About this file

This is a plumbing design plan prepared by the Commonwealth of Kentucky Finance and Administration Cabinet, Department for Facilities & Support Services, Division of Engineering, in collaboration with KLH Engineers, PSC for the Gateway Urban Campus located at 438-440 Scott Street in Covington, Kentucky. The document provides detailed mechanical and plumbing specifications for new second-floor installations within the classroom center, including sanitary and vent piping systems and water supply systems. The plan outlines pipe routing, sizing, fixture connections, and material requirements for multiple spaces including a classroom, facial/couple massage room, dispensary, offices, restrooms, and corridor areas, with comprehensive annotations indicating pipe diameters, flow directions, and connection points to fixtures such as sinks, lavatories, floor drains, and hose bibbs throughout the facility.

The plumbing specifications emphasize coordination requirements among all mechanical, electrical, and plumbing trades prior to installation, with mandatory pre-bid site visits and field verification of existing conditions and stub-ins. The contractor is required to notify the engineer immediately of any discrepancies between the plans and field conditions to prevent unknown costs. Key design requirements include concealed routing of piping where possible, proper coordination with HVAC and electrical subcontractors, installation of shutoff valves at each fixture, use of trap seal primers on floor drains, and compliance with applicable local and state codes. The document notes that water piping in areas subject to freezing temperatures is not permitted, all slab penetrations must be saw cut or core drilled, and all wall, floor, and ceiling pipe penetrations must be sealed with approved sealant materials to maintain fire resistance and watertight integrity.

View the file

Other files

File Type Posted
66-67 - CT0.0.pdf PDF
51-49 - HV1.3.pdf PDF
8-13 - A1-1 - FIRST FLOOR DEMOLITION AND NEW WORK PLANS.pdf PDF
34-35 - PD1.1.pdf PDF
30-30 - A8-2 - Basement - FINISHES.pdf PDF
29-29 - A8-1 - ROOM FINISH PLANS (N-I-C- FURNITURE LAYOUT).pdf PDF
12-11 - S4-2 - FRAMING DETAILS.pdf PDF
15-8 - S2-5 - ROOF FRAMING PLAN.pdf PDF
73-19 - A3-0 - BUILDING ELEVATIONS.pdf PDF
49-51 - HV2.0.pdf PDF
72-72 - CT5.2.pdf PDF
67-69 - CT1.2.pdf PDF
62-63 - EP4.0.pdf PDF
3-6 - S2-3 - SECOND FLOOR FRAMING PLAN.pdf PDF
23-24 - A5-2 - MISCELLANEOUS DETAILS.pdf PDF
43-46 - HV1.0.pdf PDF
17-3 - S1-1 - GENERAL NOTES.pdf PDF
13-18 - A2-1 - 2ND 3RD FLR REFLECTED CLG PLANS.pdf PDF
28-31 - A8-3 - 1st FLOOR - FINISHES.pdf PDF
21-23 - A5-1 - MISCELLANEOUS STAIR DETAILS.pdf PDF
70-71 - CT5.1.pdf PDF
36-37 - PL1.1.pdf PDF
42-44 - FP1.1.pdf PDF
31-32 - A8-4 - 2nd Floor - FINISHES.pdf PDF
32-33 - A8-5 - 3rd Floor - FINISHES.pdf PDF
50-52 - HV2.1.pdf PDF
38-40 - PL1.4.pdf PDF
35-34 - PD1.0.pdf PDF
69-70 - CT4.1.pdf PDF
39-39 - PL1.3.pdf PDF
11-12 - A1-0 - BASEMENT DEMOLITION AND NEW WORK PLANS.pdf PDF
68-68 - CT1.0.pdf PDF
25-26 - A6-1 - ENLARGED PLANS AND INTERIOR ELEVATIONS.pdf PDF
63-64 - EL1.0.pdf PDF
19-10 - S4-1 - FRAMING DETAILS.pdf PDF
65-66 - EL2.0.pdf PDF
2-2 - A0-1 - CODE INFO AND WALL TYPES.pdf PDF
9-14 - A1-2 - SECOND FLOOR DEMOLITION AND NEW WORK PLANS.pdf PDF
76-Elevator Inspection 2026-03-25-12-13-48.pdf PDF
58-59 - EP1.3.pdf PDF
46-47 - HV1.1.pdf PDF
57-58 - EP1.2.pdf PDF
61-62 - EP3.0.pdf PDF
80-438 Scott Full Inspection Report (PDF).pdf PDF
7-5 - S2-2 - FIRST FLOOR FRAMING PLAN.pdf PDF
53-54 - HV3.1.pdf PDF
4-9 - S3-1 - TYPICAL DETAILS.pdf PDF
1-4 - S2-1 - FOUNDATION PLAN.pdf PDF
24-25 - A6-0 - ENLARGED PLANS AND INTERIOR ELEVATIONS.pdf PDF
48-50 - HV1.4.pdf PDF
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B C D EA G

