43-46 - HV1.0.pdf

PDF 241 KB Posted

Attached to
Surplus Real Property Sale For Economic Development; 438 Scott Boulevard
Solicitation number
RFP260305
Issued by
Hart County, Kentucky

About this file

This is an HVAC ductwork design and demolition plan prepared by the Commonwealth of Kentucky Finance and Administration Cabinet, Department for Facilities & Support Services, Division of Engineering, in conjunction with KLH Engineers, PSC for the Gateway Urban Campus located at 438-440 Scott Street, Covington, Kentucky. The project involves the installation of new HVAC ductwork in the basement of a classroom center facility, along with the demolition of existing HVAC ductwork and piping. The mechanical plan (Sheet HV1.0) depicts new air handling units (ACU-B-01, ACU-B-02, and ACU-B-03) with varying capacities ranging from 187 CFM to 770 CFM, connected via supply, return, and exhaust ductwork to ceiling diffusers and exhaust grilles throughout the basement level. The scope of work requires complete furnishing, installation, and placement into operation of all systems shown on the drawings in accordance with all state and local codes and ordinances. The plan was approved for program concept on December 18, 2015, and prepared under KLH Project Number 11369.04.

The contractor must provide all labor, material, and equipment necessary for installation and coordinate work with other trades regarding ceiling space requirements and roof-mounted equipment placement. Key requirements include installation of volume dampers at all ductwork branch takeoffs, turning vanes in 90-degree mitered elbows (except in acoustic-lined return ducts), flexible duct connections to ceiling diffusers with proper support, and compliance with manufacturer-recommended clearances for service and access. Existing HVAC units must be turned over to Gateway in workable condition prior to demolition of all existing ductwork and piping. No pricing information, set-asides, funding sources, or contract terms are specified in this design document.

View the file

Other files

File Type Posted
66-67 - CT0.0.pdf PDF
51-49 - HV1.3.pdf PDF
8-13 - A1-1 - FIRST FLOOR DEMOLITION AND NEW WORK PLANS.pdf PDF
34-35 - PD1.1.pdf PDF
30-30 - A8-2 - Basement - FINISHES.pdf PDF
29-29 - A8-1 - ROOM FINISH PLANS (N-I-C- FURNITURE LAYOUT).pdf PDF
12-11 - S4-2 - FRAMING DETAILS.pdf PDF
15-8 - S2-5 - ROOF FRAMING PLAN.pdf PDF
73-19 - A3-0 - BUILDING ELEVATIONS.pdf PDF
49-51 - HV2.0.pdf PDF
72-72 - CT5.2.pdf PDF
67-69 - CT1.2.pdf PDF
62-63 - EP4.0.pdf PDF
3-6 - S2-3 - SECOND FLOOR FRAMING PLAN.pdf PDF
23-24 - A5-2 - MISCELLANEOUS DETAILS.pdf PDF
17-3 - S1-1 - GENERAL NOTES.pdf PDF
13-18 - A2-1 - 2ND 3RD FLR REFLECTED CLG PLANS.pdf PDF
28-31 - A8-3 - 1st FLOOR - FINISHES.pdf PDF
21-23 - A5-1 - MISCELLANEOUS STAIR DETAILS.pdf PDF
70-71 - CT5.1.pdf PDF
36-37 - PL1.1.pdf PDF
42-44 - FP1.1.pdf PDF
31-32 - A8-4 - 2nd Floor - FINISHES.pdf PDF
32-33 - A8-5 - 3rd Floor - FINISHES.pdf PDF
50-52 - HV2.1.pdf PDF
38-40 - PL1.4.pdf PDF
35-34 - PD1.0.pdf PDF
69-70 - CT4.1.pdf PDF
39-39 - PL1.3.pdf PDF
11-12 - A1-0 - BASEMENT DEMOLITION AND NEW WORK PLANS.pdf PDF
68-68 - CT1.0.pdf PDF
25-26 - A6-1 - ENLARGED PLANS AND INTERIOR ELEVATIONS.pdf PDF
63-64 - EL1.0.pdf PDF
19-10 - S4-1 - FRAMING DETAILS.pdf PDF
65-66 - EL2.0.pdf PDF
2-2 - A0-1 - CODE INFO AND WALL TYPES.pdf PDF
9-14 - A1-2 - SECOND FLOOR DEMOLITION AND NEW WORK PLANS.pdf PDF
76-Elevator Inspection 2026-03-25-12-13-48.pdf PDF
58-59 - EP1.3.pdf PDF
46-47 - HV1.1.pdf PDF
57-58 - EP1.2.pdf PDF
61-62 - EP3.0.pdf PDF
80-438 Scott Full Inspection Report (PDF).pdf PDF
7-5 - S2-2 - FIRST FLOOR FRAMING PLAN.pdf PDF
53-54 - HV3.1.pdf PDF
4-9 - S3-1 - TYPICAL DETAILS.pdf PDF
1-4 - S2-1 - FOUNDATION PLAN.pdf PDF
24-25 - A6-0 - ENLARGED PLANS AND INTERIOR ELEVATIONS.pdf PDF
48-50 - HV1.4.pdf PDF
20-21 - A4-1 - BUILDING SECTIONS.pdf PDF
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T

T

B C D EA G

F

STUDENT LOUNGE

EXISTING STORAGE

EXISTING MECHANICAL

ROOM

EXISTING ELEVATOR

MACHINE ROOM

EXISTING STAIR

A

EXISTING ELEVATOR

E

ACU-B-03

ACU-B-02

ACU-B-02

12X10 SG

385 CFM

12X10 SG

330 CFM

12"ø 14"x12"

"x

ACU-B-01

16X12 RG

770 CFM

ACU-B-03

ACU-B-01

3/4"ø COND.

