This is a Foundation Plan architectural drawing prepared by Brown & Kubican, PSC for the Commonwealth of Kentucky's Department for Facilities Management, Division of Engineering, for the Professional Services Classroom Center at 438-440 Scott Street, Covington, Kentucky 41011. The drawing, dated January 6, 2014 and approved December 3, 2015, details the foundation work required for the Gateway Urban Campus project, including new concrete slab-on-grade construction with wire fabric reinforcement over crushed stone and vapor retarder, reinforced concrete foundation slabs and footings for steel post support, and new CMU basement wall infill. The project specifications require the contractor to verify all dimensions in the field, coordinate with architectural drawings for existing wall demolition and new jamb end finish construction, infill existing blockouts with new brick masonry, install shallow spread footings (F3020) measuring 3'-0" x 2'-0" x 1'-4" with specified reinforcing patterns, and construct CMU walls tight to existing masonry structures while managing interference with existing low-elevation wood beams through selective removal and grout infill as needed.

The base bid shall cover all costs associated with the complete infill of existing blockouts, foundation preparation, and wall construction coordination with existing site conditions. The project involves extensive coordination between structural, architectural, and mechanical systems, including removal of abandoned ductwork, installation of wood blocking at 16-inch on-center spacing, provision of moisture barriers and flashing between masonry and wood construction, and adhesive embedding of dowels into existing masonry using specified epoxy systems such as Hilti HIT-HY 70. Simpson galvanized heavy angle connectors are specified at 16-inch on-center intervals, fastened with lag screws and supplemented with preservative-treated wood members to accommodate variations in existing floor joist elevations and ensure proper connection of the new structural elements to the existing building framework.

View the file

Other files

File Type Posted
66-67 - CT0.0.pdf PDF
51-49 - HV1.3.pdf PDF
8-13 - A1-1 - FIRST FLOOR DEMOLITION AND NEW WORK PLANS.pdf PDF
34-35 - PD1.1.pdf PDF
30-30 - A8-2 - Basement - FINISHES.pdf PDF
29-29 - A8-1 - ROOM FINISH PLANS (N-I-C- FURNITURE LAYOUT).pdf PDF
12-11 - S4-2 - FRAMING DETAILS.pdf PDF
15-8 - S2-5 - ROOF FRAMING PLAN.pdf PDF
73-19 - A3-0 - BUILDING ELEVATIONS.pdf PDF
49-51 - HV2.0.pdf PDF
72-72 - CT5.2.pdf PDF
67-69 - CT1.2.pdf PDF
62-63 - EP4.0.pdf PDF
3-6 - S2-3 - SECOND FLOOR FRAMING PLAN.pdf PDF
23-24 - A5-2 - MISCELLANEOUS DETAILS.pdf PDF
43-46 - HV1.0.pdf PDF
17-3 - S1-1 - GENERAL NOTES.pdf PDF
13-18 - A2-1 - 2ND 3RD FLR REFLECTED CLG PLANS.pdf PDF
28-31 - A8-3 - 1st FLOOR - FINISHES.pdf PDF
21-23 - A5-1 - MISCELLANEOUS STAIR DETAILS.pdf PDF
70-71 - CT5.1.pdf PDF
36-37 - PL1.1.pdf PDF
42-44 - FP1.1.pdf PDF
31-32 - A8-4 - 2nd Floor - FINISHES.pdf PDF
32-33 - A8-5 - 3rd Floor - FINISHES.pdf PDF
50-52 - HV2.1.pdf PDF
38-40 - PL1.4.pdf PDF
35-34 - PD1.0.pdf PDF
69-70 - CT4.1.pdf PDF
39-39 - PL1.3.pdf PDF
11-12 - A1-0 - BASEMENT DEMOLITION AND NEW WORK PLANS.pdf PDF
68-68 - CT1.0.pdf PDF
25-26 - A6-1 - ENLARGED PLANS AND INTERIOR ELEVATIONS.pdf PDF
63-64 - EL1.0.pdf PDF
19-10 - S4-1 - FRAMING DETAILS.pdf PDF
65-66 - EL2.0.pdf PDF
2-2 - A0-1 - CODE INFO AND WALL TYPES.pdf PDF
9-14 - A1-2 - SECOND FLOOR DEMOLITION AND NEW WORK PLANS.pdf PDF
76-Elevator Inspection 2026-03-25-12-13-48.pdf PDF
58-59 - EP1.3.pdf PDF
46-47 - HV1.1.pdf PDF
57-58 - EP1.2.pdf PDF
61-62 - EP3.0.pdf PDF
80-438 Scott Full Inspection Report (PDF).pdf PDF
7-5 - S2-2 - FIRST FLOOR FRAMING PLAN.pdf PDF
53-54 - HV3.1.pdf PDF
4-9 - S3-1 - TYPICAL DETAILS.pdf PDF
24-25 - A6-0 - ENLARGED PLANS AND INTERIOR ELEVATIONS.pdf PDF
48-50 - HV1.4.pdf PDF
20-21 - A4-1 - BUILDING SECTIONS.pdf PDF
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F.F.E. = (-10'-8"±)