F

CLASSROOM

S

S S

S

S

FACIAL / COUPLE

MASSAGE

STAIR

D2

DISPENSARY

MEN

WOMEN

CUST.

206A

EXISTING STAIR

C2

OFFICE 2

OFFICE 1

CORRIDOR

200A

CLOSET

EXISTING STAIR

B2

V

V

S

S

S

S

S

V

V

FD1

FD1

SK1

WB1

DF1

UR1

WC1

LV1

SK3

WC1

LV1

MS1

HS2

2"VENT DOWN

2"VENT UP

1-1/2"VENT DOWN

1-1/2"VENT DOWN

1-1/2"VENT DOWN FOR DF1

ON THIS FLOOR

TO DF1 ABOVE

2"VENT DOWN

2"VENT UP

4"STORM UP

& DOWN

1-1/2"VENT DOWN

TO LV1 ABOVE

TO FD1 ABOVE

1-1/2"VENT

DOWN

TO UR1

ABOVE

4"SAN. TO WC1 ABOVE

2"VENT DOWN

3"SAN. TO

FD1 ABOVE

1-1/2"VENT DOWN

2"VENT DOWN

1-1/2"VENT DOWN

4"SAN DOWN

3"VENT DOWN

3"VENT UP

TO LV1 ABOVE

3"SAN. TO MS1

ABOVE

TO SK3 ABOVE

1-1/2"SAN. TO

SK3 ABOVE

1-1/2"SAN. TO

SK3 ABOVE

1-1/2" SAN.

TO SK3

ABOVE

1-1/2"SAN. TO

SK3 ABOVE

1-1/2"SAN. TO

SK3 ABOVE

CO

CO

CO

CO

CO

CO

CO

1-1/2"VENT DOWN

2"SAN. TO WB1

ABOVE

HS2

HS2

HS2

1-1/2"VENT DOWN

1-1/2"VENT DOWN

1-1/2"VENT DOWN

1-1/2"VENT DOWN

RUN VENT

PIPING AS LOW

AS POSSIBLE

IN WALL

V V

V V

B C D EA G

F

CLASSROOM

1/2" 100ºHW

1/2" CW

3/4" 100ºHW

3/4" CW

3/4" 100ºHW

3/4" CW

C W

ºH

W

1 1/4" 100ºHW

1 1/4" CW

1/2" CW

1/2" 100ºHW

FACIAL / COUPLE

MASSAGE

STAIR

D2

DISPENSARY

MEN

WOMEN

CUST.

206AEXISTING STAIR

C2

OFFICE 2

OFFICE 1

CORRIDOR

200A

CLOSET

EXISTING STAIR

B2

HB

HB

1/2"H&CW TO SK3 ABOVE

WB1

SK1

DF1

UR1

WC1

LV1

SK3

WC1

LV1

MS1

HS2

HS2

HS2

HS2

1/2"H&CW

DOWN TO SK1

1/2"H&CW

DOWN

TO WB1

1/2"CW DOWN

TO DF1 & 1/2"CW

UP TO DF1 ABOVE

3/4"CW DOWN

TO UR1

3/4"CW UP TO SERVE

FIXTURES ABOVE.

3/4"CW DOWN TO SERVE

FIXTURES ON WALL.

