39-39 - PL1.3.pdf
PDF 391 KB Posted
- Solicitation number
- RFP260305
- Issued by
- Hart County, Kentucky
About this file
This is a plumbing design document prepared by the Commonwealth of Kentucky Finance and Administration Cabinet, Department for Facilities & Support Services, Division of Engineering, in collaboration with KLH Engineers, PSC for the Gateway Urban Campus project located at 438-440 Scott Street, Covington, Kentucky. The document presents detailed plumbing plans for the third floor of a classroom center facility, including sanitary and vent piping systems, water supply distribution, and fixture connections. The design accommodates multiple functional spaces including a clinical massage lab, client massage rooms, office, storage areas, restrooms, lobby, and HVAC mechanical rooms. The plumbing scope encompasses new underground piping installation, water piping routing through wall cavities to serve multiple fixtures, vent piping with roof penetrations, gas piping, and floor drain installations with trap seal primers. The plans indicate coordination requirements with HVAC and electrical subcontractors, with specifications for concealed piping runs where feasible and mandatory site verification of existing conditions prior to bidding.
The plumbing specifications establish that all piping work must comply with applicable local and state codes, with particular emphasis on water piping prohibitions in areas subject to freezing temperatures. The contractor is required to furnish and install carriers, P-traps, and shutoff valves at each fixture, seal all penetrations to maintain fire resistance and watertight integrity, and perform saw cutting and core drilling for all slab penetrations. Multi-trade coordination is mandated prior to installation, with the mechanical contractor bearing responsibility for field verification of existing stub-ins and taps, and immediate notification of any discrepancies to the engineer to prevent unknown additional costs. The design was approved for program concept purposes and dated December 18, 2015, with preparation completed on January 12, 2016.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B C D EA G
F
CORRIDOR
CLIENT MASSAGE
301D
CLIENT MASSAGE
301E
CLIENT MASSAGE
301C
CLIENT MASSAGE
301A
OFFICE
302C
STORAGE
MEN
STAIR
D3
EXISTING STAIR
C3
MASSAGE CLINICAL
LAB
WOMEN
LOBBY
CLIENT MASSAGE
301B
LINENS
301F
CORRIDOR
300A
CLOSET
HVAC
302A ROOF ACCESS
302B
V
V V
V V
V
V
V
V
V
V
V
FD1
FD1
4"STORM DOWN
4"STORM UP TO RD1
1-1/2"VENT DOWN
1-1/2"VENT
DOWN
1-1/2"VENT
DOWN
2"VENT
DOWN
3"VENT DOWN
3"VENT UP TO 4"VTR
1-1/2"VENT
DOWN
1-1/2"VENT DOWN
2"VENT DOWN
2"VENT DOWN
1-1/2"VENT DOWN
1-1/2"VENT DOWN
1-1/2"VENT DOWN
1-1/2"VENT DOWN
1-1/2"VENT DOWN
1-1/2"VENT DOWN
WC1
WC1LV1
LV1
UR1
DF1
SK3
MS1
SK3
SK3SK3
SK3
SK3
1-1/2"VENT
DOWN
WB1
1-1/2"VENT DOWN
4" UP TO
ADDED
ROOF
DRAIN
B C D EA G
F
CORRIDOR
CLIENT MASSAGE
301D
CLIENT MASSAGE
301E
CLIENT MASSAGE
301C
CLIENT MASSAGE
301A
OFFICE
302C
STORAGE
MEN
STAIR
D3
EXISTING STAIR
C3
MASSAGE CLINICAL
LAB
WOMEN
LOBBY
CLIENT MASSAGE
301B
LINENS
301F
CORRIDOR
300A
CLOSET
HVAC
302A ROOF ACCESS
302B
HB
HB
WC1
WC1
LV1
LV1
UR1
DF1
SK3
MS1
SK3
SK3SK3
SK3
SK3
3/4"CW FROM BELOW TO SERVE
FIXTURES ON THIS WALL
3/4"CW
TO UR1 FROM
BELOW
1/2"H&CW
TO LV1
FROM BELOW
1/2"H&CW
TO LV1 FROM
BELOW
1/2"H&CW
TO MS1
FROM
BELOW
1/2"H&CW TO SK3 FROM BELOW
1/2"H&CW TO SK3 FROM BELOW
1/2"H&CW TO SK3
FROM BELOW
1/2"H&CW TO SK3 FROM BELOW
1/2"H&CW TO SK3
FROM BELOW
1/2"CW TO DF1
FROM BELOW
1/2"H&CW TO
SK3 FROM
BELOW
2" G
2"GAS DOWN
2"GAS UP TO ROOF
INSTALL TP1 TO SERVE
FLOOR DRAINS IN
3RD FLOOR RESTROOMS
WB1
1/2"H&CW
TO WB1
FROM
BELOW
HB
S.C. SPRINKLER CONTRACTOR
P.C. PLUMBING CONTRACTOR
HUB DRAINHD
PRV PRESSURE REDUCING VALVE
RD ROOF DRAIN
INVERT ELEVATIONI.E.
VTR VENT THRU ROOF
FLOOR DRAIN, F.D.
