This electrical drawing is a roof plan for the California State Prison, Los Angeles County (LAC), prepared by M. Neil Engineering for the California Department of Corrections and Rehabilitation's Facility Planning, Construction and Management Division. The document specifically details an electrical remodeling plan for roof replacement in Phase 1, focusing on Typical 270 Housing Unit buildings (Buildings 331-349), with the project dated August 29, 2023 and working drawings set for August 31, 2023. The plan includes extensive electrical infrastructure modifications, such as extending existing circuits, replacing conduits and wiring, reinstalling mechanical units, and updating electrical equipment like disconnects, junction boxes, and receptacles.

The electrical drawings show comprehensive roof-level electrical work across multiple prison buildings, with specific requirements including replacing all above-roof conduit and wiring, maintaining existing circuit continuity, installing new EMT with compression fittings, and ensuring all new electrical components meet current code standards. The project involves precise coordination with mechanical and plumbing contractors, replacement of weatherproof receptacles, and ensuring all electrical installations are compatible with existing infrastructure. The drawings have received approval from the Office of the State Fire Marshal on October 10, 2023, with a final approval date of November 20, 2023, indicating the project has passed necessary regulatory inspections and meets required safety standards.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 61.8 2 3 4 5 7 118 9 10

A

B

C

B.4

F

D

E

H

G

J

K

K.8

L

M

1 111.8 2 3 4 5 6 7 8 9 105.7 7.3

A

B

B.7

D

E.7

G.3

J

K.7

L

M

K

H

E

C

F

G

(E) 3/4" CONDUIT UP

THROUGH ROOF

(E)

(E) (3) 3/4" CONDUITS

IN PITCH POCKET

(E) 1-1/2" CONDUIT UP

THROUGH ROOF

(E) (3) 3/4" CONDUITS

IN PITCH POCKET

(E) (2) 3/4" CONDUITS

IN PITCH POCKET

J

(E) 3/4" CONDUIT UP

THROUGH ROOF TO

J-BOX

(E) CONTROL

PANELS

(E) 1-1/2" CONDUIT UP

THROUGH ROOF

(E) (4) 3/4" CONDUITS

UP THROUGH ROOF

(E) MAIN CIRCUIT

BREAKER

DISCONNECT

J

WP

(E) CONTROL

PANELS

(E) MAIN CIRCUIT

BREAKER

DISCONNECT

(E) 1-1/2" CONDUIT UP

THROUGH ROOF

(E) (4) 3/4" CONDUITS

UP THROUGH ROOF

(E) 3/4" CONDUIT UP

THROUGH ROOF TO

J-BOX

J

(E) 3/4" CONDUIT UP

THROUGH ROOF TO

J-BOX

(E) 1-1/2" CONDUIT UP

THROUGH ROOF

(E) (4) 3/4" CONDUITS

UP THROUGH ROOF

(E) CONTROL

PANELS

(E) MAIN CIRCUIT

BREAKER

DISCONNECT

(E) (3) 3/4" CONDUITS

UP THROUGH ROOF

TO DUCT DETECTORS

AND CONTROLS

3 (E) (3) 3/4" CONDUITS

UP THROUGH ROOF

TO DUCT DETECTORS

AND CONTROLS

(E) (3) 3/4" CONDUITS

UP THROUGH ROOF

TO DUCT DETECTORS

AND CONTROLS

NUMBERED NOTES

GENERAL NOTES

1. EXTEND EXISTING CIRCUITS, WIRING AND CONDUITS AND RECONNECT TO EXISTING RELOCATED

MECHANICAL, LIGHTING AND ELECTRICAL EQUIPMENT. REUSE SAME CIRCUIT TO FEED SAME

MECHANICAL AND ELECTRICAL EQUIPMENT, AS PRIOR TO CONSTRUCTION. MAINTAIN EXISTING

CIRCUIT CONTINUITY AND EQUIPMENT FUNCTIONALITY. ALL ABOVE ROOF CONDUIT AND WIRING MUST BE REPLACED WITH NEW . WIRE SIZE, QUANTITY AND TYPE SHALL MATCH EXISTING. SPLICE IN POWER WIRING IS NOT ACCEPTABLE. NEW CONTROL WIRING TO HVAC EQUIPMENT MAY ONLY BE INSTALLED

FOR THE RUN FROM THE EQUIPMENT CONTROL PANEL TO THE NEAREST EXISTING TERMINATION

POINT OR SPLICE LOCATION INSTALL NEW EMT WITH COMPRESSION FITTINGS AND LIQUID-TIGHT

FLEXIBLE METAL CONDUIT TERMINATION AT THE MECHANICAL EQUIPMENT.

