This is a plumbing design plan prepared by the Commonwealth of Kentucky Finance and Administration Cabinet, Department for Facilities & Support Services, Division of Engineering, in collaboration with KLH Engineers, PSC for the Gateway Urban Campus located at 438-440 Scott Street in Covington, Kentucky. The document provides detailed mechanical and plumbing specifications for new second-floor installations within the classroom center, including sanitary and vent piping systems and water supply systems. The plan outlines pipe routing, sizing, fixture connections, and material requirements for multiple spaces including a classroom, facial/couple massage room, dispensary, offices, restrooms, and corridor areas, with comprehensive annotations indicating pipe diameters, flow directions, and connection points to fixtures such as sinks, lavatories, floor drains, and hose bibbs throughout the facility.
The plumbing specifications emphasize coordination requirements among all mechanical, electrical, and plumbing trades prior to installation, with mandatory pre-bid site visits and field verification of existing conditions and stub-ins. The contractor is required to notify the engineer immediately of any discrepancies between the plans and field conditions to prevent unknown costs. Key design requirements include concealed routing of piping where possible, proper coordination with HVAC and electrical subcontractors, installation of shutoff valves at each fixture, use of trap seal primers on floor drains, and compliance with applicable local and state codes. The document notes that water piping in areas subject to freezing temperatures is not permitted, all slab penetrations must be saw cut or core drilled, and all wall, floor, and ceiling pipe penetrations must be sealed with approved sealant materials to maintain fire resistance and watertight integrity.
View the file
Other files
Show 40 more
Latest 50 of 80 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B C D EA G
F
CLASSROOM
S
S S
S
S
FACIAL / COUPLE
MASSAGE
STAIR
D2
DISPENSARY
MEN
WOMEN
CUST.
206A
EXISTING STAIR
C2
OFFICE 2
OFFICE 1
CORRIDOR
200A
CLOSET
EXISTING STAIR
B2
V
V
S
S
S
S
S
V
V
FD1
FD1
SK1
WB1
DF1
UR1
WC1
LV1
SK3
WC1
LV1
MS1
HS2
2"VENT DOWN
2"VENT UP
1-1/2"VENT DOWN
1-1/2"VENT DOWN
1-1/2"VENT DOWN FOR DF1
ON THIS FLOOR
TO DF1 ABOVE
2"VENT DOWN
2"VENT UP
4"STORM UP
& DOWN
1-1/2"VENT DOWN
TO LV1 ABOVE
TO FD1 ABOVE
1-1/2"VENT
DOWN
TO UR1
ABOVE
4"SAN. TO WC1 ABOVE
2"VENT DOWN
3"SAN. TO
FD1 ABOVE
1-1/2"VENT DOWN
2"VENT DOWN
1-1/2"VENT DOWN
4"SAN DOWN
3"VENT DOWN
3"VENT UP
TO LV1 ABOVE
3"SAN. TO MS1
ABOVE
TO SK3 ABOVE
1-1/2"SAN. TO
SK3 ABOVE
1-1/2"SAN. TO
SK3 ABOVE
1-1/2" SAN.
TO SK3
ABOVE
1-1/2"SAN. TO
SK3 ABOVE
1-1/2"SAN. TO
SK3 ABOVE
CO
CO
CO
CO
CO
CO
CO
1-1/2"VENT DOWN
2"SAN. TO WB1
ABOVE
HS2
HS2
HS2
1-1/2"VENT DOWN
1-1/2"VENT DOWN
1-1/2"VENT DOWN
1-1/2"VENT DOWN
RUN VENT
PIPING AS LOW
AS POSSIBLE
IN WALL
V V
V V
B C D EA G
F
CLASSROOM
1/2" 100ºHW
1/2" CW
3/4" 100ºHW
3/4" CW
3/4" 100ºHW
3/4" CW
C W
ºH
W
1 1/4" 100ºHW
1 1/4" CW
1/2" CW
1/2" 100ºHW
FACIAL / COUPLE
MASSAGE
STAIR
D2
DISPENSARY
MEN
WOMEN
CUST.