EX S.O.G.

1'

7"

/8

82' - 9" ±

EX ELEVATOR SHAFT

FOUNDATION SLAB

1 1

EXISTING PERMANENT SHORING

TYP, U.N.O.

(-1 0'-

8"±

F30

C1C1C1C1

C1C1C1C1 1'

0"

1'

0"

6" 6' - 0" 6' - 0" 6' - 0"

EX MASONRY BEARING WALL

TYP

EX WOOD BEARING WALL

EX C.M.U.

ELEVATOR

SHAFT WALL

1/ 8"

(-1 0'-

8"±

F30

(-1 0'-

8"±

F30

(-1 0'-

8"±

F30

(-10'-8"±)

F3020

(-10'-8"±)

F3020

(-10'-8"±)

F3020

(-10'-8"±)

F3020

F.F.E. = (-10'-8"±)

EX S.O.G.

Ktyp

S3.1

EX STAIRS

UP

B

S2.1

--- - TYP

B

S2.1

--- - TYP

FOUNDATION LEGEND

1. ELEVATIONS SHOWN ARE TO THE TOP OF THE FOUNDATION AND

ARE REFERENCED FROM FINISHED FIRST FLOOR REFERENCE

ELEVATION = +0'-0".

2. DIMENSIONS ARE GIVEN TO FACE OF MASONRY WHERE APPLICABLE.

3. SEE DWG S1.1 FOR GENERAL NOTES AND COLUMN SCHEDULE.

4. SEE DWG S3.1 FOR TYPICAL DETAILS.

FOUNDATION PLAN NOTES

TAG NOTES

1 NEW 4" CONCRETE SLAB-ON-GRADE W/ 4x4-W2.1xW2.1 W.W.F. OVER

4" MIN CRUSHED STONE OVER 10 MIL VAPOR RETARDER.

CUT EXISTING SLAB AND PLACE NEW REINFORCED CONCRETE

FOUNDATION SLAB/FOOTING FOR STEEL POST SUPPORT. SEE

SPREAD FOOTING SCHEDULE THIS SHEET AND DET K/S3.1. TOP OF

FOOTING ELEVATION TO MATCH TOP OF EXISTING SLAB.

SEE ARCH DWGS FOR EXISTING WALL DEMOLITION EXTENTS AND

NEW JAMB END FINISH CONSTRUCTION.

INFILL OPENING (BEHIND COVERING PANEL) FOR FULL WALL

THICKNESS WITH NEW BRICK MASONRY. APPROXIMATE BLOCKOUT

DIMENSIONS = 4'-0"x3'-0" x WALL THICKNESS. BASE BID SHALL COVER

ALL COSTS TO INFILL FULL EXTENT OF EXISTING BLOCKOUT.

PROJECT

C1 = STEEL COLUMN. SEE COLUMN SCHEDULE

ON DWG S1.1.

F3020 = SHALLOW SPREAD FOOTING. SEE SCHEDULE THIS SHEET.

