46-47 - HV1.1.pdf

PDF 386 KB Posted

Attached to
Surplus Real Property Sale For Economic Development; 438 Scott Boulevard
Solicitation number
RFP260305
Issued by
Hart County, Kentucky

About this file

This is an HVAC ductwork design and demolition plan prepared by the Division of Engineering within the Kentucky Finance and Administration Cabinet, Department for Facilities & Support Services, in collaboration with KLH Engineers, PSC for the Gateway Urban Campus project located at 438-440 Scott Street, Covington, Kentucky. The mechanical design drawing (HV1.1) details the installation of new HVAC ductwork, ceiling diffusers, exhaust grilles, and related components on the first floor of a classroom center facility that includes spaces designated for a dispensary, cosmetology salon, reception area, waiting area, manicure/pedicure area, and custodial functions. The plan specifies the complete furnishing, installation, and placement into operation of all systems shown on the drawings in accordance with all state and local codes and ordinances, with coordination requirements among trades for ceiling space utilization and roof-mounted equipment placement.

The design establishes specific technical requirements including the provision of volume dampers at all supply, return, and exhaust duct branch take-offs; turning vanes in 90-degree mitered elbows; flexible duct connections on inlet to each ceiling diffuser; and support systems using minimum 1-inch wide metal straps or saddles. Two air conditioning units (ACU-1-01 and ACU-1-02) serve the facility with various ductwork sizes and CFM capacities ranging from 30 to 250 CFM for different zones. The drawing includes both new work to be installed and existing HVAC ductwork and piping to be demolished, with existing floor registers designated to remain. All work must be performed with code-required and manufacturer-recommended minimum clearances for service, access, and fire protection.

View the file

Other files

File Type Posted
66-67 - CT0.0.pdf PDF
51-49 - HV1.3.pdf PDF
8-13 - A1-1 - FIRST FLOOR DEMOLITION AND NEW WORK PLANS.pdf PDF
34-35 - PD1.1.pdf PDF
30-30 - A8-2 - Basement - FINISHES.pdf PDF
29-29 - A8-1 - ROOM FINISH PLANS (N-I-C- FURNITURE LAYOUT).pdf PDF
12-11 - S4-2 - FRAMING DETAILS.pdf PDF
15-8 - S2-5 - ROOF FRAMING PLAN.pdf PDF
73-19 - A3-0 - BUILDING ELEVATIONS.pdf PDF
49-51 - HV2.0.pdf PDF
72-72 - CT5.2.pdf PDF
67-69 - CT1.2.pdf PDF
62-63 - EP4.0.pdf PDF
3-6 - S2-3 - SECOND FLOOR FRAMING PLAN.pdf PDF
23-24 - A5-2 - MISCELLANEOUS DETAILS.pdf PDF
43-46 - HV1.0.pdf PDF
17-3 - S1-1 - GENERAL NOTES.pdf PDF
13-18 - A2-1 - 2ND 3RD FLR REFLECTED CLG PLANS.pdf PDF
28-31 - A8-3 - 1st FLOOR - FINISHES.pdf PDF
21-23 - A5-1 - MISCELLANEOUS STAIR DETAILS.pdf PDF
70-71 - CT5.1.pdf PDF
36-37 - PL1.1.pdf PDF
42-44 - FP1.1.pdf PDF
31-32 - A8-4 - 2nd Floor - FINISHES.pdf PDF
32-33 - A8-5 - 3rd Floor - FINISHES.pdf PDF
50-52 - HV2.1.pdf PDF
38-40 - PL1.4.pdf PDF
35-34 - PD1.0.pdf PDF
69-70 - CT4.1.pdf PDF
39-39 - PL1.3.pdf PDF
11-12 - A1-0 - BASEMENT DEMOLITION AND NEW WORK PLANS.pdf PDF
68-68 - CT1.0.pdf PDF
25-26 - A6-1 - ENLARGED PLANS AND INTERIOR ELEVATIONS.pdf PDF
63-64 - EL1.0.pdf PDF
19-10 - S4-1 - FRAMING DETAILS.pdf PDF
65-66 - EL2.0.pdf PDF
2-2 - A0-1 - CODE INFO AND WALL TYPES.pdf PDF
9-14 - A1-2 - SECOND FLOOR DEMOLITION AND NEW WORK PLANS.pdf PDF
76-Elevator Inspection 2026-03-25-12-13-48.pdf PDF
58-59 - EP1.3.pdf PDF
57-58 - EP1.2.pdf PDF
61-62 - EP3.0.pdf PDF
80-438 Scott Full Inspection Report (PDF).pdf PDF
7-5 - S2-2 - FIRST FLOOR FRAMING PLAN.pdf PDF
53-54 - HV3.1.pdf PDF
4-9 - S3-1 - TYPICAL DETAILS.pdf PDF
1-4 - S2-1 - FOUNDATION PLAN.pdf PDF
24-25 - A6-0 - ENLARGED PLANS AND INTERIOR ELEVATIONS.pdf PDF
48-50 - HV1.4.pdf PDF
20-21 - A4-1 - BUILDING SECTIONS.pdf PDF
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T

