This document is a mechanical/plumbing roof plan remodel drawing for the California State Prison, Los Angeles County (LAC), specifically targeting Housing Unit Buildings 346 and 347, prepared by Turley Mechanical Engineering & Associates Group and Hibser Yamauchi Architects. The project involves a comprehensive roof replacement and equipment repositioning, with work focused on reinstalling and reconnecting existing mechanical units including air handling units (AHUs), air conditioning units, exhaust fans, water heaters, and associated piping and ductwork. The drawing is dated August 31, 2023, and has received approval from the California Department of Corrections and Rehabilitation's Facility Planning, Construction and Management Division, with fire safety approval obtained on 10/10/23.

The drawing provides detailed technical specifications for repositioning roof-mounted equipment, including requirements for new curb adaptors, flashing, piping reconnections, and duct modifications. Notable technical requirements include field verification of existing equipment details, ensuring proper startup and operation of all systems, and matching existing pipe and fitting materials. The project involves 30 plumbing vent pipes, multiple gas, water, and condensate drain line reconfigurations, and careful preservation of existing infrastructure. The State Fire Marshal has approved the plans, subject to field inspection, with a final approval date of 11/20/2023, indicating this is a carefully regulated state infrastructure improvement project.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 61.8 2 3 4 5 7 118 9 10

A

B

C

B.4

F

D

E

H

G

J

K

K.8

L

M

1 111.8 2 3 4 5 6 7 8 9 105.7 7.3

A

B

B.7

D

E.7

G.3

J

K.7

L

M

K

H

E

C

F

G

D14

08 08 08 08 08 08 08 08

07 07 07 07 07 07 07 07

070808 08080808 08 08 0707070707 07 07 07

(E)AC-1

(E)AHU-1

(E)AHU-2

(E)AHU-3

(E)EF-1(E)EF-2 (E)EF-3 (E)EF-4

(E)EF-5

(E)EF-6 (E)EF-7 (E)EF-8 (E)EF-9

(E)EF-32

(E)EF-10

(E)EF-11

(E)EF-12

(E)EF-13

(E)EF-30

(E)EF-14

(E)EF-15

(E)EF-16

(E)EF-17

(E)EF-29

(E)EF-28

(E)EF-18 (E)EF-19 (E)EF-20 (E)EF-21 (E)EF-22 (E)EF-23 (E)EF-24 (E)EF-25 (E)EF-26

(E)EF-27

(E)EF-31

(E)EF-33

(E)WH-1

(E)AC-2

(E)1 14"CD

(E)1 14"CD

(E)11

4"CD

D14

(E)3 4"ICW

(E)11

2"MPG

(E)3 4"MPG

(E)3 4"MPG

(E)3 4"MPG

HU 346 & HU 347 ONLY

(E)3 4"CD

(E) 3 4"CD

HU 346 & HU

347 ONLY

HU 346 & HU

347 ONLY

(E)3 4"MPG

16A

Project Engineer:

U R L E YT M E C H A N IC A L

E N G I N E E R I N G

G R O U P, I N C.& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capitol Avenue Sacramento, CA 95816

Project Manager:

GYang

Job Number:

Project Drafter: Login:

Plot Date: Aug 25, 2023 - 4:07pm

22107-PH1JT

JT

SHEET NUMBER

S

TA

TE

O

F C

A

LI

FO

R N

IA

D

E P A R

TM

E N

T O

F C

O R R

E C

TI

O N

S A

N D

R E H

A B

IL

IT

A

TI

O N

FA

C

IL

IT

Y P

LA

N

N

IN

G , C

O N

S

TR

U C

TI

O

N A

N D M

A N

A G

E M

E N

T D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G

N

SE

RV

IC

ES

S

EC

TI

O N

APPROVAL

L A C

V1

C A L

IF

O R

N

IA

S T A T E P

R

IS

O N

L O

S A

N G

E L E S C

O U N

T Y

T H

S T R

E E T , W

E S T

LA

N

C A S T E R

, C A

R E P L A C E R

O O

F S

P H

A S E

A U

G U

S T

W O

R K

IN

G D

R A W

IN

G

S

.1

A rc h it e ct s, I n c.

H

IB

S E R Y

A M

A U C

H I n d S tr e e t, S u it e

D a vi s, C

A

.7

.1 o ff ic e

.7

.4 f a x

MPC301

M E C

H A N

IC

A L P

L U

M B

IN

G

H

U B

U

IL

D

IN

G S

T

H R

U

R O

O F P

L A N

R E M

O D

E L

REMODEL NOTES

GENERAL NOTES

(E) G, CW, HW, HWR UTR, RECONNECTED, PROVIDE (N)CURB ADAPTOR FOR

MULTIPLE PIPES OR (N)FLASHING FOR SINGLE PIPE. PROVIDE NECESSARY

OFFSET. SINGLE PIPE PENERTRATION DETAIL SEE

MULTIPLE PIPE PENETRATION DETAIL SEE

16A (E) INDUSTRIAL COLD WATER PIPING PENETRATE INTO CURB, TEMPORARY

DISCONNECTED, RE-ROUTED AND RECONNECTED. DETAIL SEE

18 RECONNECT (E) NATURAL GAS PIPING CONNECT TO AC OR AHU W/ (E)PRESSURE

REGULATOR. DETAIL SEE

RE-INSTALL (E) AHU ON (N) RAISED CURB. RECONNECT ALL CONTROLS, PIPING,

DRAINS AND DUCTING. PROVIDE EXACT MEASUREMENTS OF CURB FOR THE

ADDITION OF A CURB EXTENDER. VERIFY DUCT SIZE. MOUNTING DETAIL SEE

, PIPING (GAS, WATER AND DRAIN) CONNECTION SEE

05 RE-INSTALL (E) AC UNIT ON (N) RAISED CURB. RECONNECT ALL CONTROLS,

PIPING, DRAINGS AND DUCTING. VERIFY DUCT SIZE. PROVIDE EXACT

MEASUREMENTS OF CURB FOR THE ADDITION OF A CURB ADAPTOR. MOUNTING

DETAIL SEE , GAS PIPE CONNECTION DETAIL SEE ,

CONDENSATE DRAIN CONNECTION SEE

RE-INSTALL (E) EXHAUST FAN ON (N) RAISED CURB, PROVIDE EXACT

MEASUREMENTS OF CURB FOR THE ADDITION OF A CURB ADAPTOR. SEE

DETAIL

(N) PLUMBING VENT PIPE @ (E) PENETRATION, TOTAL 30 VENT ON ROOF WITHIN

CONSTRUCTION AREA. RAISE VENT TO MAINTAIN REQUIRED DISTANCE FROM

TOP OF VENT TO TOP OF ROOF. DETAIL SEE

(E) CONDENSATE DRAIN (D) THRU ROOF, RECONNECTED, PROVIDE NEW FLASHING

AND NEW OFFSET. DETAIL SEE

(E) CONDENSATE DRAIN PIPING, TO BE REINSTALLED. PROVIDE NECESSARY

OFFSET FOR NEW HEIGHT OF CURB. NEW PIPE SIZE IS TO MATCH EXISTING.

REPLACE (E)PIPING WITH SAME SIZE (N)PIPING IS ACCEPTABLE. PIPE SUPPORT

DETAIL SEE

(E) INDUSTRIAL COLD WATER PIPING, TO BE REINSTALLED. PROVIDE NECESSARY

OFFSET FOR NEW HEIGHT OF CURB. NEW PIPE SIZE IS TO MATCH EXISTING.

REPLACE (E)PIPING WITH SAME SIZE (N)PIPING IS ACCEPTABLE. PIPE SUPPORT

DETAIL SEE

(E) INDUSTRIAL COLD WATER PIPE (R) THRU ROOF, RECONNECTED, PROVIDE NEW

FLASHING AND NEW OFFSET. DETAIL SEE

(E) MEDIUM PRESSURE NATURAL GAS PIPING, TO BE REINSTALLED. PROVIDE

NECESSARY OFFSET FOR NEW HEIGHT OF CURB. NEW PIPE SIZE IS TO MATCH

EXISTING. REPLACE (E)PIPING WITH SAME SIZE (N)PIPING IS ACCEPTABLE. PIPE

SUPPORT DETAIL SEE

(E) 36X24 DUCT ON ROOF, REINSTALLED AND PROVIDE NEW DUCT SUPPORT.

DETAIL SEE

(E) DUCT THRU ROOF. PROVIDE NEW CURB EXTENSION AND EXTEND/MODIFY

DUCT. RE-INSULATE DUCT. DETAIL SEE

G

MP501

H,I

MP501

A

MP502

E

MP501

H

MP501

I

MP501

A

MP501

B

MP501

C

MP501

F

MP501

D

MP501

F

MP501

C

MP502

D

MP501

H

MP501

D

MP502

B

MP502

G

MP502

F

MP501

(E)AHU-1 THRU 3 EXISTING HANDLING UNIT, "ENERGY LAB" UNIT W/

"REZNOR" NATURAL GAS FURNACE AND EVAP COOLER,

MODEL# AND DETAILED INFORMATION UNKNOWN.

(E)AC-1 EXISTING AIR CONDITIONING UNIT ON HIGH ROOF,

ROOF TOP UNIT W/ NATURAL GAS FURNACE,

MANUFACTURE, MODEL# AND DETAILED INFORMATION

UNKNOWN.

(E)AC-2 EXISTING AIR CONDITIONING UNIT ON LOW ROOF ROOF

TOP UNIT MANUFACTURE, MODEL# AND DETAILED

INFORMATION UNKNOWN.

(E)EF-1 THRU 33 EXISTING EXHAUST FAN, UNIT MODEL# AND DETAILED

INFORMATION UNKNOWN.

(E)WH-1 EXISTING WATER HEATER ON HIGH ROOF.

"TURBOPOWER" LOW NOX CATEGORY I FAN-ASSISTED

STORAGE WATER HEATER, 500 LHE 250A-TPL, 250

GALLON, 399,000 BTU/HR NATURAL GAS INPUT,

4.5"-10.5" W.C. GAS INLET PRESSURE, 120V/1PH/60 HZ,

5AMPS.

NOTES:

1. NO AS-BUILT DRAWING FOR THE BUILDINGS. NAMEPLATE FOR

MOST UNITS CANNOT BE FOUND OR NOT READABLE. CONTRACTOR

SHALL FIELD VERIFY ACTUAL UNIT INFORMATION FOR EACH BUILDING.

2. MANY AHU'S WERE FOUND TO BE LEAKING. THEY MUST BE

REPAIRED PRIOR TO REROOFING.

EXISTING EQUIPMENT SCHEDULE

N

N

BUILDING 347BUILDING 346

19 RE-INSTALL (E) WATER HEATER ON (N) CURBS. RECONNECT ALL CONTROLS

AND PIPING, MOUNTING DETAIL SEE AND , WATER PIPE

CONNECTION DETAIL SEE ,

NATURAL GAS PIPE CONNECTION SEE

A906 F

MP502

H

MP501

1. PROVIDE START UP OF ALL EQUIPMENT TO ENSURE IT IS OPERATING

PROPERLY. SEE GENERAL MECHANICAL/PLUMBING NOTES ON MP001.

2. WHERE SIZES ARE LARGER THAN SHOWN, MATCH (E)SIZES TO

MAINTAIN THE SAME SIZE AS EXISTING CONDITIONS.

3. FIELD VERIFY EXISTING GAS PIPE MATERIAL AT EACH BUILDING.

MATERIAL OF NEW GAS PIPING AND FITTINGS SHALL MATCH EXISTING

PIPING MATERIAL.

4. FIELD VERIFY EXACT HEIGHT OF EACH (E) CURB. IF TOP (E)CURB IS

EQUAL TO OR MORE THAN 8" ABOVE NEW FINISHED ROOF TOP, (E)UNIT

ON THE CURD CAN BE REMAIN IN PLACE AND PROTECTED DURING

CONSTRUCTION. INSTALL (N)FLASHING ON (E)CURB AFTER

REROOFING.

S501

V1

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp-491 #1317

File details come from the government source that posted it. Updated .