This document is an electrical roof remodel plan for Facility A 270 Housing Unit Building 334 at California State Prison, Los Angeles County, prepared by M. Neil Engineering for the California Department of Corrections and Rehabilitation (CDCR). The plan details electrical modifications for a roof replacement project, specifically focusing on extending existing electrical circuits, replacing conduits and wiring, reinstalling mechanical units, and updating electrical equipment. The project is located at 44750 60th Street West in Lancaster, California, and involves precise electrical infrastructure updates for the housing unit building.

The electrical plan includes comprehensive instructions for maintaining existing circuit continuity and equipment functionality, with specific requirements for replacing disconnects, manual starters, receptacles, and junction boxes. Key specifications include using new EMT with compression fittings, liquid-tight flexible metal conduit, and ensuring all new electrical components match existing voltage, phase, and current ratings. The drawings are dated August 29, 2023, with working drawings submitted on August 31, 2023, and have received approval from the Office of the State Fire Marshal on October 10, 2023. The project number is 5843.10, and the engineering firm's project number is 21318.21.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3 1 1.8 2 6 4 5 7 8 9 1110

B.4

A

B

D

C

J

E

F

G

H

K

K.8

L

M

1 111.8 2 3 4 5 6 7 8 9 105.7 7.3

A

B

B.7

D

E.7

G.3

J

K.7

L

M

(E)

(E) (3) 3/4" CONDUITS

IN PITCH POCKET

(E) 1-1/2" CONDUIT UP

THROUGH ROOF

(E) (3) 3/4" CONDUITS

IN PITCH POCKET

(E) (2) 3/4" CONDUITS

IN PITCH POCKET

J

(E) 3/4" CONDUIT UP

THROUGH ROOF TO

J-BOX

(E) CONTROL

PANELS

(E) 1-1/2" CONDUIT UP

THROUGH ROOF

(E) (4) 3/4" CONDUITS

UP THROUGH ROOF

(E) MAIN CIRCUIT

BREAKER

DISCONNECT

J

(E) CONTROL

PANELS

(E) MAIN CIRCUIT

BREAKER

DISCONNECT

(E) 1-1/2" CONDUIT UP

THROUGH ROOF

(E) (4) 3/4" CONDUITS

UP THROUGH ROOF

(E) 3/4" CONDUIT UP

THROUGH ROOF TO

J-BOX

J

(E) 3/4" CONDUIT UP

THROUGH ROOF TO

J-BOX

(E) 1-1/2" CONDUIT UP

THROUGH ROOF

(E) (4) 3/4" CONDUITS

UP THROUGH ROOF

(E) CONTROL

PANELS

(E) MAIN CIRCUIT

BREAKER

DISCONNECT

(E) BEACON

(E) 1/2" CONDUIT ON

TOP OF PARAPET

J

(E) 3/4" CONDUIT UP

THROUGH ROOF

(E) 3/4" CONDUIT DOWN

SIDE OF BUILDING

(E) 3/4" CONDUIT

(E) (1) 3/4" CONDUIT

AND (E) 1/2" CONDUIT

J

(E) GUARD SHACK

(E) 3/4" CONDUIT ON

PARAPET WALL

(E) 3/4" CONDUIT ON

TOP OF PARAPET

(E) CONDUIT

DOWN WALL

(E)

(E) 1" CONDUIT UP

THROUGH PLATFORM

(E) (3) 3/4" CONDUITS

UP THROUGH ROOF

TO DUCT DETECTORS

AND CONTROLS

(E) (3) 3/4" CONDUITS

UP THROUGH ROOF

TO DUCT DETECTORS

AND CONTROLS

(E) (3) 3/4" CONDUITS

UP THROUGH ROOF

TO DUCT DETECTORS

AND CONTROLS

(E) 3/4" CONDUIT UP

THROUGH ROOF

(E) 3/4" CONDUIT UP

THROUGH ROOF

WP

11 8 9 10

G.3

J

K.7

L

M

SLO

PE

SLO

PE

7 7.3

J (E)

J

J

(E) CONDUIT ON

WALL TO REMAIN

GENERAL NOTES

1. EXTEND EXISTING CIRCUITS, WIRING AND CONDUITS AND RECONNECT TO EXISTING RELOCATED

MECHANICAL, LIGHTING AND ELECTRICAL EQUIPMENT. REUSE SAME CIRCUIT TO FEED SAME

MECHANICAL AND ELECTRICAL EQUIPMENT, AS PRIOR TO CONSTRUCTION. MAINTAIN EXISTING

CIRCUIT CONTINUITY AND EQUIPMENT FUNCTIONALITY. ALL ABOVE ROOF CONDUIT AND WIRING MUST BE REPLACED WITH NEW . WIRE SIZE, QUANTITY AND TYPE SHALL MATCH EXISTING. SPLICE IN POWER WIRING IS NOT ACCEPTABLE. NEW CONTROL WIRING TO HVAC EQUIPMENT MAY ONLY BE INSTALLED

FOR THE RUN FROM THE EQUIPMENT CONTROL PANEL TO THE NEAREST EXISTING TERMINATION

POINT OR SPLICE LOCATION INSTALL NEW EMT WITH COMPRESSION FITTINGS AND LIQUID-TIGHT

FLEXIBLE METAL CONDUIT TERMINATION AT THE MECHANICAL EQUIPMENT.

