This is a mechanical/plumbing roof remodel drawing for the California State Prison, Los Angeles County (LAC) located in Lancaster, California, prepared by Turley Mechanical Engineering & Associates Group and Hibser Yamauchi Architects. The project involves Phase 1 roof replacement for Facility A, Buildings 334, with working drawings dated August 31, 2023. The document details comprehensive roof remodeling work including re-installing existing air conditioning units, air handling units, exhaust fans, water heaters, and associated mechanical and plumbing infrastructure on new raised curbs and platforms. The project includes 33 existing exhaust fans, multiple air conditioning and handling units, and a water heater, with specific instructions for reconnecting controls, piping, drains, and ducting.

The drawings have been approved by the California Department of Corrections and Rehabilitation's Facility Planning, Construction and Management Division, with Fire and Panic approval from the Office of the State Fire Marshal on 10/10/23. The project requires detailed field verification of existing equipment specifications, with contractors instructed to verify actual unit information for each building. Specific technical requirements include maintaining existing pipe sizes, matching existing gas pipe materials, and ensuring proper installation of new flashing and curb adaptors. The documents highlight that many air handling units were found to be leaking and must be repaired prior to reroofing, emphasizing the comprehensive nature of the infrastructure maintenance and upgrade work.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3 1 1.8 2 6 4 5 7 8 9 1110

B.4

A

B

D

C

J

E

F

G

H

K

K.8

L

M

1 111.8 2 3 4 5 6 7 8 9 105.7 7.3

A

B

B.7

D

E.7

G.3

J

K.7

L

M

08 08 08 08 08 08 08 08

07 07 07 07 07 07 07 07

070808 080808080808 0707070707070707

(E)AC-1

(E)AHU-1

(E)AHU-2

(E)AHU-3

(E)EF-1(E)EF-2 (E)EF-3 (E)EF-4

(E)EF-5

(E)EF-6 (E)EF-7 (E)EF-8 (E)EF-9

(E)EF-32

(E)EF-10

(E)EF-11

(E)EF-12

(E)EF-13

(E)EF-30

(E)EF-14

(E)EF-15

(E)EF-16

(E)EF-17

(E)EF-29

(E)EF-28

(E)EF-18 (E)EF-19 (E)EF-20 (E)EF-21 (E)EF-22 (E)EF-23 (E)EF-24 (E)EF-25 (E)EF-26

(E)EF-27

(E)EF-31

(E)EF-33

(E)WH-1

(E)1 14"CD

(E)1 14"CD

(E)11

4"CD

D14

(E)34"ICW

(E)11

2"MPG

(E)34"MPG

(E)34"MPG

(E)34"MPG

(E)34"CD

(E)34"MPG

16A

05A

(E)AC-2

G.3

J

K.7

L

M

(E)19X12SA

(D)FROM (E)AC-2

ABOVE

(E)19X12RA

(R)TO (E)AC-2

ABOVE

118 9 10

Project Engineer:

U R L E YT M E C H A N IC A L

E N G I N E E R I N G

G R O U P, I N C.& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capitol Avenue

Sacramento, CA 95816

Project Manager:

GYang

Job Number:

Project Drafter: Login:

Plot Date: Aug 25, 2023 - 4:07pm

22107-PH1JT

JT

SHEET NUMBER

S

TA

TE

O

F C

A

LI

FO

R

N

IA

D E P A R

TM

E N T

O F

C O

R R

E C

TI

O

N S A

N D R

E H

A B

IL

IT

A

TI

O N

FA

C

IL

IT

Y P

LA

N

N

IN

G , C

O N

S

TR

U C

TI

O

N A

N D

M A N A G

E M

E N

T D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G

N

SE

RV

IC

ES

S

EC

TI

O N

APPROVAL

L A C

V1

C A L

IF

O R

N

IA

S T A T E P

R

IS

O N L O

S A

N G

E L E S C

O U

N T Y

T H

S T R

E E T , W

E S T

LA

N C

A S T E R

, C A

R E P L A C E R

O O

F S

P H

A S E

A U

G U

S T

W O

R K

IN

G D

R A W

IN

G

S

.1

A rc h it e ct s, I n c.

H

IB

S E R Y

A M

A U C

H I n d S tr e e t, S u it e

D a vi s, C

A

.7

.1 o ff ic e

.7

.4 f a x

GENERAL NOTES

05A RE-INSTALLED AC UNIT ON RAISED PLATEFORM. RECONNECT ALL CONTROLS,

PIPING, DRAINGS AND DUCTING. VERIFY DUCT SIZE. GAS PIPE CONNECTION

DETAIL SEE , CONDENSATE DRAIN CONNECTION SEE

16A (E) INDUSTRIAL COLD WATER PIPING PENETRATE INTO CURB, TEMPORARY

DISCONNECTED, RE-ROUTED AND RECONNECTED. DETAIL SEE

18 RECONNECT (E) NATURAL GAS PIPING CONNECT TO AC OR AHU W/ (E)PRESSURE

REGULATOR. DETAIL SEE

RE-INSTALL (E) AHU ON (N) RAISED CURB. RECONNECT ALL CONTROLS, PIPING,

DRAINS AND DUCTING. PROVIDE EXACT MEASUREMENTS OF CURB FOR THE

ADDITION OF A CURB EXTENDER. VERIFY DUCT SIZE. MOUNTING DETAIL SEE

, PIPING (GAS, WATER AND DRAIN) CONNECTION SEE

05 RE-INSTALL (E) AC UNIT ON (N) RAISED CURB. RECONNECT ALL CONTROLS,

PIPING, DRAINGS AND DUCTING. VERIFY DUCT SIZE. PROVIDE EXACT

MEASUREMENTS OF CURB FOR THE ADDITION OF A CURB ADAPTOR. MOUNTING

DETAIL SEE , GAS PIPE CONNECTION DETAIL SEE ,

CONDENSATE DRAIN CONNECTION SEE

RE-INSTALL (E) EXHAUST FAN ON (N) RAISED CURB, PROVIDE EXACT

MEASUREMENTS OF CURB FOR THE ADDITION OF A CURB ADAPTOR. SEE

DETAIL

(N) PLUMBING VENT PIPE @ (E) PENETRATION, TOTAL 29 VENT ON ROOF WITHIN

CONSTRUCTION AREA. RAISE VENT TO MAINTAIN REQUIRED DISTANCE FROM

TOP OF VENT TO TOP OF ROOF. DETAIL SEE

(E) CONDENSATE DRAIN (D) THRU ROOF, RECONNECTED, PROVIDE NEW FLASHING

AND NEW OFFSET. DETAIL SEE

(E) CONDENSATE DRAIN PIPING, TO BE REINSTALLED. PROVIDE NECESSARY

OFFSET FOR NEW HEIGHT OF CURB. NEW PIPE SIZE IS TO MATCH EXISTING.

REPLACE (E)PIPING WITH SAME SIZE (N)PIPING IS ACCEPTABLE. PIPE SUPPORT

DETAIL SEE

(E) INDUSTRIAL COLD WATER PIPING, TO BE REINSTALLED. PROVIDE NECESSARY

OFFSET FOR NEW HEIGHT OF CURB. NEW PIPE SIZE IS TO MATCH EXISTING.

REPLACE (E)PIPING WITH SAME SIZE (N)PIPING IS ACCEPTABLE. PIPE SUPPORT

DETAIL SEE

(E) INDUSTRIAL COLD WATER PIPE (R) THRU ROOF, RECONNECTED, PROVIDE NEW

FLASHING AND NEW OFFSET. DETAIL SEE

(E) MEDIUM PRESSURE NATURAL GAS PIPING, TO BE REINSTALLED. PROVIDE

NECESSARY OFFSET FOR NEW HEIGHT OF CURB. NEW PIPE SIZE IS TO MATCH

EXISTING. REPLACE (E)PIPING WITH SAME SIZE (N)PIPING IS ACCEPTABLE. PIPE

SUPPORT DETAIL SEE

G

MP501

H,I

MP501

A

MP502

E

MP501

H

MP501

I

MP501

A

MP501

B

MP501

C

MP501

F

MP501

D

MP501

F

MP501

C

MP502

D

MP501

H

MP501

H

MP501

I

MP501

23 (E) DUCTWORK ON LOW ROOF, REINSTALLED AND PROVIDE NEW DUCT

SUPPORT. DETAIL SEE

D

MP502

MPB301

M E C

H A N

IC

A L P

L U

M B

IN

G

F A

C

IL

IT

Y

H

U B

U

IL

D

IN

G S

R O

O F P

L A N

R E M

O D

E L

(E)AHU-1 THRU 3 EXISTING HANDLING UNIT, "REZNOR" UNIT W/ NATURAL

GAS FURNACE AND EVAP COOLER, MODEL# AND

DETAILED INFORMATION UNKNOWN.

(E)AC-1 EXISTING AIR CONDITIONING UNIT ON HIGH ROOF,

ROOF TOP UNIT W/ NATURAL GAS FURNACE,

MANUFACTURE, MODEL# AND DETAILED INFORMATION

UNKNOWN.

(E)AC-2 EXISTING AIR CONDITIONING UNIT IN CAGE, ROOF TOP

UNIT, "INTERNATIONAL COMFORT PRODUCTS" MODEL

NUMBER PGB0350LHG, 90,000 BTU/HR NATURAL GAS

INPUT, 71,000 BTU/HR OUTPUT, OTHER DETAILED

INFORMATION UNKNOWN.

(E)EF-1 THRU 33 EXISTING EXHAUST FAN, UNIT MODEL# AND DETAILED

INFORMATION UNKNOWN.

(E)WH-1 EXISTING WATER HEATER ON HIGH ROOF.

"TURBOPOWER" LOW NOX CATEGORY I FAN-ASSISTED

STORAGE WATER HEATER, 500 LHE 250A-TPL, 250

GALLON, 399,000 BTU/HR NATURAL GAS INPUT,

4.5"-10.5" W.C. GAS INLET PRESSURE, 120V/1PH/60 HZ,

5AMPS.

NOTES:

1. NO AS-BUILT DRAWING FOR THE BUILDINGS. NAMEPLATE FOR

MOST UNITS CANNOT BE FOUND OR NOT READABLE. CONTRACTOR

SHALL FIELD VERIFY ACTUAL UNIT INFORMATION FOR EACH BUILDING.

2. MANY AHU'S WERE FOUND TO BE LEAKING. THEY MUST BE

REPAIRED PRIOR TO REROOFING.

EXISTING EQUIPMENT SCHEDULE

N N

REMODEL NOTES

1. PROVIDE START UP OF ALL EQUIPMENT TO ENSURE IT IS OPERATING

PROPERLY. SEE GENERAL MECHANICAL/PLUMBING NOTES ON MP001.

2. WHERE SIZES ARE LARGER THAN SHOWN, MATCH (E)SIZES TO

MAINTAIN THE SAME SIZE AS EXISTING CONDITIONS.

3. FIELD VERIFY EXISTING GAS PIPE MATERIAL AT EACH BUILDING.

MATERIAL OF NEW GAS PIPING AND FITTINGS SHALL MATCH EXISTING

PIPING MATERIAL.

4. FIELD VERIFY EXACT HEIGHT OF EACH (E) CURB. IF TOP (E)CURB IS

EQUAL TO OR MORE THAN 8" ABOVE NEW FINISHED ROOF TOP, (E)UNIT

ON THE CURD CAN BE REMAIN IN PLACE AND PROTECTED DURING

CONSTRUCTION. INSTALL (N)FLASHING ON (E)CURB AFTER

REROOFING.

(E) G, CW, HW, HWR UTR, RECONNECTED, PROVIDE (N)CURB ADAPTOR FOR

MULTIPLE PIPES OR (N)FLASHING FOR SINGLE PIPE. PROVIDE NECESSARY

OFFSET. SINGLE PIPE PENERTRATION DETAIL SEE

MULTIPLE PIPE PENETRATION DETAIL SEE

(E) 36X24 DUCT ON ROOF, REINSTALLED AND PROVIDE NEW DUCT SUPPORT.

DETAIL SEE

(E) DUCT THRU ROOF. PROVIDE NEW CURB EXTENSION AND EXTEND/MODIFY

DUCT. RE-INSULATE DUCT. DETAIL SEE

D

MP502

B

MP502

G

MP502

F

MP501

19 RE-INSTALL (E) WATER HEATER ON (N) CURBS. RECONNECT ALL CONTROLS

AND PIPING, MOUNTING DETAIL SEE AND , WATER PIPE

CONNECTION DETAIL SEE ,

NATURAL GAS PIPE CONNECTION SEE

A906 F

MP502

H

MP501

S501

V1

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp-491 #1317