(-10'-8") = TOP OF FOOTING ELEVATION.

SPREAD FOOTING SCHEDULE

MARK SIZE

REINFORCING

E.W. BOTTOM U.N.O.

1,500 PSF

F3020 3'-0" x 2'-0" x 1'-4" (3) #5 LONG

(4) #5 SHORT*

*SEE DET K/S3.1 FOR SHORT BAR DOWELING REQUIREMENT.

CONTRACTOR TO VERIFY ALL

DIMENSIONS IN THE FIELD

= EXISTING LOAD BEARING C.M.U. WALL.

= EXISTING LOAD BEARING BRICK/STONE MASONRY WALL.

= NEW LEVELING COMPOUND & SEALER OVER PREPARED

EXISTING S.O.G. SEE SPECIFICATIONS (SECTION 033000)

FOR REQUIREMENTS.

= REQUIRED NEW CONCRETE SLAB-ON-GRADE INFILL.

INSTALL FULL DEPTH 2x WOOD BLOCKING

@ 16" O.C. FOR (3) JOIST SPACES FROM

INTERIOR FACE OF NEW C.M.U. WALL

(USE MULTIPLE 2x PIECES OR LVL

BLOCKING WHERE EXISTING JOIST DEPTH

EXCEEDS STANDARD 2x LUMBER

DIMENSIONS) (REMOVE ABANDONED

EXISTING DUCT WORK AS NEEDED FOR

BLOCKING INSTALLATION)

EXISTING WOOD FRAMING

TYP, U.N.O.

BRICK OR BLOCK INFILL

TIGHT TO EXISTING

CONSTRUCTION

EXISTING EXTERIOR SITE SLAB

(SIDEWALK)

FINISHED FIRST FLOOR

(SEE ARCH DWGS)

COORDINATE WATER-PROOFING

REQUIREMENTS W/ ARCHITECT

12" C.M.U.

GROUT SOLID

BREAK UP ALL SLAB ON EXTERIOR

SIDE OF NEW BASEMENT WALL

(AT THIS ELEVATION -

NOT SIDEWALKS ABOVE)

EXISTING BASEMENT S.O.G.

SAWCUT SLAB FOR FOOTING

INSTALLATION AND PROVIDE DOWELS

PER DET C/S3.1 @ 16" O.C.

EXISTING RECESSED WOOD

SHEATHING LAYER MAY OCCUR

SET EXTERIOR FACE OF NEW WALL 8"

FROM OUTSIDE FACE OF EXTERIOR

MOST WOOD FRAMING MEMBER

PROVIDE MOISTURE BARRIER / FLASHING

BTWN ALL MASONRY & WOOD CONSTRUCTION

(COORDINATE REQUIREMENTS W/ ARCHITECT)

WOOD FRAMING MEMBER AT FLOOR EDGE

MAY VARY IN SIZE AND ELEVATION

COORDINATE WALL CONSTRUCTION WITH

EXISTING CONDITIONS IN THE FIELD

2' - 0"

1'

0"

3"

2'

7" L

AP

DOWELS

MATCH VERT WALL REINF

SIZE & SPACING

#5@16" O.C.

SPLICE AS NEEDED

LAP LENGTH = 2'-7"

INTERIOR

(BASEMENT)

(3) #5 CONT

WHERE FOOTING TERMINATES

PROVIDE (3) #5x2'-6" DOWELS

ADHESIVE EMBED 6" INTO EXISTING

MASONRY/CONCRETE

#4 ERECTION BARS

@ 48" O.C. (MAX)

#5x2'-8" DOWEL @ 16" O.C.

ADHESIVE EMBED 8" INTO EXISTING

MASONRY (HILTI HIT-HY 70)

TYP WHERE WALL ABUTTS EXISTING

STRUCTURE (OFFSET IN C.M.U. AS NEED

TO TIE INTO EXISTING STRUCTURE)

B.B.

B.B.

B.B. @ WALL MID-HEIGHT

B.B. = 8" BOND BEAM

W/ (2) #5 CONT

NOTE 1.

