33-36 - PL1.0.pdf

PDF 303 KB Posted

Attached to
Surplus Real Property Sale For Economic Development; 438 Scott Boulevard
Solicitation number
RFP260305
Issued by
Hart County, Kentucky

About this file

This is a plumbing system design drawing prepared by the Commonwealth of Kentucky Finance and Administration Cabinet, Department for Facilities & Support Services, Division of Engineering, in coordination with KLH Engineers for the Gateway Urban Campus renovation project located at 438-440 Scott Street, Covington, Kentucky. The drawing, dated December 18, 2015, depicts new basement-level plumbing work including sanitary and vent systems, as well as supply systems for the Classroom Center renovation. The design specifies new sanitary piping connections to existing infrastructure, replacement of the sump pump (SP1), installation of a pressure-reducing valve to maintain service pressure below 80 PSI, and new water service connections to the existing meter. The plan includes provisions for multiple plumbing fixtures such as hair wash sinks requiring vacuum breaker connections, floor drains serving the DCDA (Domestic Cold Water Assembly) and fire sprinkler backflow, and hot water lines serving water heaters at 140 degrees Fahrenheit. The drawing incorporates both new piping shown in bold-dashed lines and existing piping to remain shown in faded-dashed lines, with detailed specifications for sanitary, vent, gas, cold water, hot water, and hot water return piping routes throughout the basement floor.

Key contractual and execution requirements include field verification of existing conditions prior to bidding, coordination among all mechanical, electrical, plumbing, and sprinkler trades before installation, and immediate notification to the engineer of any discrepancies between plans and field conditions. All piping work must comply with applicable Kentucky Plumbing Code and local regulations, with horizontal water and vent piping suspended as high as possible above ceilings. The contractor is responsible for saw cutting or core drilling all slab penetrations, sealing penetrations to maintain fire-resistance and watertight integrity, furnishing and installing pipe carriers and traps for fixtures, and performing cutting and patching in coordination with the general contractor. The project requires concealed routing of piping wherever possible and prohibits pipe routing through elevator equipment rooms or areas subject to freezing temperatures.

View the file

Other files

File Type Posted
66-67 - CT0.0.pdf PDF
51-49 - HV1.3.pdf PDF
8-13 - A1-1 - FIRST FLOOR DEMOLITION AND NEW WORK PLANS.pdf PDF
34-35 - PD1.1.pdf PDF
30-30 - A8-2 - Basement - FINISHES.pdf PDF
29-29 - A8-1 - ROOM FINISH PLANS (N-I-C- FURNITURE LAYOUT).pdf PDF
12-11 - S4-2 - FRAMING DETAILS.pdf PDF
15-8 - S2-5 - ROOF FRAMING PLAN.pdf PDF
73-19 - A3-0 - BUILDING ELEVATIONS.pdf PDF
49-51 - HV2.0.pdf PDF
72-72 - CT5.2.pdf PDF
67-69 - CT1.2.pdf PDF
62-63 - EP4.0.pdf PDF
3-6 - S2-3 - SECOND FLOOR FRAMING PLAN.pdf PDF
23-24 - A5-2 - MISCELLANEOUS DETAILS.pdf PDF
43-46 - HV1.0.pdf PDF
17-3 - S1-1 - GENERAL NOTES.pdf PDF
13-18 - A2-1 - 2ND 3RD FLR REFLECTED CLG PLANS.pdf PDF
28-31 - A8-3 - 1st FLOOR - FINISHES.pdf PDF
21-23 - A5-1 - MISCELLANEOUS STAIR DETAILS.pdf PDF
70-71 - CT5.1.pdf PDF
36-37 - PL1.1.pdf PDF
42-44 - FP1.1.pdf PDF
31-32 - A8-4 - 2nd Floor - FINISHES.pdf PDF
32-33 - A8-5 - 3rd Floor - FINISHES.pdf PDF
50-52 - HV2.1.pdf PDF
38-40 - PL1.4.pdf PDF
35-34 - PD1.0.pdf PDF
69-70 - CT4.1.pdf PDF
39-39 - PL1.3.pdf PDF
11-12 - A1-0 - BASEMENT DEMOLITION AND NEW WORK PLANS.pdf PDF
68-68 - CT1.0.pdf PDF
25-26 - A6-1 - ENLARGED PLANS AND INTERIOR ELEVATIONS.pdf PDF
63-64 - EL1.0.pdf PDF
19-10 - S4-1 - FRAMING DETAILS.pdf PDF
65-66 - EL2.0.pdf PDF
2-2 - A0-1 - CODE INFO AND WALL TYPES.pdf PDF
9-14 - A1-2 - SECOND FLOOR DEMOLITION AND NEW WORK PLANS.pdf PDF
76-Elevator Inspection 2026-03-25-12-13-48.pdf PDF
58-59 - EP1.3.pdf PDF
46-47 - HV1.1.pdf PDF
57-58 - EP1.2.pdf PDF
61-62 - EP3.0.pdf PDF
80-438 Scott Full Inspection Report (PDF).pdf PDF
7-5 - S2-2 - FIRST FLOOR FRAMING PLAN.pdf PDF
53-54 - HV3.1.pdf PDF
4-9 - S3-1 - TYPICAL DETAILS.pdf PDF
1-4 - S2-1 - FOUNDATION PLAN.pdf PDF
24-25 - A6-0 - ENLARGED PLANS AND INTERIOR ELEVATIONS.pdf PDF
48-50 - HV1.4.pdf PDF
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DCDA

R P

Z

R P

Z

B C D EA G

F

STUDENT LOUNGE

S S

S

S

SS

S

EXISTING STORAGE

EXISTING MECHANICAL

ROOM

EXISTING ELEVATOR

MACHINE ROOM

EXISTING STAIR

A

EXISTING ELEVATOR

E

S

S

S

GWH2

GWH1

V

V

S

V

V

S

V

V

V

V V

V

S

S

FD2

SP1

S

3"SAN. TO

HD1 ABOVE

3"SAN. TO

HD1 ABOVE

3"SAN. TO

HD1 ABOVE

3"SAN. TO

HD1 ABOVE

2"SAN. TO

SK2 ABOVE

2"SAN.TO

WB1 ABOVE

3"SAN. TO

FD1 ABOVE

4"SAN. TO

WC1 ABOVE

4"SAN. TO

WC1 ABOVE

2"SAN. TO

UR1 ABOVE3"SAN. TO

MS1 ABOVE

3"SAN. TO

FD1 ABOVE

4"SAN UP

1-1/2"SAN. TO

LV1 ABOVE

1-1/2"SAN. TO

LV1 ABOVE

2"VENT UP

2"VENT UP

3" SANITARY UP TO SK-

1 AND HS-2 SINKS ON

2ND FLOOR

S

S

1-1/2"SAN. TO

DF1 ABOVE

1-1/2"VENT UP

1-1/2"VENT UP

1-1/2"VENT UP

1-1/2"VENT UP

1-1/2"VENT UP

CO

CO

V

11 11

FD2

V

S

S T

EXISTING 6"

STORM UNDER

SIDE WACK

EXIST 5"

DOWNSPOUT

NEW 4" STORM TIE

INTO EXIST.

STORM UNDER

SIDEWALK

FLOOR

CLEANOUT

B C D EA G

F

STUDENT LOUNGE

ºH

W

1" 100ºHW

2" CW

1" 100ºHW

3/4" 100ºHW

3/4" CW

C

WG

EXISTING STORAGE

EXISTING MECHANICAL

ROOM

EXISTING ELEVATOR

MACHINE ROOM

EXISTING STAIR

A

EXISTING ELEVATOR

E

GWH2

GWH1

2" G

C W

/4

G

/4

G

1 1/4" 100ºHW

1 1/2" CW

G

G

3/4" 100ºHW

3/4" CW

2" G

2"GAS UP

1/2"H&CW UP

TO HS1 ABOVE

1/2"H&CW UP

TO HS1 ABOVE

1/2"H&CW UP

TO HS1 ABOVE

1/2"H&CW UP

TO HS1 ABOVE

1/2"H&CW UP

TO HS1 ABOVE

1/2"H&CW UP

TO PS1 ABOVE

1/2"H&CW UP

TO PS1 ABOVE

1/2"H&CW UP

TO PS1 ABOVE

1/2"H&CW UP

TO PS1 ABOVE

1-1/2"CW UP,

1-1/4" HW UP &

3/4"HWR UP

2 1/2" G

GAS

METER

/4

C

W

/4

ºH W

/4

C

W

/4

ºH W

/4

C

W

/4

ºH W

1" CW

1" 100ºHW

1" CW

1" 100ºHW

1" CW

1" 100ºHW

1" CW

INSTALL TP1 TO SERVE

FLOOR DRAIN THIS

ROOM

2"PRV, REDUCE

PRESSURE BELOW

80PSI

13 1419

1" CW

CP1

3/4" 140ºHW

3/4" 140ºHW

3/4"HW UP

4" WH EXAUST

FLUES UP

HB

S.C. SPRINKLER CONTRACTOR

P.C. PLUMBING CONTRACTOR

HUB DRAINHD

PRV PRESSURE REDUCING VALVE

RD ROOF DRAIN

INVERT ELEVATIONI.E.

VTR VENT THRU ROOF

FLOOR DRAIN, F.D.

HOSE BIBB (INTERIOR)

BALANCING VALVE

CHECK VALVE

CONTROL/SHUT-OFF VALVE

G GAS PIPE, G

ST STORM PIPING, ST

HOT WATER RETURN PIPING, HWRHWR

HOT WATER PIPING, HWHW

COLD WATER PIPING, CWCW

V VENT PIPING, V

S SANITARY/WASTE PIPING, S, W

SYMBOL DESCRIPTION

PLUMBING LEGEND

CO CLEANOUT

APPROVED FOR PROGRAM CONCEPT ONLY

APPROVED FOR PROGRAM CONCEPT ONLY

DATE

DATE

ENGINEERING

DIVISION OF

AGENCY

AUTHORIZED AGENT

FOR INTENT ONLY

DIV. OF ENGR.

REVIEWED

ENGR. ACCT NO.

DRAWING NO.

DATE

A&E FILE NO.

CHECKED BY

SHEET DRAWN BY

RECORD DATE

DATEREVISIONS

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES & SUPPORT SERVICES

DIVISION OF ENGINEERING

FRANKFORT, KENTUCKY

WWW.KLHENGRS.COM

ENGINEERS, PSC

MECHANICAL/ELECTRICAL ENGINEERS

KOHRS LONNEMANN HEIL

LEXINGTON, KENTUCKY

COLUMBUS, OHIO

DAYTON, OHIO

NEW YORK, NEW YORK

1538 ALEXANDRIA PIKE, SUITE

11 FT. THOMAS, KENTUCKY

41075 800-354-9783 859-442-8050

859-442-8058 FAX

KLH PRO. NO.

11369.04

PROFESSIONAL SERVICES CLASSROOM CENTER

/1

/2

:3 :2

A

M

PL1.0

PLUMBING - NEW - BASEMENT

FLOOR

C5N5-NC11-01

GATEWAY URBAN CAMPUS

438-440 Scott St., Covington, KY 41011

12/18/15

201114.02

FAC

KPO

KEYED NOTES

1 CONNECT NEW SANITARY INTO EXISTING AT THIS APPROXIMATE

LOCATION. FIELD VERIFY EXACT SIZE AND INVERT OF EXISTING

PIPE.

3 HS1, ABOVE, TO UTILIZE ISLAND LOOP VENT. PROVIDE LOOP

VENTING IN ACCORDANCE WITH THE KENTUCKY PLUMBING CODE.

5 REPLACE EXISTING SUMP PUMP WITH SP1, REFER TO PLUMBING

EQUIPMENT SCHEDULE. VERIFY EXACT LOCATION IN FIELD. VERIFY

FIXTURES CONNECTING TO SUMP PUMP IN FIELD. REUSE EXISTING

DISCHARGE PIPE IF POSSIBLE.

6 CONNECT NEW 3"SANITARY INTO SP1. VERIFY EXACT LOCAITON OF

ROUTING IN FIELD.

10 VERIFY CONDITION AND CONNECTION TO SANITARY SEWER.

FIXTURE IS TO REMAIN.

11 VERIFY PATH OF EXISTING WATER HEATER FLUE ROUTING. REUSE

PATH TO ROUTE NEW WATER HEATER FLUES.

12 CONNECT NEW 2"WATER SERVICE TO EXISTING METER.

13 PROVIDE AND INSTALL PRESSURE REDUCING VALVE TO REDUCE

SERVICE PRESSURE BELOW 80PSI.

14 PROVIDE AND INSTALL DCDA ASSEMBLY. REFER TO PLUMBING

EQUIPMENT SCHEDULE.

16 EXISTING GAS METER TO REMAIN. REUSE TO SERVICE BUILDING.

17 1-1/2"H&CW & 1/2"HWR TO WATER HEATERS. REFER TO DETAIL

224000.00-35 ON SHEET P1.5 FOR PIPING DIAGRAM.

