21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf

PDF 556 KB Posted

Attached to
FPCM-LAC-I001104-M035-RS
Solicitation number
0000036277
Issued by
Los Angeles County, California

About this file

This document is a structural engineering detail sheet (Sheet S501) for a California Department of Corrections and Rehabilitation (CDCR) project located at California State Prison, Los Angeles County in Lancaster, CA. The sheet titled "TYPICAL DETAILS" provides comprehensive technical drawings for roof replacement work (Phase 1), specifically focusing on concrete repair, wall modifications, and structural reinforcement techniques. The project is associated with Job Number 21-040 and Project Number 5843.1, with design work completed by Hibser Yamauchi Architects, Inc. on August 31, 2023.

The detailed drawings include specific technical specifications for sawcut openings in existing concrete walls, concrete deterioration repair methods, pipe supports, wall extensions, and various structural connection techniques. Key technical elements include using epoxy dowels (Hilti HIT-HY 200), specific rebar placement requirements, galvanized steel components, anchor bolt specifications (Hilti Kwik Bolt TZ2), and precise measurements for wall and pipe modifications. The drawings have received approvals from the California Office of the State Fire Marshal (approval dated 10/10/23) and include a CASp (Certified Access Specialist) tracking number, indicating compliance with accessibility standards.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOWEL #4 BARS

INTO (E) CONC

CENTER SAWCUT

WITH (E) BM BELOW

(N) 3500 PSI LW CONC,

DEPTH TO MATCH EXISTING

(N) #4 @ 18"CC EA WAY

(N) 16GA DECK, DEPTH

TO MATCH EXISTING

PUDDLE WELD TO EVERY

LOW FLUTE @ 12"CC

(E) CONC TO BE

REMOVED TO CREATE

(N) OPENING

DRILL 1 1/2"Ø MAX

HOLE EA CORNER

PRIOR TO CHIPPING

SAWCUT EDGES CHIP

REMAINING AND REMOVE

REMAINING WEDGES,

DO NOT OVERCUT

(E) PRECAST CONC

WALL TO REMAIN

OPENING

SAWCUT OPENING IN EXISTING WALL

NOTE:

OPENING TO BE MAX 8"x18" @ SCUPPERS AND MAX 14"x25" @ ACCESS PANEL

#5 HORIZ BAR

S E E P

L A N

(E) PRE-CAST CONCRETE

WALL PER PLAN

EPOXY DOWELS

w/ HILTI HIT-HY 200

FOR CONTROL JOINT SEE

CMU TO MATCH WALL

THICKNESS w/ #5 VERTS @

8"CC TYP GROUT ALL CELLS

NOTE:

CONTRACTOR TO AVOID REBAR

IN (E) PRECAST WALL

3"

SAWCUT OR BUILD UP GROUT

BED AT TOP OF (E) CONC WALL

TO CREATE LEVEL SURFACE

S501w A R

C H

V E R

IF

Y

E M

B E D

4" 4"

VERTICAL BARS

CLEAR SPACE OR

COMPRESSABLE

MATERIAL IN JOINT

CL WCJ

SEE NOTES

CMU WALL GROUT

ALL CELLS

PREFORMED JOINT

FILLER

BACKING ROD AND

JOINT SEALANT

NOTE:

LOCATE CONTROL JOINTS IN ALIGNMENT WITH (E) WALL CONTROL JOINTS

PER 6/S501

M

A X

M

IN

A X

2" PL1/2x2x0'-4"

PL1/2x4x1'-3" w/ 3/4"Ø

HOLES FOR ANCHOR

ON 12 GA STEEL OR

EQUIVALENT

NOTES:

1. EXPOSED STEEL SHALL BE HOT DIP GALVANIZED.

2. ALL ANCHORS SHALL BE 5/8"ØSS HILTI KWIK BOLT

TZ2 w/ 3 1/4" EMBED, (2 PER BRACKET)

3. FOR 5/8"Ø ANCHORS TEST TO 60#-FT TORQUE.

4. BUSH HAMMER CONC FLAT AT ANCHOR POINT.

1 1/2"Ø STD PIPE

RAILS, SEE ARCH

HSS2.500x0.250

POST @ 6'-0" MAX

1/4

M

IN

.1 1/2"

" 4

1 1/2"1'-0"

1/4

TYP

(E) PRECAST CONC

WALL PER PLAN

CMU WALL EXTENSION

PER

S501

3" 1'-0"

A

A

(E) PRECAST CONC WALL

DRILL & EPOXY (5) #4 DOWELS

w/ 3" EMBED @ (E) PRECAST

CONC WALL

(3) #4 BARS @ 3"CC

CONC SCUPPER

VERIFY w/ ARCH

1'-0"

(E) PRECAST CONC WALL

SCUPPER OPNG PER

S501

SECTION A-A

6"

TYP

1"

EQ EQ

CL PIPE

T Y P

E Q

E Q

C L P

IP

E

PIPE POST

3/16

SECTION A-A

(4) 3/8"Ø HILTI KB-TZ2

w/ 2"EMBED

A A

(E) CONC o/ MTL DECK

STEEL TUBE 1 1/2x1 1/2x10GA

1/8

TUBE TO

TUBE TYP

STEEL GRATING,

SEE ARCH

STEEL TUBE 1 1/2x3x10GA

1/8

TUBE TO

PIPE TYP

M

IN1

1 1/4"Ø STD PIPE

POST, SEE ARCH

3/16

PIPE TO

PL TYP

PL1/4x2 1/2"Ø

BASE PL8x8x1/4;

