VTR VENT THRU ROOF
FLOOR DRAIN, F.D.
HOSE BIBB (INTERIOR)
BALANCING VALVE
CHECK VALVE
CONTROL/SHUT-OFF VALVE
G GAS PIPE, G
ST STORM PIPING, ST
HOT WATER RETURN PIPING, HWRHWR
HOT WATER PIPING, HWHW
COLD WATER PIPING, CWCW
V VENT PIPING, V
S SANITARY/WASTE PIPING, S, W
SYMBOL DESCRIPTION
PLUMBING LEGEND
CO CLEANOUT
DEMOLITION / NEW WORK LINETYPE LEGEND
= EXISTING WORK TO BE DEMOLISHED (PD SHEETS
ONLY)
= NEW WORK BY CONTRACTOR
= EXISTING WORK TO REMAIN (EX = EXISTING)
EX.???
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
ENGINEERING
DIVISION OF
AGENCY
AUTHORIZED AGENT
FOR INTENT ONLY
DIV. OF ENGR.
REVIEWED
ENGR. ACCT NO.
DRAWING NO.
DATE
A&E FILE NO.
CHECKED BY
SHEET DRAWN BY
RECORD DATE
DATEREVISIONS
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES & SUPPORT SERVICES
DIVISION OF ENGINEERING
FRANKFORT, KENTUCKY
WWW.KLHENGRS.COM
ENGINEERS, PSC
MECHANICAL/ELECTRICAL ENGINEERS
KOHRS LONNEMANN HEIL
LEXINGTON, KENTUCKY
COLUMBUS, OHIO
DAYTON, OHIO
NEW YORK, NEW YORK
1538 ALEXANDRIA PIKE, SUITE
11 FT. THOMAS, KENTUCKY
41075 800-354-9783 859-442-8050
859-442-8058 FAX
KLH PRO. NO.
11369.04
PROFESSIONAL SERVICES CLASSROOM CENTER
/1
/2
:3 :3
A
M
PL1.1
PLUMBING - NEW - 1ST FLOOR
C5N5-NC11-01
GATEWAY URBAN CAMPUS
438-440 Scott St., Covington, KY 41011
12/18/15
201114.02
FAC
KPO
KEYED NOTES
18 PEDICURE STATION, PS1, TO DRAIN INTO HUB DRAIN, HD1.
19 PROVIDE AND INSTALL VACUUM BREAKER CONNECTION ON THE
SUPPLY SIDE OF ALL HAIR WASH SINKS, HS1 AND HS2.
SCALE: 1/4" = 1'-0"PL1.1
1 PLUMBING SANITARY AND VENT- NEW - 1ST FLOOR
SCALE: 1/4" = 1'-0"PL1.1
2 PLUMBING SUPPLY - NEW - 1ST FLOOR
GENERAL PLUMBING NEW WORK NOTES
A. BOLD - DASHED LINES INDICATE NEW UNDERGROUND PLUMBING PIPING
AND FADED - DASHED LINES INDICATE EXISTING UNDERGROUND
PLUMBING WORK TO REMAIN.
B. WATER PIPING IN AREAS SUBJECT TO FREEZING TEMPERATURES WILL
NOT BE PERMITTED.
C. WHEREVER POSSIBLE, NEW PIPING AND RELOCATED PIPING SHALL BE
RUN CONCEALED. COORDINATE LOCATION OF ALL PIPING WITH HVAC
AND ELECTRIC SUBCONTRACTOR. COORDINATE CUTTING AND PATCHING
WITH GENERAL CONTRACTOR.
D. WHEREVER FIXTURES REQUIRING PLUMBING CONNECTIONS ARE
FURNISHED BY OWNER OR ARE RELOCATED, PLUMBING
SUBCONTRACTOR SHALL FURNISH AND INSTALL CARRIERS, "P" TRAP
AND STOPS.
E. ALL PIPE DROPS IN SALES AREA FROM ROOF TO LOW WALLS OR
EQUIPMENT SHOULD BE COORDINATED AND GROUP TOGETHER WITH
OTHER MECHANICAL PIPES.
F. NO PIPE ROUTING ALLOWED TO RUN THROUGH ELEVATOR EQUIPMENT
ROOMS.
G. DROP WATER DOWN IN WALL. ROUTE WATER THRU WALL TO SERVE
MULTIPLE FIXTURES ON COMMON WALL. FIXTURE SCHEDULE FOR
FIXTURE REQUIREMENTS.
H. ALL MEP TRADES, INCLUDING SPRINKLER MUST COORDINATE WITH EACH
OTHER PRIOR TO INSTALLATION.
I. PRIOR TO BID, CONTRACTOR SHALL VISIT THE JOB SITE AND FIELD
VERIFY THE EXISTING CONDITIONS. THE MECHANICAL CONTRACTOR
SHALL BE RESPONSIBLE FOR FIELD VERIFYING THE EXISTING STUB-INS,
TAPS, ETC. FOR PLUMBING SYSTEM FOR THE TENANT SPACE. THE
CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY OF ANY
DISCREPANCIES FOUND BETWEEN PLANS AND FIELD CONDITIONS IN
ORDER TO PREVENT UNKNOWN ADDITIONAL COSTS TO THE TENANT.
J. PROVIDE SHUTOFF VALVE(S) AT EACH FIXTURE.
K. ALL PLUMBING PIPING DROPS TO PLUMBING FIXTURES SHALL BE
INSTALLED IN WALL SPACE EXCEPT WHERE NOTED.
L. SUSPEND ALL HORIZONTAL WATER AND VENT PIPING AS HIGH AS
POSSIBLE ABOVE CEILING.
M. SAW CUT/CORE DRILL ALL SLAB PENETRATIONS. SEAL AROUND ALL
WALL, FLOOR AND CEILING PIPE PENETRATIONS WITH APPROVED
SEALANT MATERIAL AND ENSURE PENETRATIONS REMAIN FIRE
RESISTANT AND WATERTIGHT.
N. ALL EQUIPMENT, INSTALLATIONS AND MATERIALS SHALL COMPLY WITH
APPLICABLE LOCAL AND STATE CODES.
O. PROVIDE TRAP SEAL PRIMER ON ALL FLOOR DRAINS
File details come from the government source that posted it. Updated .