This document is a roof demolition plan drawing for a California State Prison project located in Lancaster, California, prepared by the State of California Department of Corrections and Rehabilitation's Facility Planning, Construction and Management Division. The drawing specifically details the demolition plan for a Typical 270 Housing Unit Roof, covering multiple buildings (Buildings 331-349 and 3310), with the project dated August 31, 2023. The plan includes comprehensive demolition legends and keynotes describing the systematic removal of existing roofing components, mechanical units, walkpads, electrical conduits, guardrails, and other roof-related infrastructure, with specific instructions for handling and protecting existing equipment during the renovation process.

The document indicates this is a phased roof replacement project, with meticulous attention to preserving and reinstalling existing equipment where possible. Key demolition requirements include removing existing built-up roofing systems, rigid insulation, counter flashing, and penetration flashings, with provisions for patching and repairing the existing metal deck with lightweight concrete topping. The plan emphasizes compliance with local, state, and federal codes, and includes specific instructions for debris removal, utility protection, and coordination with plant operations. The project has received approval from the Office of the State Fire Marshal on 10/10/23, with a final approval date of 11/20/2023, suggesting the project is in its final planning and preparation stages.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12'-0" 13'-0" 13'-0" 13'-0" 13'-0"13'-0" 13'-0"13'-0"5'-8" 13'-0"11'-2"

DN

3 1 1.8 2 6 4 5 7 8 9 1110

B.4

A

B

D

C

J

E

F

G

H

K

K.8

L

M

1 111.8 2 3 4 5 6 7 8 9 10 5.7 7.3

A

B

B.7

D

E.7

G.3

J

K.7

L

M

134'-2"

1'-4"

2'-2"

(E

S L O

P E

/4

(E) SLOPE

1/4" : 1'-0"

(E

S L O

P E

/4

(E

S L O

P E

/4

(E

S L O

P E

/4

(E

S L O

P E

/4

( E

S L O

P E

/4

RIDGE

D04

TYP

D01

TYP

D01

TYP

D01

TYP

D01

TYP

D02

TYP

D01

D15

D14

D17

D01

TYP

D02

TYP

D03

D09

D14

D10

TYP

D07

TYP

D13

TYP

D18

D05

D07

TYP

D05

TYP

D05

D05

D19

D10

TYP

D06

TYP

D06

TYP

D16

D14

D13

TYP

D13

TYP

D04

TYP

D08

TYP

D08

TYP

D04

TYP

D21

D11

TYP

D11

TYP

D11

TYP

D12

D12

D14

D02

TYP

D07

TYP

D14

D18

(E) SCUPPER AT HIGHER ROOF TO BE REMOVED.

GENERAL NOTES

1. ALL CONSTRUCTION DEBRIS GENERATED IN THE COURSE OF THIS PROJECT SHALL

BE REMOVED AND DISPOSED OF IN COMPLIANCE WITH ALL LOCAL, STATE AND

FEDERAL CODES AND REGULATIONS.

2. REPAIR/REPLACE ANY DAMAGED UTILITIES DURING THE COURSE OF WORK.

3. PROTECT BUILDING FROM DAMAGE WHICH MAY OCCUR FROM DEMOLITION, DUST,

WATER, ADVERSE WEATHER, ETC.

4. CONTRACTOR TO PATCH AND REPAIR ALL AREAS DAMAGED BY, OR INCIDENTAL TO

DEMOLITION AND/OR NEW WORK TO MATCH ADJACENT FINISHES UNLESS

OTHERWISE NOTED.

5. REPLACE ALL (E) CONDUIT & PIPE SUPPORTS ON ROOF W/ (N) HARD PIPE SUPPORT

BLOCK. SED & SMD.

6. REMOVE (E) CONDUIT OR PIPE IN CONFLICT WITH THE INSTALLATION OF (N) WORK.

REINSTALL AFTER COMPLETION OF (N) WORK.

7. REMOVE ALL (E) MECHANICAL UNITS, VENTS, AND FANS AS REQUIRED TO PERFORM

ROOFING AND FLASHING WORK. STORE AND PROTECT UNITS FOR REINSTALL TO

WORKING ORDER. SCHEDULE MEETING WITH HEAD OF MAINTENANCE AND

CONTRACTOR TO VERIFY WORKING ORDER OF HVAC SYSTEM PRIOR TO WORK AND

ONCE WORK IS COMPLETE.

8. PROTECT ELECTRICAL BOXES.

9. ALL INFORMATION SHOWN ON THE DRAWING RELATIVE TO (E) CONDITIONS IS GIVEN

AS THE BEST PRESENT KNOWLEDGE . WHERE ACTUAL CONDITIONS CONFLICT WITH

THE DRAWING, THEY SHALL BE REPORTED TO THE ARCHITECT SO THAT THE

CORRECTIONS/CLARIFICATIONS CAN BE PROVIDED.

10. ALL DIMENSIONS ARE TO BE VERIFIED IN FIELD.

11. COORDINATE WITH PLANT OPS BEFORE AND AFTER SHUTTING OFF ANY UTILITIES.

12. ANY GAS LINES THAT HAVE BEEN DISCONNECTED AND RECONNECTED, SHALL BE

INSPECTED AND TESTED FOR LEAKAGE IN ACCORDANCE WITH CPC 1213, CMC 1303

AND NFPA 54.