1/6"OVERSIZED

HOLE TYP

BASE PL8x8x1/4;

1/6"OVERSIZED

HOLE TYP

1 1/2"Ø STD PIPE

POST, SEE ARCH

/2

/2

3/16

PL TO PL;

(3) SIDES

BENT PL1/4x4" LONG

(E) PIPE

OUTSIDE Ø+1"

(E P

IP

E O

U T S

ID

E Ø

M A X

/2

BENT PL1/4x3"x0'-8"x4"

LONG LLV

(2) 3/8"Ø HILTI KB-TZ2 SS

w/ 2" EMBED (E) CONC WALL

6" MIN

SECTION A-A

M

A X

C L E P

IP

E

A

A

(2) 3/8"Ø HILTI KB-TZ2 SS

w/ 2" EMBED

(E) CONC WALL

(E) PIPE

PIPE SUPPORT @

10'-0" CC MAX

2" 2"

(E) CONC CURB

#4 HORIZ BAR

E M

B E D

IN

C L R

/2

(E) WATER

HEATER LEG

3/4" CHAMFER TYP

CURB EXTENSION

WHERE NEEDED FOR

ROOFING MINIMUMS

(E) COND o/ MTL DECK

1/4

PL TO PL;

TYP

#4 VERT @ 12"CC w/ STD

HOOK; EPOXY DOWELS

w/ HILTI HIT-HY200

2" 10"

1/4

PL TO PL;

TYP

PL1/2x3x0'-6" EA SIDE OF LEG w/ (2) 3/4"Ø A307 BOLTS

MATCH IN FIELD SPACING

(E) WATER HEATER LEG

PL1/2x12x1'-2"

PL1/2x12x1'-2" EA SIDE OF CURB w/ (2) 3/4"Ø

THRU BOLTS

S

S TA TE OF CAL I FOR N I A

STRUCTURAL

R

EFORP

DERETSI

GE

SI N

ENGINEER

O AL

D E

PA

R T M E N T

O F

CO

RRE

CT IONS AND

REHA

B

IL

IT

A T

IO

N

S T

A T E

OF CAL I F

OR

N

I A

A rc h ite ct s, I n c.

H

IB

SE

R Y

A M

A U C

H I n d S tr ee t, S u ite

D a vi s, C

A

.7

.1 o ff ic e

.7

.4 fa x

600 Q STREET, SUITE 200

SACRAMENTO, CA 95811

916 443 0303

CALIFORNIA DEPARTMENT OF

CORRECTIONS AND REHABILITATION

ACCESS COMPLIANCE REVIEW

APPROVAL OF THIS PLAN DOES NOT

AUTHORIZE OR APPROVE ANY OMISSION OR

DEVIATION FROM THE APPLICABLE REGULATIONS.

TRACKING NUMBER:___________________

DATE:____________________________

REVIEWER:_________________________

APPROVAL

F

IN

A L D

R A W

IN

G

S

SHEET NUMBER

TA

TE

O

F C A

LI

FO

R

N

IA

D E P A R

TM

E N

T O

F

C O

R R

E C

TI

O

N S A

N D

R E H

A B

IL

IT

A

TI

O N

FA

C

IL

IT

Y P

LA

N

N

IN

G , C

O N

S

TR

U C

TI

O N

A N

D M

A N

A G

E M

E N T

D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G N

SE

RV

IC

ES

S

EC

TI

O

N

R E V

D

T

S C R

IP

T

IO

N

L A C

V1

C A L

IF

O R

N

IA

S T A T E P

R

IS

O N

L O

S A

N G

E L E S C

O U N

T Y

T H

S T R

E E T, W E S T

LA

N

C A S T E R , C

A

R E P L A C

E R

O O

F

P H

A S

C

C R

P H A S E

J O B

N U M B E R

T E A

U G

U S T

P ro je c t N o

.1

P ro je c t

P h a s e

H E E T

T

IT

L

M. TODD

THORP

No. 2990

/1

/2

:3

:4

A

M c re v it \2

-0

.0

C D

C R

L A P

H R C

E N

T R A L d d ir e .r v t

T Y P

IC

A L D

E T A

IL

S

S501

APPLICABLE TO ALL DRAWINGS UNLESS NOTED OR SHOWN OTHERWISE

TYPICAL DETAILS

DETAIL

S501

1" = 1'-0"1

CONCRETE DETERIORATION REPAIR

DETAIL

S501

3" = 1'-0"5 329SD012 - Sawcut Opening in (e) Slab or (e) Wall

DETAIL

S501

1" = 1'-0" 6 Drafting 1

DETAIL

S501

1" = 1'-0"7 Drafting 2

DETAIL

S501

1" = 1'-0"3 Drafting 5

DETAIL

S501

1" = 1'-0"4 Drafting 3

DETAIL

S501

1" = 1'-0"9 Drafting 6

DETAIL

S501

1" = 1'-0"2 Drafting 11

DETAIL

S501

1" = 1'-0"10 Drafting 14

09/15/2023

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp-491 #1317

File details come from the government source that posted it. Updated .