HOSE BIBB (INTERIOR)
BALANCING VALVE
CHECK VALVE
CONTROL/SHUT-OFF VALVE
G GAS PIPE, G
ST STORM PIPING, ST
HOT WATER RETURN PIPING, HWRHWR
HOT WATER PIPING, HWHW
COLD WATER PIPING, CWCW
V VENT PIPING, V
S SANITARY/WASTE PIPING, S, W
SYMBOL DESCRIPTION
PLUMBING LEGEND
CO CLEANOUT
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
ENGINEERING
DIVISION OF
AGENCY
AUTHORIZED AGENT
FOR INTENT ONLY
DIV. OF ENGR.
REVIEWED
ENGR. ACCT NO.
DRAWING NO.
DATE
A&E FILE NO.
CHECKED BY
SHEET DRAWN BY
RECORD DATE
DATEREVISIONS
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES & SUPPORT SERVICES
DIVISION OF ENGINEERING
FRANKFORT, KENTUCKY
WWW.KLHENGRS.COM
ENGINEERS, PSC
MECHANICAL/ELECTRICAL ENGINEERS
KOHRS LONNEMANN HEIL
LEXINGTON, KENTUCKY
COLUMBUS, OHIO
DAYTON, OHIO
NEW YORK, NEW YORK
1538 ALEXANDRIA PIKE, SUITE
11 FT. THOMAS, KENTUCKY
41075 800-354-9783 859-442-8050
859-442-8058 FAX
KLH PRO. NO.
11369.04
PROFESSIONAL SERVICES CLASSROOM CENTER
/1
/2
:3 :5
A
M
PL1.3
PLUMBING - NEW - 3RD FLOOR
C5N5-NC11-01
GATEWAY URBAN CAMPUS
438-440 Scott St., Covington, KY 41011
12/18/15
201114.02
FAC
KPO
SCALE: 1/4" = 1'-0"PL1.3
1 PLUMBING SANITARY AND VENT- NEW - 3RD FLOOR
SCALE: 1/4" = 1'-0"PL1.3
2 PLUMBING SUPPLY - NEW - 3RD FLOOR
GENERAL PLUMBING NEW WORK NOTES
A. BOLD - DASHED LINES INDICATE NEW UNDERGROUND PLUMBING PIPING
AND FADED - DASHED LINES INDICATE EXISTING UNDERGROUND
PLUMBING WORK TO REMAIN.
B. WATER PIPING IN AREAS SUBJECT TO FREEZING TEMPERATURES WILL
NOT BE PERMITTED.
C. WHEREVER POSSIBLE, NEW PIPING AND RELOCATED PIPING SHALL BE
RUN CONCEALED. COORDINATE LOCATION OF ALL PIPING WITH HVAC
AND ELECTRIC SUBCONTRACTOR. COORDINATE CUTTING AND PATCHING
WITH GENERAL CONTRACTOR.
D. WHEREVER FIXTURES REQUIRING PLUMBING CONNECTIONS ARE
FURNISHED BY OWNER OR ARE RELOCATED, PLUMBING
SUBCONTRACTOR SHALL FURNISH AND INSTALL CARRIERS, "P" TRAP
AND STOPS.
E. ALL PIPE DROPS IN SALES AREA FROM ROOF TO LOW WALLS OR
EQUIPMENT SHOULD BE COORDINATED AND GROUP TOGETHER WITH
OTHER MECHANICAL PIPES.
F. NO PIPE ROUTING ALLOWED TO RUN THROUGH ELEVATOR EQUIPMENT
ROOMS.
G. DROP WATER DOWN IN WALL. ROUTE WATER THRU WALL TO SERVE
MULTIPLE FIXTURES ON COMMON WALL. FIXTURE SCHEDULE FOR
FIXTURE REQUIREMENTS.
H. ALL MEP TRADES, INCLUDING SPRINKLER MUST COORDINATE WITH EACH
OTHER PRIOR TO INSTALLATION.
I. PRIOR TO BID, CONTRACTOR SHALL VISIT THE JOB SITE AND FIELD
VERIFY THE EXISTING CONDITIONS. THE MECHANICAL CONTRACTOR
SHALL BE RESPONSIBLE FOR FIELD VERIFYING THE EXISTING STUB-INS,
TAPS, ETC. FOR PLUMBING SYSTEM FOR THE TENANT SPACE. THE
CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY OF ANY
DISCREPANCIES FOUND BETWEEN PLANS AND FIELD CONDITIONS IN
ORDER TO PREVENT UNKNOWN ADDITIONAL COSTS TO THE TENANT.
J. PROVIDE SHUTOFF VALVE(S) AT EACH FIXTURE.
K. ALL PLUMBING PIPING DROPS TO PLUMBING FIXTURES SHALL BE
INSTALLED IN WALL SPACE EXCEPT WHERE NOTED.
L. SUSPEND ALL HORIZONTAL WATER AND VENT PIPING AS HIGH AS
POSSIBLE ABOVE CEILING.
M. SAW CUT/CORE DRILL ALL SLAB PENETRATIONS. SEAL AROUND ALL
WALL, FLOOR AND CEILING PIPE PENETRATIONS WITH APPROVED
SEALANT MATERIAL AND ENSURE PENETRATIONS REMAIN FIRE
RESISTANT AND WATERTIGHT.
N. ALL EQUIPMENT, INSTALLATIONS AND MATERIALS SHALL COMPLY WITH
APPLICABLE LOCAL AND STATE CODES.
O. PROVIDE TRAP SEAL PRIMER ON ALL FLOOR DRAINS
File details come from the government source that posted it. Updated .