1/2"HW DOWN

TO SK3

1/2"H&CW

TO MS1 ABOVE

1/2"H&CW

TO LV1 ABOVE

1/2"H&CW

TO LV1 ABOVE,

1/2"H&CW

DOWN

TO LV1

1/2"H&CW UP

TO LV1

3/4"CW UP & ON

TO SERVE

FIXTURES

ON WALL

1/2"H&CW UP

AND DOWN

TO MS1

1/2"H&CW

TO SK3 ABOVE

1/2"H&CW

TO SK3 ABOVE

1/2"H&CW

TO SK3 ABOVE

1/2"H&CW

TO SK3 ABOVE

1/2"H&CW

TO SK3 ABOVE

2" GAS UP AND DOWN

1 1/4" H&CW DOWN,

3/4"HWR DOWN

3/4" 100ºHW

3/4" CW

C W

1" CW

1/2" 100ºHW

3/4" CW

3/4" CW

1/2" 100ºHW

/4

C

W

/4

ºH W

1" CW

/4

C

W

3/4" 100ºHW

1" CW

/2

C

W

/2

ºH W

/4

ºH W

/4

C

W

1 1/4" 100ºHW

1 1/4" CW

INSTALL TP1 TO SERVE

FLOOR DRAIN IN

RESTROOM

INSTALL TP1 TO SERVE

FLOOR DRAIN IN

RESTROOM

3/4" HWR

/2

H

W R

/4

H

W R

/2

H

W R

1/2" HWR 1/2" HWR 1/2" HWR

3/4" 140ºHW

/2

H

W R

1/2" HWR

3/4"HW

FROM

BELOW

1/2" 140ºHW

1/2" CW

1/2"H&CW

TO WB1 ABOVE

RUN 3/4"H&CW LOW IN

WALL. STUB OUT 1/2"H&CW

TO EACH HS2 ON WALL

FROM THESE PIPE.

3/4"H&CW DOWN TO

HS2 SINKS

3/4" 140° HW DOWN

ºH

W

1/2" 140° HW

1/2"

HWR

1/2" 140° HW

3/4" CW

1/2" 100° HW

TO WASHER

BOX

1/2" 140° HW

1/2" CW

HB

S.C. SPRINKLER CONTRACTOR

P.C. PLUMBING CONTRACTOR

HUB DRAINHD

PRV PRESSURE REDUCING VALVE

RD ROOF DRAIN

INVERT ELEVATIONI.E.

VTR VENT THRU ROOF

FLOOR DRAIN, F.D.

HOSE BIBB (INTERIOR)

BALANCING VALVE

CHECK VALVE

CONTROL/SHUT-OFF VALVE

G GAS PIPE, G

ST STORM PIPING, ST

HOT WATER RETURN PIPING, HWRHWR

HOT WATER PIPING, HWHW

COLD WATER PIPING, CWCW

V VENT PIPING, V

S SANITARY/WASTE PIPING, S, W

SYMBOL DESCRIPTION

PLUMBING LEGEND

CO CLEANOUT

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

ENGINEERING

DIVISION OF

AGENCY

AUTHORIZED AGENT

FOR INTENT ONLY

DIV. OF ENGR.

REVIEWED

ENGR. ACCT NO.

DRAWING NO.

DATE

A&E FILE NO.

CHECKED BY

SHEET DRAWN BY

RECORD DATE

DATEREVISIONS

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES & SUPPORT SERVICES

DIVISION OF ENGINEERING

FRANKFORT, KENTUCKY

WWW.KLHENGRS.COM

ENGINEERS, PSC

MECHANICAL/ELECTRICAL ENGINEERS

KOHRS LONNEMANN HEIL

LEXINGTON, KENTUCKY

COLUMBUS, OHIO

DAYTON, OHIO

NEW YORK, NEW YORK

1538 ALEXANDRIA PIKE, SUITE

11 FT. THOMAS, KENTUCKY

41075 800-354-9783 859-442-8050

859-442-8058 FAX

KLH PRO. NO.