SEE SHEET SR-4 FOR DETAIL NOTES.

NO WORK

INSIDE OF EX

MASONRY

VAULT

11 5/8"

8"

NOTE 2.

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

ENGINEERING

DIVISION OF

AGENCY

AUTHORIZED AGENT

FOR INTENT ONLY

DIV. OF ENGR.

REVIEWED

ENGR. ACCT. NO.

DRAWING NO.

DATE

A&E FILE NO.

CHECKED BY

SHEET DRAWN BY

RECORD DATE

DATEREVISIONS

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES MANAGEMENT

DIVISION OF ENGINEERING

FRANKFORT, KENTUCKYDK

BSM

470-C5N5-NC11-01

PROFESSIONAL SERVICES CLASSROOM CENTER

RECORD DRAWINGS DATE: 12/18/2015

BROWN & KUBICAN, PSC.

These record drawings have been prepared, in part, on the basis of information compiled and furnished by others. The Engineers has not verified the accuracy and/or completeness of this information and shall not be responsible for any errors or omissions that may be incorporated as a result of erroneous information provided by others.

/3

/2

:3 4:

A

M C

:\U se rs \b m cm ill an

\D es kt op

\L oc al F ile s\

\ 1

_0

G C

T C

A bo de

B K

L

O C

A L

B

S M

S

3.

rv t

S2.1

FOUNDATION PLAN

GATEWAY URBAN CAMPUS

438-440 Scott St., Covington, KY 41011

01/06/14

201114.02

1/4" = 1'-0"S2.1

A FOUNDATION PLAN

SECTION

1/2" = 1'-0"S2.1

B

SIMPSON GALVANIZED HEAVY ANGLE HL53 @ 16" O.C.

(POSITION TO ALIGN W/ WOOD BLOCKING) GROUT INTO

MASONRY WALL, FASTEN TO WOOD FRAMING W/

(2) 1/2"øx6" LAG SCREWS. PROVIDE A MINIMUM OF (3)

CONNECTORS PER WALL SEGEMENT REGARDLESS OF

SPACING. WHERE CONNECTORS ARE LESS THAN 16" O.C.

ADD WOOD BLOCKING BETWEEN ADJACENT FLOOR

JOISTS AT EACH CONNECTOR LOCATION.

INSTALL FLATWISE PRESERVATIVE TREATED WOOD 2x6

MEMBERS AS NEEDED TO BUILD DOWN WOOD FRAMING

TO MATCH ADJACENT BOTTOM OF ADJACENT FLOOR

JOIST ELEVATION. FASTEN EACH 2x6 LAYER TO WOOD FRAMING ABOVE W/ (2) 1/4"x3" WOOD SCREWS @ 16" O.C.

ON EXISTING MECHANICAL ROOM ROOM SIDE OF

BASEMENT BETWEEN FREESTANDING MASONRY PIER AND

ADJACENT WALL, THERE ARE TWO WOOD BEAMS AT A

LOW ELEVATION (SHOWN IN PHOTO BELOW). THE BEAMS,

MOST NOTABLY THE EXTERIOR MOST BEAM, WILL LIKELY

INTERFERE WITH THE NEW C.M.U. WALL LOCATION. IF

INTERFERANCE DOES OCCUR, CUT AND REMOVE LOW

WOOD BEAM/S, THEN INFILL POCKETS IN ADJACENT

MASONRY WITH NON-SHRINK GROUT. (IF EXISTING BEAMS

DO NOT CONFLICT WITH NEW WALL, LEAVE THEM IN

PLACE.)

CONSTRUCT NEW C.M.U. WALL TIGHT TO EXISTING

MASONRY WALLS, PIERS, SLAB ABOVE, AND FOOTING

BELOW AS REQUIRED TO CLOSEOUT THE BASEMENT

SPACE WITH THIS WALL BEING A TRUE BUILDING

PERIMETER WALL.

BASMENT WALL INFILL NOTES

1.

2.

3.

4.

File details come from the government source that posted it. Updated .