21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf

PDF 385 KB Posted

Attached to
FPCM-LAC-I001104-M035-RS
Solicitation number
0000036277
Issued by
Los Angeles County, California

About this file

This document is a plumbing roof plan drawing for a California State Prison project located in Los Angeles County (Lancaster, CA), prepared by Turley Mechanical Engineering & Associates Group and Hibser Yamauchi Architects. The drawing specifically covers roof replacement work for Housing Unit Buildings 346-347, detailing rainwater drainage systems and roof area calculations for multiple roof sections (Areas A1 through A15 and Area C1), with total equivalent roof areas ranging from 150 to 2,200 square feet. The project is part of a Phase 1 roof replacement initiative for the California Department of Corrections and Rehabilitation (CDCR), focusing on precise drainage specifications, scupper placements, and compliance with 2022 California Plumbing Code requirements.

The technical drawing includes detailed calculations for rainwater drainage capacities, specifying drain pipe sizes, maximum protected roof areas, and overflow mechanisms. The design incorporates new and existing scupper conductor heads, with specific requirements such as minimum 10" wide by 4" high scupper openings and 3" roof drains. The document has received approval from the Office of the State Fire Marshal, with a fire and panic approval dated 10/10/23 and a final approval date of 11/20/2023. The project engineering was completed by Turley Mechanical Engineering, with the architectural work done by Hibser Yamauchi Architects, and the job number is JT 22107-PH1, indicating a specific phased approach to the facility's infrastructure improvements.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 61.8 2 3 4 5 7 118 9 10

A

B

C

B.4

F

D

E

H

G

J

K

K.8

L

M

1 111.8 2 3 4 5 6 7 8 9 105.7 7.3

A

B

B.7

D

E.7

G.3

J

K.7

L

M

K

H

E

C

F

G

(AREA C1)

700 SQ.FT. EQA

11 11 11

11 11 11

10 10 10

(AREA A1)(AREA A2) (AREA A3) (AREA A4)(AREA A5)

(AREA A15)

1150 SQ.FT. EQA

(AREA A14)(AREA A13) (AREA A12)(AREA A11)

650 SQ.FT.

EQA

(AREA A6)

250 SQ.FT.

EQA

(AREA A7)

250 SQ.FT.

EQA

(AREA A8)

200 SQ.FT.

EQA

(AREA A9)

450 SQ.FT.

EQA

(AREA A10)

10 10 10 10

1800 SQ.FT. EQA2200 SQ.FT. EQA 1600 SQ.FT. EQA1500 SQ.FT. EQA

1150 SQ.FT. EQA1800 SQ.FT. EQA 2200 SQ.FT. EQA 1600 SQ.FT. EQA

1500 SQ.FT. EQA

OPEN END OF HIGH

ROOF TO LOW ROOF

Project Engineer:

U R L E YT M E C H A N IC A L

E N G I N E E R I N G

G R O U P, I N C.& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capitol Avenue Sacramento, CA 95816

Project Manager:

GYang

Job Number:

Project Drafter: Login:

Plot Date: Aug 25, 2023 - 4:07pm

22107-PH1JT

JT

SHEET NUMBER

S

TA

TE

O

F C

A

LI

FO

R

N

IA

D E P A R

TM

E N

T O

F C

O R R

E C

TI

O

N S A

N D

R E H

A B

IL

IT

A

TI

O N

FA

C

IL

IT

Y P

LA

N

N

IN

G , C

O N

S

TR

U C

TI

O

N A

N D M

A N

A G

E M

E N

T D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G

N

SE

RV

IC

ES

S

EC

TI

O N

APPROVAL

L A C

V1

C A L

IF

O R

N

IA

S T A T E P

R

IS

O N

L O

S A

N G

E L E S C

O U N

T Y

T H

S T R

E E T , W

E S T

LA

N

C A S T E R

, C A

R E P L A C E R

O O

F S

P H

A S E

A U G

U S T

W O

R K

IN

G D

R A W

IN

G

S

.1

A rc h it e ct s, I n c.

H

IB

S E R Y

A M

A U C

H I n d S tr e e t, S u it e

D a vi s, C

A

.7

.1 o ff ic e

.7

.4 f a x

MPC302

P L U

M B

IN

G

H

U B

U

IL

D

IN

G S

T

H R U

R O

O F P

L A

N R

A

IN

W A

T E R

REMODEL KEY NOTES

01 (N) ROOF DRAIN RD-1 AND OVERFLOW DRAIN OFL-1. (N)DRAIN SIZE MATCH

(E) AND MIN 3". REFER TO ARCHITECTURAL DETAIL 12/A905.

