About this file

This file is a set of building section drawings for the Gateway Urban Campus professional services classroom center located at 438-440 Scott Street in Covington, Kentucky, prepared by the Commonwealth of Kentucky Finance and Administration Cabinet, Department for Facilities Management, Division of Engineering. The document contains schematic architectural drawings approved for program concept only, dated September 25, 2014, with record drawings updated as of December 18, 2015. The building sections illustrate a multi-story structure with basement, first, second, and third floors, plus roof level, with detailed floor plans identifying various functional spaces including massage clinical labs, cosmetology salon, freshman clinic, dispensary, manicure/pedicure areas, corridors, and mechanical rooms distributed across the levels. The drawings reference structural components, existing conditions, and stairs located at multiple points throughout the building.

The technical sections of the drawings provide detailed specifications for roof construction, including SBS modified bitumen membranes, polyisocyanurate insulation, roof curbs, plumbing vent stacks, roof drains, and parapet cap details at the existing masonry wall interfaces. The construction specifications reference structural drawings for roof sheathing and wood joist framing, with materials including galvanized steel components, pre-finished aluminum parapet caps, exterior grade plywood substrates, and pressure-treated wood nailers. The document notes that building sections are for schematic representation only and includes a disclaimer that record drawings were prepared in part on the basis of information compiled by others, with no verification of accuracy or completeness provided by the architect/engineer.

View the file

Other files

File Type Posted
66-67 - CT0.0.pdf PDF
51-49 - HV1.3.pdf PDF
8-13 - A1-1 - FIRST FLOOR DEMOLITION AND NEW WORK PLANS.pdf PDF
34-35 - PD1.1.pdf PDF
30-30 - A8-2 - Basement - FINISHES.pdf PDF
29-29 - A8-1 - ROOM FINISH PLANS (N-I-C- FURNITURE LAYOUT).pdf PDF
12-11 - S4-2 - FRAMING DETAILS.pdf PDF
15-8 - S2-5 - ROOF FRAMING PLAN.pdf PDF
73-19 - A3-0 - BUILDING ELEVATIONS.pdf PDF
49-51 - HV2.0.pdf PDF
72-72 - CT5.2.pdf PDF
67-69 - CT1.2.pdf PDF
62-63 - EP4.0.pdf PDF
3-6 - S2-3 - SECOND FLOOR FRAMING PLAN.pdf PDF
23-24 - A5-2 - MISCELLANEOUS DETAILS.pdf PDF
43-46 - HV1.0.pdf PDF
17-3 - S1-1 - GENERAL NOTES.pdf PDF
13-18 - A2-1 - 2ND 3RD FLR REFLECTED CLG PLANS.pdf PDF
28-31 - A8-3 - 1st FLOOR - FINISHES.pdf PDF
21-23 - A5-1 - MISCELLANEOUS STAIR DETAILS.pdf PDF
70-71 - CT5.1.pdf PDF
36-37 - PL1.1.pdf PDF
42-44 - FP1.1.pdf PDF
31-32 - A8-4 - 2nd Floor - FINISHES.pdf PDF
32-33 - A8-5 - 3rd Floor - FINISHES.pdf PDF
50-52 - HV2.1.pdf PDF
38-40 - PL1.4.pdf PDF
35-34 - PD1.0.pdf PDF
69-70 - CT4.1.pdf PDF
39-39 - PL1.3.pdf PDF
11-12 - A1-0 - BASEMENT DEMOLITION AND NEW WORK PLANS.pdf PDF
68-68 - CT1.0.pdf PDF
25-26 - A6-1 - ENLARGED PLANS AND INTERIOR ELEVATIONS.pdf PDF
63-64 - EL1.0.pdf PDF
19-10 - S4-1 - FRAMING DETAILS.pdf PDF
65-66 - EL2.0.pdf PDF
2-2 - A0-1 - CODE INFO AND WALL TYPES.pdf PDF
9-14 - A1-2 - SECOND FLOOR DEMOLITION AND NEW WORK PLANS.pdf PDF
76-Elevator Inspection 2026-03-25-12-13-48.pdf PDF
58-59 - EP1.3.pdf PDF
46-47 - HV1.1.pdf PDF
57-58 - EP1.2.pdf PDF
61-62 - EP3.0.pdf PDF
80-438 Scott Full Inspection Report (PDF).pdf PDF
7-5 - S2-2 - FIRST FLOOR FRAMING PLAN.pdf PDF
53-54 - HV3.1.pdf PDF
4-9 - S3-1 - TYPICAL DETAILS.pdf PDF
1-4 - S2-1 - FOUNDATION PLAN.pdf PDF
24-25 - A6-0 - ENLARGED PLANS AND INTERIOR ELEVATIONS.pdf PDF
48-50 - HV1.4.pdf PDF
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A4.0