206AEXISTING STAIR
C2
OFFICE 2
OFFICE 1
CORRIDOR
200A
CLOSET
EXISTING STAIR
B2
HB
HB
1/2"H&CW TO SK3 ABOVE
WB1
SK1
DF1
UR1
WC1
LV1
SK3
WC1
LV1
MS1
HS2
HS2
HS2
HS2
1/2"H&CW
DOWN TO SK1
1/2"H&CW
DOWN
TO WB1
1/2"CW DOWN
TO DF1 & 1/2"CW
UP TO DF1 ABOVE
3/4"CW DOWN
TO UR1
3/4"CW UP TO SERVE
FIXTURES ABOVE.
3/4"CW DOWN TO SERVE
FIXTURES ON WALL.
1/2"HW DOWN
TO SK3
1/2"H&CW
TO MS1 ABOVE
1/2"H&CW
TO LV1 ABOVE
1/2"H&CW
TO LV1 ABOVE,
1/2"H&CW
DOWN
TO LV1
1/2"H&CW UP
TO LV1
3/4"CW UP & ON
TO SERVE
FIXTURES
ON WALL
1/2"H&CW UP
AND DOWN
TO MS1
1/2"H&CW
TO SK3 ABOVE
1/2"H&CW
TO SK3 ABOVE
1/2"H&CW
TO SK3 ABOVE
1/2"H&CW
TO SK3 ABOVE
1/2"H&CW
TO SK3 ABOVE
2" GAS UP AND DOWN
1 1/4" H&CW DOWN,
3/4"HWR DOWN
3/4" 100ºHW
3/4" CW
C W
1" CW
1/2" 100ºHW
3/4" CW
3/4" CW
1/2" 100ºHW
/4
C
W
/4
ºH W
1" CW
/4
C
W
3/4" 100ºHW
1" CW
/2
C
W
/2
ºH W
/4
ºH W
/4
C
W
1 1/4" 100ºHW
1 1/4" CW
INSTALL TP1 TO SERVE
FLOOR DRAIN IN
RESTROOM
INSTALL TP1 TO SERVE
FLOOR DRAIN IN
RESTROOM
3/4" HWR
/2
H
W R
/4
H
W R
/2
H
W R
1/2" HWR 1/2" HWR 1/2" HWR
3/4" 140ºHW
/2
H
W R
1/2" HWR
3/4"HW
FROM
BELOW
1/2" 140ºHW
1/2" CW
1/2"H&CW
TO WB1 ABOVE
RUN 3/4"H&CW LOW IN
WALL. STUB OUT 1/2"H&CW
TO EACH HS2 ON WALL
FROM THESE PIPE.
3/4"H&CW DOWN TO
HS2 SINKS
3/4" 140° HW DOWN
ºH
W
1/2" 140° HW
1/2"
HWR
1/2" 140° HW
3/4" CW
1/2" 100° HW
TO WASHER
BOX
1/2" 140° HW
1/2" CW
HB
S.C. SPRINKLER CONTRACTOR
P.C. PLUMBING CONTRACTOR
HUB DRAINHD
PRV PRESSURE REDUCING VALVE
RD ROOF DRAIN
INVERT ELEVATIONI.E.
VTR VENT THRU ROOF
FLOOR DRAIN, F.D.
HOSE BIBB (INTERIOR)
BALANCING VALVE
CHECK VALVE
CONTROL/SHUT-OFF VALVE
G GAS PIPE, G
ST STORM PIPING, ST
HOT WATER RETURN PIPING, HWRHWR
HOT WATER PIPING, HWHW
COLD WATER PIPING, CWCW
V VENT PIPING, V
S SANITARY/WASTE PIPING, S, W
SYMBOL DESCRIPTION
PLUMBING LEGEND
CO CLEANOUT
APPROVED FOR PROGRAM CONCEPT ONLY
APPROVED FOR PROGRAM CONCEPT ONLY
DATE
DATE
ENGINEERING
DIVISION OF
AGENCY
AUTHORIZED AGENT
FOR INTENT ONLY
DIV. OF ENGR.
REVIEWED
ENGR. ACCT NO.
DRAWING NO.
DATE
A&E FILE NO.
CHECKED BY
SHEET DRAWN BY
RECORD DATE
DATEREVISIONS
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES & SUPPORT SERVICES
DIVISION OF ENGINEERING
FRANKFORT, KENTUCKY
WWW.KLHENGRS.COM
ENGINEERS, PSC
MECHANICAL/ELECTRICAL ENGINEERS
KOHRS LONNEMANN HEIL
LEXINGTON, KENTUCKY
COLUMBUS, OHIO
DAYTON, OHIO
NEW YORK, NEW YORK
1538 ALEXANDRIA PIKE, SUITE
11 FT. THOMAS, KENTUCKY
41075 800-354-9783 859-442-8050
859-442-8058 FAX
KLH PRO. NO.