2. REPLACE EXISTING DISCONNECT/MANUAL STARTERS WITH NEW TO FEED SAME HVAC, AS PRIOR TO

CONSTRUCTION. NEW DISCONNECT/STARTER TO MATCH EXISTING TYPE, VOLTAGE, PHASE, AND

CURRENT RATING. REPLACE ALL EXISTING WEATHERPROOF GFCI SERVICE RECEPTACLES WITH NEW

WP/WR/GFCI RECEPTACLES THAT ARE TO CURRENT CODE.

3. PROVIDE NEW WEATHERPROOF, NEMA 3R JUNCTION BOXES AND WATERTIGHT FLEX CONDUITS FOR EACH MECHANICAL AND ELECTRICAL EQUIPMENT. KEEP EXISTING CONDUIT PENETRATIONS AT THE

SAME LOCATIONS AS PRIOR TO CONSTRUCTION.

4. PROVIDE BLOCKING AND CHANNELS TO CONDUIT RACEWAY AS NEEDED ON ROOFTOP. COORDINATE

WITH MECHANICAL AND PLUMBING CONTRACTORS FOR JOINT USE BLOCKING. SEE "2/E9.001"

REINSTALLED MECHANICAL UNIT. RECONNECT EXISTING POWER AFTER ROOFING REPLACEMENT.

SEE DETAIL "1/E9.001" ON SHEET E9.001.

REPLACE EXISTING RECEPTACLE WITH NEW GFCI, WEATHER PROOF, WEATHER RESISTANT

RECEPTACLE.

LOCATE AND INTERCEPT EXISTING CIRCUIT AND CONTROLS BELOW ROOF DECK. SPLICE AND

EXTEND TO RAISED EQUIPMENT AND RE-CONNECT. TYPICAL FOR ALL MECHANICAL UNITS

MOUNTED ON RAISED ROOF.

PROVIDE NEW GFCI, WEATHER PROOF, WEATHER RESISTANT RECEPTACLE WITH METAL

WHILE-IN-USE COVER. CONNECT TO THE EXISTING ROOF RECEPTACLE CIRCUIT.

ALL CONDUIT RUN EXPOSED ON THE ROOF SHALL BE SUPPORTED PER DETAIL "2/E9.001".

SUPPORT SPACING SHALL BE PER DETAIL "2/E9.001", NOTES 1 AND 2.

SHEET NUMBER

S

TA

TE

O

F C

A

LI

FO

R N

IA

D E P A R

TM

E N T

O F

C O

R R E C

TI

O

N S A

N D

R E H

A B

IL

IT

A

TI

O N

FA

C

IL

IT

Y P

LA

N N

IN

G , C

O N S

TR

U C

TI

O

N A

N D

M A N A G

E M

E N

T D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G

N

SE

RV

IC

ES

S

EC

TI

O N

APPROVAL

L A C

V1

C A L

IF

O R

N

IA

S T A T E P

R

IS

O N L O

S A

N G

E L E S C

O U N T Y

T H

S T R

E E T , W

E S T

LA

N C

A S T E R

, C A

.1

Electrical Engineers Lighting Designers

100 Howe Ave., Suite 235N

Sacramento, CA 95825-8217

PROJECT #:

www.mneilsengineering.com

Tel: (916) 923-4400

PROJECT MGR: Stuart LinGsa\

21318.21

08/29/2023

R E P L A C E R

O O

F S

P H

A S E

A U G

U S T

W O

R K

IN

G D

R A W

IN

G

S

1/8"=1'-0"

TYPICAL 270 HOUSING UNIT ROOF PLAN - REMODEL - ELECTRICAL1

EA301

EA301

T Y P

IC

A L

H

O U

S

IN

G U

N

IT

R O

O F P

L A

N R

E M

O D

E L

E L E C

T R

IC

A L

5'

1/8" = 1'-0"

0 25'10' 15' 20'

GRAPHIC SCALE

BUILDING 332 BUILDING 331

N

N N

BUILDING 333 BUILDING 335

N

BUILDING 336 BUILDING 337 BUILDING 338 BUILDING 339 BUILDING 3310 BUILDING 341 BUILDING 342 BUILDING 343 BUILDING 344

N

N N N

N

N

BUILDING 345

N N

N

N

BUILDING 348 BUILDING 349 BUILDING 3410

N N

N

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp 491 #1317

File details come from the government source that posted it. Updated .