A4.0

B C D EA G

A4.1

A4.1

MASSAGE

CLINICAL LAB

OFFICE

302C

STAIR

D3

STAIR

D2

STAIR

D1

DISPENSARY

COSMETOLOGY

SALON

FRESHMAN CLINIC

DISPENSARY

EXISTING

MECHANICAL

ROOM

F

A5.0

ACOUSTICAL BATT INSULATION,

REFER TO NOTE # 8 ON SHEET A2.1

BUILDING SECTIONS ARE FOR

SCHEMATIC REPRESENTATION ONLY

A2.1

1ST FLOOR

0' - 0"

2ND FLOOR

16' - 2"

0 basement -10' - 8"

3RD FLOOR

29' - 5" roof 42' - 3"

1ST FLOOR REAR

0' - 10"

A4.1

A4.1

A4.0

A4.0

1 3

CLIENT MASSAGE

301A

CORRIDOR

ROOF ACCESS

302B

MASSAGE

CLINICAL LAB

EXISTING STAIR

C2

FRESHMAN CLINIC

MANICURE/PEDICURE

AREA

100D

CORRIDOR

100B

COSMETOLOGY

SALON

EXISTING

MECHANICAL

ROOM

EXISTING STORAGE

ACOUSTICAL BATT INSULATION

REFER TO NOTE # 8 ON SHEET A2.1

A2.1

TOP OF FLANGE CAPPED OR ROLLED

ONTO PIPE 1"

6" MINIMUM FLANGE SET IN MULTI-

PURPOSE MB FLASHING CEMENT

OVER FIELD PLIES- PRIME

FLANGE BEFORE STRIPPING

GRANULE SURFACE SBS

MODIFIED BITUMEN CAP

SHEET

BASE AND INTERPLY SHEETS AS

REQUIRED PER SPECIFICATIONS

FOR WARRANTY

SOFT METAL PIPE FLASHING

PLUMBING VENT STACK

MULTI-PURPOSE MB

FLASHING CEMENT

1/2" HIGH DENSITY POLYISO-

CYANURATE COVERBOARD

OVER 3" MIN. THICKNESS

POLYISOCYANURATE

CL

1' - 0" +/- 1' - 0" +/-

NEW ROOF SHEATHING

REFER TO STRUCTURAL

DRAWINGS

EXISTING ROOF WOOD

JOISTS AND SHEATHING

PT WOOD NAILER

REMOVABLE SHEET METAL

COUNTERFLASHING WITH

DRIP EDGE

MULTIPLE-PLY

MEMBRANE BASE

FLASHING

SBS MODIFIED BITUMEN

ROOF MEMBRANE

1/2" HIGH DENSITY

POLYISOCYANURATE

COVERBOARD OVER

3" MIN. THICK POLYISO-

CYANURATE

FRT WOOD

NAILERS

RAISED CURB

SEALING MATERIAL

CANT

NEW ROOF SHEATHING

REFER TO STRUCTURAL

DRAWINGS

EXISTING ROOF WOOD

JOIST AND SHEATHING

EXISTING ROOF WOOD

JOIST AND SHEATHING

NEW ROOF SHEATHING

REFER TO STRUCTURAL

DRAWINGS

NEW 2X12 WOOD JOIST

FRAMING, REFER TO

STRUCTURAL DWGS

STRAINER BASKET

COMPRESSION RING

30" SQUARE MINIMUM SOFT

METAL FLASHING (PRIME TOP

SURFACE BEFORE STRIPPING)

MULTI-PURPOSE FLASHING CEMENT

POLYISO TAPERED EDGE, 1" PER

FOOT MAX. SLOPE

INTERPLY LAYERS AS

REQUIRED BY

SPECIFICATIONS

SBS MODIFIED BITUMEN

GRANULE SURFACED

CAP SHEET

POLYISOCYANURATE - MINIMUM

THICKNESS 3"

NEW ROOF SHEATHING REFER

TO STRUCTURAL DRAWINGS

1/2" HIGH DENSITY

POLYISO-CYANURATE

COVERBOARD

EXTEND ALL PLIES,

FLASHING AND CAP

SHEET INTO

COMPRESSION

RING FOR A

MINIMUM OF 1/2"

PROVIDE STEEL

ANGLE AT DECK FOR

COMPRESSION RING

ATTACHMENT

CL

1' - 0" +/-

CENTER ROOF DRAIN

BETWEEN EXISTNG

ROOF JOISTS

EXISTING ROOF WOOD

JOISTS AND SHEATHING

WALL (F.V.)

EXISTING MASONRY

/2

/2

SLOPE TO ROOF

PRE-FINISHED

ALUMINUM PARAPET

CAP, WITH DRIP EDGE

CONT. SEALANT

EXTEND ROOFING

MEMBRANE UP WALL

ROOFING MEMBRANE

TO EXTEND OVER

BOTH FACES OF WALL

GALV. STEEL

ANCHOR PLATE

SECURED TO

WOOD NAILERS

CONT. SEALANT

3/4" EXT. GRADE

PLYWOOD SUBSTRATE

SECURE TO EXISTING

WALL

2x P.T. WOOD NAILERS

SECURED TO PLYWOOD

SUBSTRATE

C

COMMONWEALTH

T

R E

R

A

H C

I

N K E

UT

OF

B

3 87

I

R E G

No.

TS E

NT U

C E

YK T

N E R

D

ER

RB

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

ENGINEERING

DIVISION OF

AGENCY

AUTHORIZED AGENT

FOR INTENT ONLY

DIV. OF ENGR.

REVIEWED

ENGR. ACCT. NO.

DRAWING NO.

DATE

A&E FILE NO.

CHECKED BY

SHEET DRAWN BY

RECORD DATE

DATEREVISIONS

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES MANAGEMENT

DIVISION OF ENGINEERING

FRANKFORT, KENTUCKY

/5

/2

:5 :0

P

M C

U s e rs

\R H in s o n \D o c u m e n ts

\1

G

C T

C

A b o d e B u il d in g R e n o v a ti o n rh in s o n .r v t

A4.1

BUILDING SECTIONS

470-C5N5-NC11-01

GATEWAY URBAN CAMPUS

09/25/14

201114.02

BB

REH

PROFESSIONAL SERVICES CLASSROOM CENTER

438-440 Scott St., Covington, KY 41011

SCALE: 1/4" = 1'-0"A4.1

1 BUILDING SECTION 3

SCALE: 1/4" = 1'-0"A4.1

2 BUILDING SECTION 4

SCALE: 3" = 1'-0"A4.1

3 PLUMBING VENT - TYPICAL

SCALE: 3" = 1'-0"A4.1

4 ROOF CURB - TYPICAL

SCALE: 3" = 1'-0"A4.1

5 ROOF DRAIN

SCALE: 3" = 1'-0"A4.1

6 PARAPET CAP @ EXISTING WALL

AS-BUILT

12-18-15

RECORD DRAWINGS

THESE RECORD DRAWINGS HAVE BEEN PREPARED IN PART, ON THE BASIS OF INFORMATION COMPILED BY OTHERS. THE ARCHITECT/ENGINEER HAS NOT VERIFIED THE ACCURACY OR COMPLETENESS OF THE INFORMATION, AND SHALL NOT BE RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY BE

INCORPORATED AS A RESULT OF ERRONEOUS INFORMATION PROVIDED BY OTHERS.

File details come from the government source that posted it. Updated .