3/4"ø COND.

3/4"ø COND. 6x6 SR

12 CFM

6"ø

10"x12"

10"ø

8"ø8x8 SG

187 CFM

8"x14"

UP

CONDENSATE DN

TO FLOOR DRAIN

B C D EA G

F

SYMBOL DESCRIPTION

HVAC SYMBOLS LEGEND

SUCTION GAS, LIQUID, AND DISCHARGE GAS LINES

GAS AND LIQUID LINE

CEILING DIFFUSER

CD

EXHAUST GRILLE

EG

FLEXIBLE DUCTWORK CONNECTION

EXISTING WORK TO REMAIN

EXISTING WORK TO BE REMOVED

NEW WORK

FIRE DAMPER

FD

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

ENGINEERING

DIVISION OF

AGENCY

AUTHORIZED AGENT

FOR INTENT ONLY

DIV. OF ENGR.

REVIEWED

ENGR. ACCT NO.

DRAWING NO.

DATE

A&E FILE NO.

CHECKED BY

SHEET DRAWN BY

RECORD DATE

DATEREVISIONS

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES & SUPPORT SERVICES

DIVISION OF ENGINEERING

FRANKFORT, KENTUCKY

WWW.KLHENGRS.COM

ENGINEERS, PSC

MECHANICAL/ELECTRICAL ENGINEERS

KOHRS LONNEMANN HEIL

LEXINGTON, KENTUCKY

COLUMBUS, OHIO

DAYTON, OHIO

NEW YORK, NEW YORK

1538 ALEXANDRIA PIKE, SUITE

11 FT. THOMAS, KENTUCKY

41075 800-354-9783 859-442-8050

859-442-8058 FAX

KLH PRO. NO.

11369.04

PROFESSIONAL SERVICES CLASSROOM CENTER

/1

/2

:1 :5

P

M

HV1.0

HVAC DUCTWORK - NEW AND

DEMOLITION - BASEMENT

C5N5-NC11-01

GATEWAY URBAN CAMPUS

438-440 Scott St., Covington, KY 41011

12/18/15

201114.02

KTW

KTW

GENERAL NOTES

A. PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO

COMPLETELY FURNISH, INSTALL, AND PLACE INTO OPERATION, ALL

SYSTEMS SHOWN ON THE DRAWINGS AND DELINEATED IN THE

SPECIFICATIONS IN ACCORDANCE WITH ALL STATE AND LOCAL CODES

AND ORDINANCES. REPORT ANY KNOWN DISCREPANCIES TO THE

ARCHITECT/ENGINEER PRIOR TO INSTALLATION.

B. COORDINATE WORK AND SPACE REQUIREMENTS IN CEILING SPACES

WITH OTHER TRADES PRIOR TO INSTALLATION.

C. COORDINATE LOCATIONS AND ORIENTATION OF ROOF MOUNTED

EQUIPMENT WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS.

D. PROVIDE VOLUME DAMPERS AT ALL SUPPLY, RETURN, AND EXHAUST

DUCT BRANCH TAKE-OFFS.

E. PROVIDE TURNING VANES IN ALL 90 DEGREE MITERED ELBOWS. OMIT

TURNING VANES IN ACOUSTIC LINED RETURN DUCT ELBOWS.

F. PROVIDE FLEXIBLE DUCT ON INLET TO EACH CEILING DIFFUSER. CUT

FLEXIBLE DUCTS TO LENGTH NEEDED AND INSTALL WITHOUT KINKS OR

SHARP BENDS (BENDS WITH CENTERLINE RADIUS LESS THAN DUCT

DIAMETER).SUPPORT FLEXIBLE DUCTS WITH MINIMUM 1" WIDE METAL

STRAPS OR SADDLES.

G. SIZES OF ACOUSTIC LINED DUCTS ARE NET INSIDE DIMENSION.

INCREASE SHEET METAL SIZE ACCORDINGLY.

H. RUNOUTS TO CEILING DIFFUSERS ARE THE SAME SIZE AS THE DIFFUSER

NECK UNLESS NOTED OTHERWISE.

I. INSTALL ALL EQUIPMENT WITH CODE REQUIRED AND MANUFACTURER

RECOMMENDED MINIMUM CLEARANCES FOR SERVICE, ACCESS, AND

FIRE PROTECTION.

SCALE: 1/4" = 1'-0"HV1.0

HVAC DUCTWORK - NEW -

BASEMENT FLOOR

SCALE: 1/4" = 1'-0"HV1.0

HVAC - DEMOLITION -

BASEMENT FLOOR

KEYED NOTES

1 TURN EXISTING UNITS OVER TO GATEWAY IN WORKABLE CONDITION.

2 DEMOLISH ALL EXISTING HVAC DUCTWORK & PIPING WHETHER SHOWN OR NOT.

File details come from the government source that posted it. Updated .