T

T

B C D EA G

F

20"ø

20"ø

20"ø

20"ø

6"ø

6"ø

6"ø

HVAC

DISPENSARY

CORRIDOR

100B

COSMETOLOGY SALON

WAITING AREA

RECEPTION

100A

CONSULTATION

100C

MANICURE/PEDICURE

AREA

100D

EXISTING STAIR

B

STAIR

D1

MEN

WOMEN

STORAGE

CORRIDOR

100E

ACU-1-01

ACU-1-02

CD-6"Ø

30 CFM

CD-6"Ø

80 CFM

CD-6"Ø

30 CFM

CD-6"Ø

40 CFM

24x24 ER

160 CFM

24x24 ER

80 CFM

4"ø

8"ø

CUSTODIAL

1 1/4"ø

COND.

1"ø COND.

1"ø COND.

6"ø

EF-1

8x4

EXHAUST

LOUVER

ECH-1

ACU-1-01

ACU-1-02

P-1

P-2

CD-6"Ø

60 CFM

"x

"x

8x8 SG

250 CFM

8x8 SG

250 CFM

8x8 SG

250 CFM

8x8 SG

250 CFM

8x8 SG

250 CFM

8x8 SG

250 CFM

8x8 SG

240 CFM

8x8 SG

180 CFM

8x8 SG

180 CFM

8x8 SG

180 CFM

8x8 SG

180 CFM

8x8 SG

180 CFM

8x8 SG

180 CFM

8x8 SG

180 CFM

8x8 SG

180 CFM

8x8 SG

180 CFM

8"x14"

FD

8x4 DRYER

VENT

24x24 RG

80 CFM

8"x6"

8x8 EG

50 CFM

8"ø

10"x8"

6"ø

6"ø

24"x14"

24"x14"

6"ø

1-1/4" COND. DN TO

MOP SINK8"x14" DN

16"x16"

16"x16"

UP

UP

B C D EA G

F

4 4 4 4

4 44

EX-CU EX-CU

SYMBOL DESCRIPTION

HVAC SYMBOLS LEGEND

SUCTION GAS, LIQUID, AND DISCHARGE GAS LINES

GAS AND LIQUID LINE

CEILING DIFFUSER

CD

EXHAUST GRILLE

EG

FLEXIBLE DUCTWORK CONNECTION

EXISTING WORK TO REMAIN

EXISTING WORK TO BE REMOVED

NEW WORK

FIRE DAMPER

FD

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

ENGINEERING

DIVISION OF

AGENCY

AUTHORIZED AGENT

FOR INTENT ONLY

DIV. OF ENGR.

REVIEWED

ENGR. ACCT NO.