2. REPLACE EXISTING DISCONNECT/MANUAL STARTERS WITH NEW TO FEED SAME HVAC, AS PRIOR TO

CONSTRUCTION. NEW DISCONNECT/STARTER TO MATCH EXISTING TYPE, VOLTAGE, PHASE, AND

CURRENT RATING. REPLACE ALL EXISTING WEATHERPROOF GFCI SERVICE RECEPTACLES WITH NEW

WP/WR/GFCI RECEPTACLES THAT ARE TO CURRENT CODE.

3. PROVIDE NEW WEATHERPROOF, NEMA 3R JUNCTION BOXES AND WATERTIGHT FLEX CONDUITS FOR EACH MECHANICAL AND ELECTRICAL EQUIPMENT. KEEP EXISTING CONDUIT PENETRATIONS AT THE

SAME LOCATIONS AS PRIOR TO CONSTRUCTION.

4. PROVIDE BLOCKING AND CHANNELS TO CONDUIT RACEWAY AS NEEDED ON ROOFTOP. COORDINATE

WITH MECHANICAL AND PLUMBING CONTRACTORS FOR JOINT USE BLOCKING. SEE "2/E9.001"

NUMBERED NOTES

REINSTALLED MECHANICAL UNIT. RECONNECT EXISTING POWER AFTER ROOFING REPLACEMENT.

SEE DETAIL "1/E9.001" ON SHEET E9.001.

REPLACE EXISTING RECEPTACLE WITH NEW GFCI, WEATHER PROOF, WEATHER RESISTANT

RECEPTACLE.

LOCATE AND INTERCEPT EXISTING CIRCUIT AND CONTROLS BELOW ROOF DECK. SPLICE AND

EXTEND TO RAISED EQUIPMENT AND RE-CONNECT. TYPICAL FOR ALL MECHANICAL UNITS

MOUNTED ON RAISED ROOF.

EXISTING RSC LOCATED ON ROOF TO BE REINSTALLED AFTER ROOFING REPLACEMENT. FIELD

VERIFY QUANTITIES AND SIZES. REFER TO DETAIL "1/E9.001" ON SHEET E9.001.

EXISTING RSC LOCATED ON TOP OF PARAPET TO BE REINSTALLED AFTER ROOFING

REPLACEMENT. FIELD VERIFY QUANTITIES AND SIZES. REFER TO DETAIL "1/E9.001" ON SHEET E9.001.

EXISTING RSC LOCATED ON PARAPET WALL TO BE REINSTALLED AFTER ROOFING REPLACEMENT.

FIELD VERIFY QUANTITIES AND SIZES. REFER TO DETAIL "1/E9.001" ON SHEET E9.001.

PROVIDE NEW GFCI, WEATHER PROOF, WEATHER RESISTANT RECEPTACLE WITH METAL

WHILE-IN-USE COVER. CONNECT TO THE EXISTING ROOF RECEPTACLE CIRCUIT.

ALL CONDUIT RUN EXPOSED ON THE ROOF SHALL BE SUPPORTED PER DETAIL "2/E9.001".

SUPPORT SPACING SHALL BE PER DETAIL "2/E9.001", NOTES 1 AND 2.

SHEET NUMBER

S

TA

TE

O

F C A

LI

FO

R N

IA

D

E P A R

TM

E N

T O

F C

O R R

E C

TI

O

N S A

N D R

E H

A B

IL

IT

A

TI

O N

FA

C

IL

IT

Y P

LA

N

N

IN

G , C

O N

S

TR

U C

TI

O N

A N

D M

A N

A G

E M

E N

T D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G

N

SE

RV

IC

ES

S

EC

TI

O N

APPROVAL

L A C

V1

C A L

IF

O R

N

IA

S T A T E P

R

IS

O N

L O

S A

N G

E L E S C

O U

N T Y

T H

S T R

E E T , W

E S T

LA

N

C A S T E R

, C A

.1

Electrical Engineers Lighting Designers

100 Howe Ave., Suite 235N

Sacramento, CA 95825-8217

PROJECT #:

www.mneilsengineering.com

Tel: (916) 923-4400

PROJECT MGR: Stuart LinGsa\

21318.21

08/29/2023

R E P L A C E R

O O

F S

P H

A S E

A U

G U

S T

W O

R K

IN

G D

R A W

IN

G

S

1/8"=1'-0"

FACILITY A 270 HOUSING UNIT BUILDING 334 ROOF PLAN - REMODEL - ELECTRICAL1

EB301

EB301

F A

C

IL

IT

Y A

H O

U S

IN

G U

N

IT

B U

IL

D

IN

G

R

O O

F P

L A

N

R E M

O D

E L E

L E C

T R

IC

A L

1/8"=1'-0"

ROOF PLAN - REMODEL - ELECTRICAL2

EB301

PARTIAL SECOND LEVEL AND

FACILITY A 270 HOUSING UNIT BUILDING 334

5'

1/8" = 1'-0"

0 25'10' 15' 20'

GRAPHIC SCALE

N

N

09/13/2023

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp-491 #1317