11369.04

PROFESSIONAL SERVICES CLASSROOM CENTER

/1

/2

:3 :4

A

M

PL1.2

PLUMBING - NEW - 2ND FLOOR

C5N5-NC11-01

GATEWAY URBAN CAMPUS

438-440 Scott St., Covington, KY 41011

12/18/15

201114.02

FAC

KPO

SCALE: 1/4" = 1'-0"PL1.2

1 PLUMBING SANITARY AND VENT- NEW - 2ND FLOOR

SCALE: 1/4" = 1'-0"PL1.2

2 PLUMBING SUPPLY - NEW - 2ND FLOOR

GENERAL PLUMBING NEW WORK NOTES

A. BOLD - DASHED LINES INDICATE NEW UNDERGROUND PLUMBING PIPING

AND FADED - DASHED LINES INDICATE EXISTING UNDERGROUND

PLUMBING WORK TO REMAIN.

B. WATER PIPING IN AREAS SUBJECT TO FREEZING TEMPERATURES WILL

NOT BE PERMITTED.

C. WHEREVER POSSIBLE, NEW PIPING AND RELOCATED PIPING SHALL BE

RUN CONCEALED. COORDINATE LOCATION OF ALL PIPING WITH HVAC

AND ELECTRIC SUBCONTRACTOR. COORDINATE CUTTING AND PATCHING

WITH GENERAL CONTRACTOR.

D. WHEREVER FIXTURES REQUIRING PLUMBING CONNECTIONS ARE

FURNISHED BY OWNER OR ARE RELOCATED, PLUMBING

SUBCONTRACTOR SHALL FURNISH AND INSTALL CARRIERS, "P" TRAP

AND STOPS.

E. ALL PIPE DROPS IN SALES AREA FROM ROOF TO LOW WALLS OR

EQUIPMENT SHOULD BE COORDINATED AND GROUP TOGETHER WITH

OTHER MECHANICAL PIPES.

F. NO PIPE ROUTING ALLOWED TO RUN THROUGH ELEVATOR EQUIPMENT

ROOMS.

G. DROP WATER DOWN IN WALL. ROUTE WATER THRU WALL TO SERVE

MULTIPLE FIXTURES ON COMMON WALL. FIXTURE SCHEDULE FOR

FIXTURE REQUIREMENTS.

H. ALL MEP TRADES, INCLUDING SPRINKLER MUST COORDINATE WITH EACH

OTHER PRIOR TO INSTALLATION.

I. PRIOR TO BID, CONTRACTOR SHALL VISIT THE JOB SITE AND FIELD

VERIFY THE EXISTING CONDITIONS. THE MECHANICAL CONTRACTOR

SHALL BE RESPONSIBLE FOR FIELD VERIFYING THE EXISTING STUB-INS,

TAPS, ETC. FOR PLUMBING SYSTEM FOR THE TENANT SPACE. THE

CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY OF ANY

DISCREPANCIES FOUND BETWEEN PLANS AND FIELD CONDITIONS IN

ORDER TO PREVENT UNKNOWN ADDITIONAL COSTS TO THE TENANT.

J. PROVIDE SHUTOFF VALVE(S) AT EACH FIXTURE.

K. ALL PLUMBING PIPING DROPS TO PLUMBING FIXTURES SHALL BE

INSTALLED IN WALL SPACE EXCEPT WHERE NOTED.

L. SUSPEND ALL HORIZONTAL WATER AND VENT PIPING AS HIGH AS

POSSIBLE ABOVE CEILING.

M. SAW CUT/CORE DRILL ALL SLAB PENETRATIONS. SEAL AROUND ALL

WALL, FLOOR AND CEILING PIPE PENETRATIONS WITH APPROVED

SEALANT MATERIAL AND ENSURE PENETRATIONS REMAIN FIRE

RESISTANT AND WATERTIGHT.

N. ALL EQUIPMENT, INSTALLATIONS AND MATERIALS SHALL COMPLY WITH

APPLICABLE LOCAL AND STATE CODES.

O. PROVIDE TRAP SEAL PRIMER ON ALL FLOOR DRAINS