11369.04
PROFESSIONAL SERVICES CLASSROOM CENTER
/1
/2
:3 :4
A
M
PL1.2
PLUMBING - NEW - 2ND FLOOR
C5N5-NC11-01
GATEWAY URBAN CAMPUS
438-440 Scott St., Covington, KY 41011
12/18/15
201114.02
FAC
KPO
SCALE: 1/4" = 1'-0"PL1.2
1 PLUMBING SANITARY AND VENT- NEW - 2ND FLOOR
SCALE: 1/4" = 1'-0"PL1.2
2 PLUMBING SUPPLY - NEW - 2ND FLOOR
GENERAL PLUMBING NEW WORK NOTES
A. BOLD - DASHED LINES INDICATE NEW UNDERGROUND PLUMBING PIPING
AND FADED - DASHED LINES INDICATE EXISTING UNDERGROUND
PLUMBING WORK TO REMAIN.
B. WATER PIPING IN AREAS SUBJECT TO FREEZING TEMPERATURES WILL
NOT BE PERMITTED.
C. WHEREVER POSSIBLE, NEW PIPING AND RELOCATED PIPING SHALL BE
RUN CONCEALED. COORDINATE LOCATION OF ALL PIPING WITH HVAC
AND ELECTRIC SUBCONTRACTOR. COORDINATE CUTTING AND PATCHING
WITH GENERAL CONTRACTOR.
D. WHEREVER FIXTURES REQUIRING PLUMBING CONNECTIONS ARE
FURNISHED BY OWNER OR ARE RELOCATED, PLUMBING
SUBCONTRACTOR SHALL FURNISH AND INSTALL CARRIERS, "P" TRAP
AND STOPS.
E. ALL PIPE DROPS IN SALES AREA FROM ROOF TO LOW WALLS OR
EQUIPMENT SHOULD BE COORDINATED AND GROUP TOGETHER WITH
OTHER MECHANICAL PIPES.
F. NO PIPE ROUTING ALLOWED TO RUN THROUGH ELEVATOR EQUIPMENT
ROOMS.
G. DROP WATER DOWN IN WALL. ROUTE WATER THRU WALL TO SERVE
MULTIPLE FIXTURES ON COMMON WALL. FIXTURE SCHEDULE FOR
FIXTURE REQUIREMENTS.
H. ALL MEP TRADES, INCLUDING SPRINKLER MUST COORDINATE WITH EACH
OTHER PRIOR TO INSTALLATION.
I. PRIOR TO BID, CONTRACTOR SHALL VISIT THE JOB SITE AND FIELD
VERIFY THE EXISTING CONDITIONS. THE MECHANICAL CONTRACTOR
SHALL BE RESPONSIBLE FOR FIELD VERIFYING THE EXISTING STUB-INS,
TAPS, ETC. FOR PLUMBING SYSTEM FOR THE TENANT SPACE. THE
CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY OF ANY
DISCREPANCIES FOUND BETWEEN PLANS AND FIELD CONDITIONS IN
ORDER TO PREVENT UNKNOWN ADDITIONAL COSTS TO THE TENANT.
J. PROVIDE SHUTOFF VALVE(S) AT EACH FIXTURE.
K. ALL PLUMBING PIPING DROPS TO PLUMBING FIXTURES SHALL BE
INSTALLED IN WALL SPACE EXCEPT WHERE NOTED.
L. SUSPEND ALL HORIZONTAL WATER AND VENT PIPING AS HIGH AS
POSSIBLE ABOVE CEILING.
M. SAW CUT/CORE DRILL ALL SLAB PENETRATIONS. SEAL AROUND ALL
WALL, FLOOR AND CEILING PIPE PENETRATIONS WITH APPROVED
SEALANT MATERIAL AND ENSURE PENETRATIONS REMAIN FIRE
RESISTANT AND WATERTIGHT.
N. ALL EQUIPMENT, INSTALLATIONS AND MATERIALS SHALL COMPLY WITH
APPLICABLE LOCAL AND STATE CODES.
O. PROVIDE TRAP SEAL PRIMER ON ALL FLOOR DRAINS