This document is a roof demolition plan drawing for a California State Prison project located in Lancaster, California, prepared by the State of California Department of Corrections and Rehabilitation's Facility Planning, Construction and Management Division. The drawing specifically details the demolition plan for a Typical 270 Housing Unit Roof, covering multiple buildings (Buildings 331-349 and 3310), with the project dated August 31, 2023. The plan includes comprehensive demolition legends and keynotes describing the systematic removal of existing roofing components, mechanical units, walkpads, electrical conduits, guardrails, and other roof-related infrastructure, with specific instructions for handling and protecting existing equipment during the renovation process.
The document indicates this is a phased roof replacement project, with meticulous attention to preserving and reinstalling existing equipment where possible. Key demolition requirements include removing existing built-up roofing systems, rigid insulation, counter flashing, and penetration flashings, with provisions for patching and repairing the existing metal deck with lightweight concrete topping. The plan emphasizes compliance with local, state, and federal codes, and includes specific instructions for debris removal, utility protection, and coordination with plant operations. The project has received approval from the Office of the State Fire Marshal on 10/10/23, with a final approval date of 11/20/2023, suggesting the project is in its final planning and preparation stages.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12'-0" 13'-0" 13'-0" 13'-0" 13'-0"13'-0" 13'-0"13'-0"5'-8" 13'-0"11'-2"
DN
3 1 1.8 2 6 4 5 7 8 9 1110
B.4
A
B
D
C
J
E
F
G
H
K
K.8
L
M
1 111.8 2 3 4 5 6 7 8 9 10 5.7 7.3
A
B
B.7
D
E.7
G.3
J
K.7
L
M
134'-2"
1'-4"
2'-2"
(E
S L O
P E
/4
(E) SLOPE
1/4" : 1'-0"
(E
S L O
P E
/4
(E
S L O
P E
/4
(E
S L O
P E
/4
(E
S L O
P E
/4
( E
S L O
P E
/4
RIDGE
D04
TYP
D01
TYP
D01
TYP
D01
TYP
D01
TYP
D02
TYP
D01
D15
D14
D17
D01
TYP
D02
TYP
D03
D09
D14
D10
TYP
D07
TYP
D13
TYP
D18
D05
D07
TYP
D05
TYP
D05
D05
D19
D10
TYP
D06
TYP
D06
TYP
D16
D14
D13
TYP
D13
TYP
D04
TYP
D08
TYP
D08
TYP
D04
TYP
D21
D11
TYP
D11
TYP
D11
TYP
D12
D12
D14
D02
TYP
D07
TYP
D14
D18
(E) SCUPPER AT HIGHER ROOF TO BE REMOVED.
GENERAL NOTES
1. ALL CONSTRUCTION DEBRIS GENERATED IN THE COURSE OF THIS PROJECT SHALL
BE REMOVED AND DISPOSED OF IN COMPLIANCE WITH ALL LOCAL, STATE AND
FEDERAL CODES AND REGULATIONS.
2. REPAIR/REPLACE ANY DAMAGED UTILITIES DURING THE COURSE OF WORK.
3. PROTECT BUILDING FROM DAMAGE WHICH MAY OCCUR FROM DEMOLITION, DUST,
WATER, ADVERSE WEATHER, ETC.
4. CONTRACTOR TO PATCH AND REPAIR ALL AREAS DAMAGED BY, OR INCIDENTAL TO
DEMOLITION AND/OR NEW WORK TO MATCH ADJACENT FINISHES UNLESS
OTHERWISE NOTED.
5. REPLACE ALL (E) CONDUIT & PIPE SUPPORTS ON ROOF W/ (N) HARD PIPE SUPPORT
BLOCK. SED & SMD.
6. REMOVE (E) CONDUIT OR PIPE IN CONFLICT WITH THE INSTALLATION OF (N) WORK.
REINSTALL AFTER COMPLETION OF (N) WORK.
7. REMOVE ALL (E) MECHANICAL UNITS, VENTS, AND FANS AS REQUIRED TO PERFORM
ROOFING AND FLASHING WORK. STORE AND PROTECT UNITS FOR REINSTALL TO
WORKING ORDER. SCHEDULE MEETING WITH HEAD OF MAINTENANCE AND
CONTRACTOR TO VERIFY WORKING ORDER OF HVAC SYSTEM PRIOR TO WORK AND
ONCE WORK IS COMPLETE.
8. PROTECT ELECTRICAL BOXES.
9. ALL INFORMATION SHOWN ON THE DRAWING RELATIVE TO (E) CONDITIONS IS GIVEN
AS THE BEST PRESENT KNOWLEDGE . WHERE ACTUAL CONDITIONS CONFLICT WITH
THE DRAWING, THEY SHALL BE REPORTED TO THE ARCHITECT SO THAT THE
CORRECTIONS/CLARIFICATIONS CAN BE PROVIDED.
10. ALL DIMENSIONS ARE TO BE VERIFIED IN FIELD.
11. COORDINATE WITH PLANT OPS BEFORE AND AFTER SHUTTING OFF ANY UTILITIES.
12. ANY GAS LINES THAT HAVE BEEN DISCONNECTED AND RECONNECTED, SHALL BE
INSPECTED AND TESTED FOR LEAKAGE IN ACCORDANCE WITH CPC 1213, CMC 1303
AND NFPA 54.
