21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_52.pdf

PDF 2 MB Posted

Attached to
FPCM-LAC-I001104-M035-RS
Solicitation number
0000036277
Issued by
Los Angeles County, California

About this file

This document is an electrical detail sheet for a roof replacement project at California State Prison, Los Angeles County (LAC), prepared by M. Neill Engineering for the California Department of Corrections and Rehabilitation (CDCR). The specific project is located at 44750 60th Street West in Lancaster, California, and involves replacing roofs in Phase 1, with working drawings dated August 29, 2023, and a planned implementation date of August 31, 2023. The electrical details sheet (E9.001) provides technical specifications for conduit penetration and roof mounting, including precise installation requirements such as securing rigid metal conduit within 3'-0" of termination points and supporting conduits at intervals not exceeding 10'-0".

The project has received approval from the Office of the State Fire Marshal, with an approved fire and panic safety review on 10/10/23 and a final approval number of 23-0002. The drawings include specific technical details for multiple conduit penetrations and conduit roof mounting, utilizing components like B-Line Dura-Block rubber channel conduit supports, Unistrut pipe clamps, and specifications for installation over single-ply roofing and concrete-over-metal deck surfaces. The project number is 5843.10, and the engineering firm is located in Sacramento, California, with contact information provided on the document.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NO SCALE

MULTIPLE CONDUIT PENETRATION DETAIL1

E9.001

NO SCALE

CONDUIT ON ROOF DETAIL2

E9.001

SET RUBBER BLOCKING TO

EXISTING ROOF DECK

RIGID CONDUIT PER PLAN

B-LINE DURA-BLOCK RUBBER

CHANNEL CONDUIT SUPPORT

AND BOLTS, CATALOG DB SERIES.

CONCRETE OVER

METAL DECK

SINGLE PLY ROOFING.

EXTEND UP CURB

TYPICAL- UNISTRUT

PIPE CLAMP 10'-0"

O.C. MAXIMUM.

CONDUIT FASTENING AND SUPPORT:

1. RIGID METAL CONDUIT SHALL BE SECURELY FASTENED WITHIN

3'-0" OF EACH OUTLET BOX, JUNCTION BOX, DEVICE BOX, CABINET,

CONDUIT BODY, OR OTHER CONDUIT TERMINATION.

2. CONDUIT SHALL BE SUPPORTED AT INTERVALS NOT EXCEEDING

10'-0".

SHEET NUMBER

S

TA

TE

O

F C

A

LI

FO

R N

IA

D

E P A R

TM

E N

T O

F C

O R

R E C

TI

O

N S A

N D

R E H

A B

IL

IT

A

TI

O N

FA

C

IL

IT

Y P

LA

N

N

IN

G , C

O N

S

TR

U C

TI

O

N A

N D

M A N

A G

E M

E N

T D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G

N

SE

RV

IC

ES

S

EC

TI

O N

APPROVAL

L A C

V1

C A L

IF

O R

N

IA

S T A T E P

R

IS

O N L O

S A

N G

E L E S C

O U

N T Y

T H

S T R

E E T , W

E S T

LA

N

C A S T E R

, C A

.1

Electrical Engineers Lighting Designers

100 Howe Ave., Suite 235N

Sacramento, CA 95825-8217

PROJECT #:

www.mneilsengineering.com

Tel: (916) 923-4400

PROJECT MGR: Stuart LinGsa\

21318.21

08/29/2023

R E P L A C E R

O O

F S

P H

A S E

A U

G U

S T

W O

R K

IN

G D

R A W

IN

G

S

E9.001

E L E C

T R

IC

A L D

E T A

IL

S

V1

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp-491 #1317