19 PROVIDE AND INSTALL VACUUM BREAKER CONNECTION ON THE

SUPPLY SIDE OF ALL HAIR WASH SINKS, HS1 AND HS2.

30 EXISTING 4"SANITARY TO REMAIN.

31 FLOOR DRAIN TO SERVE DCDA AND FIRE SPRINKLER BACKFLOW.

32 3/4" 140 DEGREE HOT WATER TO WATER HEATERS. REFER TO

DETAIL 224000.00-35 ON SHEET P1.5 FOR PIPING DIAGRAM.

34 PATCH FLOOR AFTER INSTALLING NEW UNDER FLOOR PIPING.

SCALE: 1/4" = 1'-0"PL1.0

1 PLUMBING SANITARY AND VENT- NEW - BASEMENT FLOOR

SCALE: 1/4" = 1'-0"PL1.0

2 PLUMBING SUPPLY - NEW - BASEMENT FLOOR

GENERAL PLUMBING NEW WORK NOTES

A. BOLD - DASHED LINES INDICATE NEW UNDERGROUND PLUMBING PIPING

AND FADED - DASHED LINES INDICATE EXISTING UNDERGROUND

PLUMBING WORK TO REMAIN.

B. WATER PIPING IN AREAS SUBJECT TO FREEZING TEMPERATURES WILL

NOT BE PERMITTED.

C. WHEREVER POSSIBLE, NEW PIPING AND RELOCATED PIPING SHALL BE

RUN CONCEALED. COORDINATE LOCATION OF ALL PIPING WITH HVAC

AND ELECTRIC SUBCONTRACTOR. COORDINATE CUTTING AND PATCHING

WITH GENERAL CONTRACTOR.

D. WHEREVER FIXTURES REQUIRING PLUMBING CONNECTIONS ARE

FURNISHED BY OWNER OR ARE RELOCATED, PLUMBING

SUBCONTRACTOR SHALL FURNISH AND INSTALL CARRIERS, "P" TRAP

AND STOPS.

E. ALL PIPE DROPS IN SALES AREA FROM ROOF TO LOW WALLS OR

EQUIPMENT SHOULD BE COORDINATED AND GROUP TOGETHER WITH

OTHER MECHANICAL PIPES.

F. NO PIPE ROUTING ALLOWED TO RUN THROUGH ELEVATOR EQUIPMENT

ROOMS.

G. DROP WATER DOWN IN WALL. ROUTE WATER THRU WALL TO SERVE

MULTIPLE FIXTURES ON COMMON WALL. FIXTURE SCHEDULE FOR

FIXTURE REQUIREMENTS.

H. ALL MEP TRADES, INCLUDING SPRINKLER MUST COORDINATE WITH EACH

OTHER PRIOR TO INSTALLATION.

I. PRIOR TO BID, CONTRACTOR SHALL VISIT THE JOB SITE AND FIELD

VERIFY THE EXISTING CONDITIONS. THE MECHANICAL CONTRACTOR

SHALL BE RESPONSIBLE FOR FIELD VERIFYING THE EXISTING STUB-INS,

TAPS, ETC. FOR PLUMBING SYSTEM FOR THE TENANT SPACE. THE

CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY OF ANY

DISCREPANCIES FOUND BETWEEN PLANS AND FIELD CONDITIONS IN

ORDER TO PREVENT UNKNOWN ADDITIONAL COSTS TO THE TENANT.

J. PROVIDE SHUTOFF VALVE(S) AT EACH FIXTURE.

K. ALL PLUMBING PIPING DROPS TO PLUMBING FIXTURES SHALL BE

INSTALLED IN WALL SPACE EXCEPT WHERE NOTED.

L. SUSPEND ALL HORIZONTAL WATER AND VENT PIPING AS HIGH AS

POSSIBLE ABOVE CEILING.

M. SAW CUT/CORE DRILL ALL SLAB PENETRATIONS. SEAL AROUND ALL

WALL, FLOOR AND CEILING PIPE PENETRATIONS WITH APPROVED

SEALANT MATERIAL AND ENSURE PENETRATIONS REMAIN FIRE

RESISTANT AND WATERTIGHT.

N. ALL EQUIPMENT, INSTALLATIONS AND MATERIALS SHALL COMPLY WITH

APPLICABLE LOCAL AND STATE CODES.

O. PROVIDE TRAP SEAL PRIMER ON ALL FLOOR DRAINS

File details come from the government source that posted it. Updated .