DRAWING NO.

DATE

A&E FILE NO.

CHECKED BY

SHEET DRAWN BY

RECORD DATE

DATEREVISIONS

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES & SUPPORT SERVICES

DIVISION OF ENGINEERING

FRANKFORT, KENTUCKY

WWW.KLHENGRS.COM

ENGINEERS, PSC

MECHANICAL/ELECTRICAL ENGINEERS

KOHRS LONNEMANN HEIL

LEXINGTON, KENTUCKY

COLUMBUS, OHIO

DAYTON, OHIO

NEW YORK, NEW YORK

1538 ALEXANDRIA PIKE, SUITE

11 FT. THOMAS, KENTUCKY

41075 800-354-9783 859-442-8050

859-442-8058 FAX

KLH PRO. NO.

11369.04

PROFESSIONAL SERVICES CLASSROOM CENTER

/1

/2

:2 :0

P

M

HV1.1

HVAC DUCTWORK - NEW AND

DEMOLITION - 1ST FLOOR

C5N5-NC11-01

GATEWAY URBAN CAMPUS

438-440 Scott St., Covington, KY 41011

12/18/15

201114.02

KTW

KTW

GENERAL NOTES

A. PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO

COMPLETELY FURNISH, INSTALL, AND PLACE INTO OPERATION, ALL

SYSTEMS SHOWN ON THE DRAWINGS AND DELINEATED IN THE

SPECIFICATIONS IN ACCORDANCE WITH ALL STATE AND LOCAL CODES

AND ORDINANCES. REPORT ANY KNOWN DISCREPANCIES TO THE

ARCHITECT/ENGINEER PRIOR TO INSTALLATION.

B. COORDINATE WORK AND SPACE REQUIREMENTS IN CEILING SPACES

WITH OTHER TRADES PRIOR TO INSTALLATION.

C. COORDINATE LOCATIONS AND ORIENTATION OF ROOF MOUNTED

EQUIPMENT WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS.

D. PROVIDE VOLUME DAMPERS AT ALL SUPPLY, RETURN, AND EXHAUST

DUCT BRANCH TAKE-OFFS.

E. PROVIDE TURNING VANES IN ALL 90 DEGREE MITERED ELBOWS. OMIT

TURNING VANES IN ACOUSTIC LINED RETURN DUCT ELBOWS.

F. PROVIDE FLEXIBLE DUCT ON INLET TO EACH CEILING DIFFUSER. CUT

FLEXIBLE DUCTS TO LENGTH NEEDED AND INSTALL WITHOUT KINKS OR

SHARP BENDS (BENDS WITH CENTERLINE RADIUS LESS THAN DUCT

DIAMETER).SUPPORT FLEXIBLE DUCTS WITH MINIMUM 1" WIDE METAL

STRAPS OR SADDLES.

G. SIZES OF ACOUSTIC LINED DUCTS ARE NET INSIDE DIMENSION.

INCREASE SHEET METAL SIZE ACCORDINGLY.

H. RUNOUTS TO CEILING DIFFUSERS ARE THE SAME SIZE AS THE DIFFUSER

NECK UNLESS NOTED OTHERWISE.

I. INSTALL ALL EQUIPMENT WITH CODE REQUIRED AND MANUFACTURER

RECOMMENDED MINIMUM CLEARANCES FOR SERVICE, ACCESS, AND

FIRE PROTECTION.

SCALE: 1/4" = 1'-0"HV1.1

HVAC DUCTWORK - NEW - 1ST

FLOOR

SCALE: 1/4" = 1'-0"HV1.1

HVAC - DEMOLITION - 1ST

FLOOR

KEYED NOTES

2 DEMOLISH ALL EXISTING HVAC DUCTWORK & PIPING WHETHER SHOWN OR NOT.

4 EXISTING FLOOR REGISTER TO REMAIN.

File details come from the government source that posted it. Updated .