21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf
PDF 773 KB Posted
- Attached to
- FPCM-LAC-I001104-M035-RS
- Solicitation number
- 0000036277
- Issued by
- Los Angeles County, California
About this file
This document is a set of architectural building section drawings for the California State Prison in Los Angeles County, prepared by the California Department of Corrections and Rehabilitation's Facility Planning, Construction and Management Division. The project involves replacing roofs for Housing Unit Building 334 at the California State Prison located in Lancaster, CA, with the final drawings dated August 31, 2023. The drawings detail the roof replacement work, including specific elements such as new 80 mil fully-adhered PVC roofing system, reinstallation of existing mechanical units and exhaust fans on new raised curbs, installation of new metal coping, scuppers, roof hatch, and bird deterrent features.
The project has received approval from the Office of the State Fire Marshal on 10/10/23 with the project number 23-0002, and includes a Certified Access Specialist (CASp) certification number 491 #1317. The drawings provide comprehensive technical details for the roof replacement, showing multiple building sections with specific annotations for existing and new construction elements, including structural steel frames, precast concrete panels, and various roofing components. The drawings are part of the final design phase for the Phase 1 roof replacement project, indicating a structured approach to facility maintenance and improvement at the state prison facility.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0'-0"
T.O. 1ST FLR
18'-6"
T.O. (E) PRECAST
CONCRETE WALL
TYP.
18'-6"
T.O. (E) PRECAST
CONCRETE WALL
1.81
1 1/2" Ø (SCH. 40)
GALVANIZED PIPE
GUARDRAIL
(N) GALV. STEEL GRATING
ON STRUCTURAL STEEL
(E) STRUCTURAL STEEL FRAME
(E) STRUCTURAL STEEL FRAME
M L K.7 K J H G.3 G F E6 E D C B.7 B A
1 1.8 2 3 4 5 5.7 6 7 7.3 8 9 10 11
0'-0"
T.O. 1ST FLR
18'-6"
T.O. (E) PRECAST
CONCRETE WALL
21'-6"
T.O. (E) PRECAST PANEL
TYP.
TYP.
TYP.
TYP.
03 0807
BEYOND
TYP.
TYP.
TYP.
TYP.
7 7.3 8 9 10
0'-0"
T.O. 1ST FLR
21'-6"
T.O. (E) PRECAST PANEL
16'-1/2"
T.O. (E) PRECAST PANEL
10'-3 1/2"
T.O. (E) P.C.C ROOF PANEL
270 HOUSING UNIT BUILDING 334 - BUILDING SECTION
SCALE: 1/8" = 1'-0"
270 HOUSING UNIT BUILDING 334 - BUILDING SECTION
SCALE: 1/8" = 1'-0"
AB601
F A
C
IL
IT
Y
A
H
O U
S
IN
G U
N
IT
B U
IL
D
IN
G
B U
IL
D
IN
G
S E
C T
IO
N
S
SHEET NUMBER
S T A T E O
F C
A
LI
F O
R N
IA
D
E P A R
T M
E N
T O
F C
O R
R E C
T
IO
N S A
N D
R E H
A B
IL
IT
A T
IO
N F A C
IL
IT
Y P
LA
N
N
IN
G , C
O N
S T R U
C T
IO
N A
N D
M A N
A G
E M
E N
T D
IV
IS
IO
N
D
ES
IG
N
S
ER
VI
C
ES
A
N D
S
TA
N D
AR
D
S
BR
AN
C
H D
ES
IG
N S
ER
VI
C
ES
S
EC
TI
O
N
APPROVAL
L A C
V1
C A L
IF
O R
N
IA
S T A T E P
R
IS
O N L O
S A
N G
E L E S C
O U
N T Y
T H
S T R
E E T , W
E S T
LA
N
C A S T E R
C A
R E P L A C
E R
O O
F S
P H
A S E
A U
G U S T
F
IN
A L D
R A W
IN
G
S
.1
BUILDING SECTION KEYNOTES
(N) METAL COPING AT PARAPET, SEE DETAIL
(E) EXHAUST FAN, REINSTALLED OVER NEW RAISED CURB, SMD.
(N) CRICKET
A-900
(N) PRIMARY SCUPPER AT LOWER ROOF
(N) ROOF HATCH, SEE DETAIL
(N) GUARDRAIL, SEE DETAIL
(E) MECHANICAL UNIT RE-INSTALLED OVER (N) RAISED CURB. SMD.
(N) 80 MIL, FULLY-ADHERED (CLASS A, UL 790) PVC ROOFING SYSTEM
OVER 1/2" PROTECTION BOARD OVER 6" MIN RIGID INSULATION.
(E) METAL DECK WITH CONCRETE FILL.
10 (E) PRECAST CONCRETE PLANK W/ CONCRETE TOPPING.
A901 TYP.
A-902
A-900
A900
A900
A902
A901
270 HOUSING UNIT BUILDING 334 - BUILDING SECTION
SCALE: 1/8" = 1'-0"
11 (E) LADDER TO REMAIN.
12 (E) BIRD DETERRENT CAGE.
13 (N) BIRD SCREEN FABRIC.
14 (N) GRAB BAR / RAILING
15 (E) DUCTWORK THRU ROOF, SMD K
MP801
16 (E) DUCTWORK TO BE REINSTALLED, SMD D
MP502
A901
A902
A902
V1
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
10/10/23
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
23-0002
11/20/2023 CASp 491 #1317
File details come from the government source that posted it. Updated .