Plumbing System Design Plan - Gateway Urban Campus, Covington, Kentucky

This is a mechanical/plumbing system design drawing prepared by the Commonwealth of Kentucky Finance and Administration Cabinet, Department for Facilities & Support Services, Division of Engineering, in coordination with KLH Engineers, PSC. The document details new plumbing work required for the Gateway Urban Campus facility located at 438-440 Scott Street, Covington, Kentucky 41011. The plumbing design includes installation of new gas piping connections to HVAC equipment, new roof drain systems, hot water piping, cold water piping, vent piping, and sanitary/waste piping throughout the facility. The scope encompasses coordination of underground plumbing piping, fixture installations with carriers and P-traps, water supply drops to multiple fixtures on common walls, and trap seal primers on all floor drains. The drawing was prepared on December 18, 2015, with file number 201114.02 and professional services project number 11369.04, drawn at a scale of 1/4" = 1'-0".

The contractor is required to perform a site visit prior to bidding to verify existing conditions and field inspect existing stub-ins and taps for the plumbing system. All plumbing work must comply with applicable local and state codes, with piping installation coordinated among mechanical, electrical, and sprinkler trades. The plumbing contractor must furnish and install all carriers, P-traps, and shutoff valves at each fixture, with horizontal water and vent piping suspended as high as possible above ceilings. All wall, floor, and ceiling penetrations must be sealed with approved sealant material to maintain fire resistance and watertight integrity. The contractor is responsible for notifying the engineer immediately of any discrepancies between plans and field conditions to prevent unknown additional costs.

View the file

Other files

File Type Posted
66-67 - CT0.0.pdf PDF
51-49 - HV1.3.pdf PDF
8-13 - A1-1 - FIRST FLOOR DEMOLITION AND NEW WORK PLANS.pdf PDF
34-35 - PD1.1.pdf PDF
30-30 - A8-2 - Basement - FINISHES.pdf PDF
29-29 - A8-1 - ROOM FINISH PLANS (N-I-C- FURNITURE LAYOUT).pdf PDF
12-11 - S4-2 - FRAMING DETAILS.pdf PDF
15-8 - S2-5 - ROOF FRAMING PLAN.pdf PDF
73-19 - A3-0 - BUILDING ELEVATIONS.pdf PDF
49-51 - HV2.0.pdf PDF
72-72 - CT5.2.pdf PDF
67-69 - CT1.2.pdf PDF
62-63 - EP4.0.pdf PDF
3-6 - S2-3 - SECOND FLOOR FRAMING PLAN.pdf PDF
23-24 - A5-2 - MISCELLANEOUS DETAILS.pdf PDF
43-46 - HV1.0.pdf PDF
17-3 - S1-1 - GENERAL NOTES.pdf PDF
13-18 - A2-1 - 2ND 3RD FLR REFLECTED CLG PLANS.pdf PDF
28-31 - A8-3 - 1st FLOOR - FINISHES.pdf PDF
21-23 - A5-1 - MISCELLANEOUS STAIR DETAILS.pdf PDF
70-71 - CT5.1.pdf PDF
36-37 - PL1.1.pdf PDF
42-44 - FP1.1.pdf PDF
31-32 - A8-4 - 2nd Floor - FINISHES.pdf PDF
32-33 - A8-5 - 3rd Floor - FINISHES.pdf PDF
50-52 - HV2.1.pdf PDF
35-34 - PD1.0.pdf PDF
69-70 - CT4.1.pdf PDF
39-39 - PL1.3.pdf PDF
11-12 - A1-0 - BASEMENT DEMOLITION AND NEW WORK PLANS.pdf PDF
68-68 - CT1.0.pdf PDF
25-26 - A6-1 - ENLARGED PLANS AND INTERIOR ELEVATIONS.pdf PDF
63-64 - EL1.0.pdf PDF
19-10 - S4-1 - FRAMING DETAILS.pdf PDF
65-66 - EL2.0.pdf PDF
2-2 - A0-1 - CODE INFO AND WALL TYPES.pdf PDF
9-14 - A1-2 - SECOND FLOOR DEMOLITION AND NEW WORK PLANS.pdf PDF
76-Elevator Inspection 2026-03-25-12-13-48.pdf PDF
58-59 - EP1.3.pdf PDF
46-47 - HV1.1.pdf PDF
57-58 - EP1.2.pdf PDF
61-62 - EP3.0.pdf PDF
80-438 Scott Full Inspection Report (PDF).pdf PDF
7-5 - S2-2 - FIRST FLOOR FRAMING PLAN.pdf PDF
53-54 - HV3.1.pdf PDF
4-9 - S3-1 - TYPICAL DETAILS.pdf PDF
1-4 - S2-1 - FOUNDATION PLAN.pdf PDF
24-25 - A6-0 - ENLARGED PLANS AND INTERIOR ELEVATIONS.pdf PDF
48-50 - HV1.4.pdf PDF
20-21 - A4-1 - BUILDING SECTIONS.pdf PDF
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B C D EA G

F

RD1

G

2"GAS DOWN

4"VTR

4"VTR

CONNECT NEW

2"GAS TO HVAC

EQUIPMENT

ADDED RD1

HB

S.C. SPRINKLER CONTRACTOR

P.C. PLUMBING CONTRACTOR

HUB DRAINHD

PRV PRESSURE REDUCING VALVE

RD ROOF DRAIN

INVERT ELEVATIONI.E.

VTR VENT THRU ROOF

FLOOR DRAIN, F.D.

HOSE BIBB (INTERIOR)

BALANCING VALVE

CHECK VALVE

CONTROL/SHUT-OFF VALVE

G GAS PIPE, G

ST STORM PIPING, ST

HOT WATER RETURN PIPING, HWRHWR

HOT WATER PIPING, HWHW

COLD WATER PIPING, CWCW

V VENT PIPING, V

S SANITARY/WASTE PIPING, S, W

SYMBOL DESCRIPTION

PLUMBING LEGEND

CO CLEANOUT

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

ENGINEERING

DIVISION OF

AGENCY

AUTHORIZED AGENT

FOR INTENT ONLY

DIV. OF ENGR.

REVIEWED

ENGR. ACCT NO.

DRAWING NO.

DATE

A&E FILE NO.

CHECKED BY

SHEET DRAWN BY

RECORD DATE

DATEREVISIONS

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES & SUPPORT SERVICES

DIVISION OF ENGINEERING

FRANKFORT, KENTUCKY

WWW.KLHENGRS.COM

ENGINEERS, PSC

MECHANICAL/ELECTRICAL ENGINEERS

KOHRS LONNEMANN HEIL

LEXINGTON, KENTUCKY

COLUMBUS, OHIO

DAYTON, OHIO

NEW YORK, NEW YORK

1538 ALEXANDRIA PIKE, SUITE

11 FT. THOMAS, KENTUCKY

41075 800-354-9783 859-442-8050

859-442-8058 FAX

KLH PRO. NO.

11369.04

PROFESSIONAL SERVICES CLASSROOM CENTER

/1

/2

:3 :5

A

M

PL1.4

PLUMBING - NEW - ROOF

C5N5-NC11-01

GATEWAY URBAN CAMPUS

438-440 Scott St., Covington, KY 41011

12/18/15

201114.02

FAC

KPO

SCALE: 1/4" = 1'-0"PL1.4

1 PLUMBING - NEW - ROOF

GENERAL PLUMBING NEW WORK NOTES

A. BOLD - DASHED LINES INDICATE NEW UNDERGROUND PLUMBING PIPING

AND FADED - DASHED LINES INDICATE EXISTING UNDERGROUND

PLUMBING WORK TO REMAIN.

B. WATER PIPING IN AREAS SUBJECT TO FREEZING TEMPERATURES WILL

NOT BE PERMITTED.

C. WHEREVER POSSIBLE, NEW PIPING AND RELOCATED PIPING SHALL BE

RUN CONCEALED. COORDINATE LOCATION OF ALL PIPING WITH HVAC

AND ELECTRIC SUBCONTRACTOR. COORDINATE CUTTING AND PATCHING

WITH GENERAL CONTRACTOR.

D. WHEREVER FIXTURES REQUIRING PLUMBING CONNECTIONS ARE

FURNISHED BY OWNER OR ARE RELOCATED, PLUMBING

SUBCONTRACTOR SHALL FURNISH AND INSTALL CARRIERS, "P" TRAP

AND STOPS.

E. ALL PIPE DROPS IN SALES AREA FROM ROOF TO LOW WALLS OR

EQUIPMENT SHOULD BE COORDINATED AND GROUP TOGETHER WITH

OTHER MECHANICAL PIPES.

F. NO PIPE ROUTING ALLOWED TO RUN THROUGH ELEVATOR EQUIPMENT

ROOMS.

G. DROP WATER DOWN IN WALL. ROUTE WATER THRU WALL TO SERVE

MULTIPLE FIXTURES ON COMMON WALL. FIXTURE SCHEDULE FOR

FIXTURE REQUIREMENTS.

H. ALL MEP TRADES, INCLUDING SPRINKLER MUST COORDINATE WITH EACH

OTHER PRIOR TO INSTALLATION.

I. PRIOR TO BID, CONTRACTOR SHALL VISIT THE JOB SITE AND FIELD

VERIFY THE EXISTING CONDITIONS. THE MECHANICAL CONTRACTOR

SHALL BE RESPONSIBLE FOR FIELD VERIFYING THE EXISTING STUB-INS,

TAPS, ETC. FOR PLUMBING SYSTEM FOR THE TENANT SPACE. THE

CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY OF ANY

DISCREPANCIES FOUND BETWEEN PLANS AND FIELD CONDITIONS IN

ORDER TO PREVENT UNKNOWN ADDITIONAL COSTS TO THE TENANT.

J. PROVIDE SHUTOFF VALVE(S) AT EACH FIXTURE.

K. ALL PLUMBING PIPING DROPS TO PLUMBING FIXTURES SHALL BE

INSTALLED IN WALL SPACE EXCEPT WHERE NOTED.

L. SUSPEND ALL HORIZONTAL WATER AND VENT PIPING AS HIGH AS

POSSIBLE ABOVE CEILING.

M. SAW CUT/CORE DRILL ALL SLAB PENETRATIONS. SEAL AROUND ALL

WALL, FLOOR AND CEILING PIPE PENETRATIONS WITH APPROVED

SEALANT MATERIAL AND ENSURE PENETRATIONS REMAIN FIRE

RESISTANT AND WATERTIGHT.

N. ALL EQUIPMENT, INSTALLATIONS AND MATERIALS SHALL COMPLY WITH

APPLICABLE LOCAL AND STATE CODES.

O. PROVIDE TRAP SEAL PRIMER ON ALL FLOOR DRAINS