13.PAINT ALL (N) TRIMS AND FLASHING TO MATCH (E) COLOR.

14.ALL FIRE RETARDANT TREATED WOOD SHALL BE INSPECTED PRIOR TO COVERING.

MATERIAL SHALL BEAR A LABEL THAT INDICATES ITS LISTING.

EQUIPMENT LEGEND

* NOTE: QUANTITY IS APPROXIMATE, VIF

(E) VENT PIPES TO RECEIVE BOOT FLASHING

SEE DETAIL

(E) EXHAUST FAN OVER (N) CURB ADAPTER,

SEE DETAIL

QTY.SYMBOL DESCRIPTION

DEMOLITION LEGEND

AREA OF (E) BUILT-UP ROOFING SYSTEM TO BE REMOVED,

INCLUDING RIGID INSULATION, COUNTER FLASHING,

FLASHING AROUND PENETRATIONS, ETC. (E) METAL DECK

WITH LIGHT WEIGHT CONCRETE TOPPING TO BE PATCHED

AND REPAIRED AS REQUIRED TO PREPARE STRUCTURE

FOR NEW ROOF SYSTEM.

(E) FUEL GAS PIPING, SMD.

(E) WALKPAD TO BE REMOVED

(E) BUILDING FOOTPRINT BELOW.

32 PER ROOF

32 PER ROOF

(E) CONDENSATE LINE, SMD.

(E) ELECTRICAL CONDUIT, SED.

(E) CAT WALK

DEMOLITION KEYNOTES

(E) PARAPET COPING CAP TO BE REMOVED AND RECYCLED. INSPECTED FOR

WATER DAMAGE.

REMOVE (E) MECHANICAL UNIT AND CURB. STORE AND PROTECT FOR

REINSTALLATION. SMD.

D01

D02

D04

D05

D06

D07

D08

D09

D10

D11

(E) ROOF VENT PIPE TO REMAIN. REMOVE (E) FLASHING. EXTEND TO 12" AFR

WHERE NECESSARY.

DEMOLISH (E) WALK PADS/PAVERS, TYP.

D12

(E) SCUPPER AT LOWER ROOF TO REMAIN.

D13

REMOVE AND PROTECT (E) EXHAUST FAN FOR REINSTALLATION, SMD.

(E) ROOF MOUNTED CONDENSATE PIPE ON SUPPORT BLOCK TO BE REMOVED

AND REPLACED. SMD.

REMOVE (E) CRICKET.

(E) ELECTRICAL CONDUIT TO BE REMOVED AND RE-INSTALLED, SED.

D14 (E) GUARDRAIL TO BE REMOVED.

D15

D16

D03 (E) STAIRCASE TO REMAIN.

REMOVE AND REINSTALL (E) STAIR CAGE

D17

D18

(E) CATWALK TO BE REMOVED. CONDITION AT STAIRS OCCURS AT ALL

BUILDINGS. CONDITION ALONG PARAPET OCCURS AT BUILDINGS 331, 333, 335,

348, AND 3310.

(E) CURB TO REMAIN, EXTEND AS REQUIRED.

(E) ROOF HATCH TO BE REMOVED.

REMOVE (E) WATER HEATER ON CURB. STORE AND PROTECT FOR

REINSTALLATION. SMD.

D19

(E) AHU DUCT SUPPORT AND BRACE TO BE REMOVED AND REPLACED, SMD

REMOVE AND PROTECT (E) TRANSITION LADDER

D20

REMOVE (E) GRAB BAR.D20

TYPICAL 270 HOUSING UNIT ROOF PLAN DEMOLITION

SCALE: 1/8" = 1'-0"

SHEET NUMBER

S T

A T

E O

F C

A

LI

F O

R N

IA

D

E P

A R

T M

E N

T O

F C

O R

R E

C T

IO

N

S A

N D

R E

H A

B

IL

IT

A

T

IO

N F

A C

IL

IT

Y P

LA

N

N

IN

G , C

O N

S T

R U

C T

IO

N

A N

D M

A N

A G

E M

E N

T D

IV

IS

IO

N

D

ES

IG

N

S

ER

VI

C

ES

A

N D

S

TA

N D

AR

D

S

BR

AN

C

H D

ES

IG

N S

ER

VI

C

ES

S

EC

TI

O

N

APPROVAL

L A C

V1

C A

L

IF

O R

N

IA

S T

A T

E P

R

IS

O N

L O

S A

N G

E L E

S C

O U

N T

Y

T

H S

T R

E E

T

W E

S T

L A

N C

A S

T E

R

C A

R E

P L A

C E

R O

O F

S

P

H A

S E

A U

G U

S T

F

IN

A L D

R A

W

IN

G S

.1

AA201

T Y

P

IC

A L

H

O U

S

IN

G U

N

IT

R O

O F

P L

A N

D E

M O

L

IT

IO

N

BUILDING 332 BUILDING 331

N

N N

BUILDING 333 BUILDING 335

N

BUILDING 336 BUILDING 337 BUILDING 338 BUILDING 339 BUILDING 3310 BUILDING 341 BUILDING 342 BUILDING 343 BUILDING 344

N

N N N

N

N

BUILDING 345

N N

N

N

BUILDING 348 BUILDING 349 BUILDING 3410

N N

N

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp 491 #1317

File details come from the government source that posted it. Updated .