#### EQA

NOTE

EQUIVALENT AREA OF ROOF AREA PLUS AREA OF VERTICAL

WALLS, PER CPC 1103.4, 2019.

PER US WEATHER BUREAU TECHNICAL PAPER NO.40 CHART 14:

100-YEAR 1-HOUR RAINFALL (INCH), LOCAL RAIN WATER FALL RATE

IS BETWEEN 0.5"/HR AND 1.0"/HR. WHILE CONSIDERING A SAFETY

FACTOR, 2"/HR RAINFALL IS USED IN THIS PROJECT.

PER 2022 CPC TABLE 1103.1 AND TABLE 1103.2, MAX PROTECTED

ROOF AREA OF PIPES ARE SHOWING BELOW:

PIPING MAX PROTECTED ROOF AREA (SQ.FT.)

SIZE HORIZONTAL SLOPE VERTICAL PIPING

(INCH) 1

8"/LF 1

4"/LF 1

2"/LF ROOF DRAIN, LEADER

2" - - - 1440 3" 1,644 2,320 3,288 4,400 4" 3,760 5,300 7,520 9,200 5" 6,680 9,440 13,360 17,300 6" 10,700 15,100 21,400 27,000

PER 2022 CPC 1101.12.2.1, WHEN SCUPPER OR SIDE OPENING IS

USED FOR OVERFLOW, HEIGHT OF OPENING SHALL BE NO LESS

THAN 4", AND WIDTH SHALL BE NO LESS THAN CIRCUMFERENCE OF

THE ROOF DRAIN REQUIRED FOR THE AREA SERVED.

AN ALTERNATIVE MEANS IS USING SCUPPER INSTEAD OF THE ROOF

DRAIN FOR THE PRIMARY RAINWATER DRAINAGE. ALTERNATIVE

MEANS IS UNDER THE AGREEMENT WITH OF CDCR PROJECT

MANAGER. IN THIS CASE, HEIGHT OF OPENING SHALL BE NO LESS

THAN 4", AND WIDTH SHALL BE NO LESS THAN CIRCUMFERENCE OF

THE ROOF DRAIN REQUIRED FOR THE AREA SERVED. WHERE ROOF

DRAIN AND SCUPPER ARE COMBINED, THE HEIGHT OF OPENING

MUST BE A MINIMUM OF TWICE THE REQUIRED HEIGHT (MIN OF 8").

THE ABOVE DATA ARE ONLY MINIMUM REQUIREMENT OF DRAINS

AND PIPES. THEY CAN BE OVERSIZED IN THE PROJECT.

RAIN WATER CALCULATION

FOR AREA A1 THRU A15, MAX TOTAL EQUIVALENT ROOF AREA IS

2,200 SQ.FT. A MIN 3" ROOF DRAIN OR MIN 10"Wx4"H SCUPPER

OPENING IS SUFFICIENT TO SUPPORT EACH AREA. MIN OVERFLOW

SIDE WALL OPENING IS 10"Wx4"H. THE NEW PRIMARY AND

SECONDARY SIDE WALL OPENING ARE MEET THE CODE

REQUIREMENT.

FOR AREA C1, MAX TOTAL EQUIVALENT ROOF AREA IS 700 SQ.FT.

MIN 3" ROOF DRAIN AND 3" OVERFLOW DRAIN ARE SUFFICIENT TO

SERVE THE AREA.

11 (E) SCUPPER CONDUCTOR HEAD, MODIFY AS NEEDED FOR NEW SCUPPER

OPENING LOCATION

12 (N) SCUPPER CONDUCTOR HEAD, SIZE MATCH OTHER (E) CONDUCTOR HEAD ON

THE SAME WALL. INSTALLATION DETAILS SEE 4/S501.

N

N

BUILDING 347BUILDING 346

(E) OR (N) PRIMARY SCUPPER AND (N)OVERFLOW SCUPPER FOR LOW ROOF.

EACH SCUPPER OPENING SHALL BE MIN 10"WIDE x 4"HIGH. THE LOCATION

OF (N) PRIMARY SCUPPER SHALL MATCH (E) OR (N)SCUPPER CONDUCTORS.

SEE ARCHITECTURAL DETAIL 28/A905.

V1

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp-491 #1317

File details come from the government source that posted it. Updated .