13.PAINT ALL (N) TRIMS AND FLASHING TO MATCH (E) COLOR.
14.ALL FIRE RETARDANT TREATED WOOD SHALL BE INSPECTED PRIOR TO COVERING.
MATERIAL SHALL BEAR A LABEL THAT INDICATES ITS LISTING.
EQUIPMENT LEGEND
* NOTE: QUANTITY IS APPROXIMATE, VIF
(E) VENT PIPES TO RECEIVE BOOT FLASHING
SEE DETAIL
(E) EXHAUST FAN OVER (N) CURB ADAPTER,
SEE DETAIL
QTY.SYMBOL DESCRIPTION
DEMOLITION LEGEND
AREA OF (E) BUILT-UP ROOFING SYSTEM TO BE REMOVED,
INCLUDING RIGID INSULATION, COUNTER FLASHING,
FLASHING AROUND PENETRATIONS, ETC. (E) METAL DECK
WITH LIGHT WEIGHT CONCRETE TOPPING TO BE PATCHED
AND REPAIRED AS REQUIRED TO PREPARE STRUCTURE
FOR NEW ROOF SYSTEM.
(E) FUEL GAS PIPING, SMD.
(E) WALKPAD TO BE REMOVED
(E) BUILDING FOOTPRINT BELOW.
32 PER ROOF
32 PER ROOF
(E) CONDENSATE LINE, SMD.
(E) ELECTRICAL CONDUIT, SED.
(E) CAT WALK
DEMOLITION KEYNOTES
(E) PARAPET COPING CAP TO BE REMOVED AND RECYCLED. INSPECTED FOR
WATER DAMAGE.
REMOVE (E) MECHANICAL UNIT AND CURB. STORE AND PROTECT FOR
REINSTALLATION. SMD.
D01
D02
D04
D05
D06
D07
D08
D09
D10
D11
(E) ROOF VENT PIPE TO REMAIN. REMOVE (E) FLASHING. EXTEND TO 12" AFR
WHERE NECESSARY.
DEMOLISH (E) WALK PADS/PAVERS, TYP.
D12
(E) SCUPPER AT LOWER ROOF TO REMAIN.
D13
REMOVE AND PROTECT (E) EXHAUST FAN FOR REINSTALLATION, SMD.
(E) ROOF MOUNTED CONDENSATE PIPE ON SUPPORT BLOCK TO BE REMOVED
AND REPLACED. SMD.
REMOVE (E) CRICKET.
(E) ELECTRICAL CONDUIT TO BE REMOVED AND RE-INSTALLED, SED.
D14 (E) GUARDRAIL TO BE REMOVED.
D15
D16
D03 (E) STAIRCASE TO REMAIN.
REMOVE AND REINSTALL (E) STAIR CAGE
D17
D18
(E) CATWALK TO BE REMOVED. CONDITION AT STAIRS OCCURS AT ALL
BUILDINGS. CONDITION ALONG PARAPET OCCURS AT BUILDINGS 331, 333, 335,
348, AND 3310.
(E) CURB TO REMAIN, EXTEND AS REQUIRED.
(E) ROOF HATCH TO BE REMOVED.
REMOVE (E) WATER HEATER ON CURB. STORE AND PROTECT FOR
REINSTALLATION. SMD.
D19
(E) AHU DUCT SUPPORT AND BRACE TO BE REMOVED AND REPLACED, SMD
REMOVE AND PROTECT (E) TRANSITION LADDER
D20
REMOVE (E) GRAB BAR.D20
TYPICAL 270 HOUSING UNIT ROOF PLAN DEMOLITION
SCALE: 1/8" = 1'-0"
SHEET NUMBER
S T
A T
E O
F C
A
LI
F O
R N
IA
D
E P
A R
T M
E N
T O
F C
O R
R E
C T
IO
N
S A
N D
R E
H A
B
IL
IT
A
T
IO
N F
A C
IL
IT
Y P
LA
N
N
IN
G , C
O N
S T
R U
C T
IO
N
A N
D M
A N
A G
E M
E N
T D
IV
IS
IO
N
D
ES
IG
N
S
ER
VI
C
ES
A
N D
S
TA
N D
AR
D
S
BR
AN
C
H D
ES
IG
N S
ER
VI
C
ES
S
EC
TI
O
N
APPROVAL
L A C
V1
C A
L
IF
O R
N
IA
S T
A T
E P
R
IS
O N
L O
S A
N G
E L E
S C
O U
N T
Y
T
H S
T R
E E
T
W E
S T
L A
N C
A S
T E
R
C A
R E
P L A
C E
R O
O F
S
P
H A
S E
A U
G U
S T
F
IN
A L D
R A
W
IN
G S
.1
AA201
T Y
P
IC
A L
H
O U
S
IN
G U
N
IT
R O
O F
P L
A N
D E
M O
L
IT
IO
N
BUILDING 332 BUILDING 331
N
N N
BUILDING 333 BUILDING 335
N
BUILDING 336 BUILDING 337 BUILDING 338 BUILDING 339 BUILDING 3310 BUILDING 341 BUILDING 342 BUILDING 343 BUILDING 344
N
N N N
N
N
BUILDING 345
N N
N
N
BUILDING 348 BUILDING 349 BUILDING 3410
N N
N
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
10/10/23
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans