21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf

PDF 781 KB Posted

Attached to
FPCM-LAC-I001104-M035-RS
Solicitation number
0000036277
Issued by
Los Angeles County, California

About this file

This document is a set of architectural drawings for the California Department of Corrections and Rehabilitation's roof replacement project at California State Prison, Los Angeles County (LAC) located in Lancaster, CA. The final drawings, dated August 31, 2023, detail specific roof and structural modifications including a stair cage, mechanical bird deterrent cage, and gun post area, with detailed plans for roofing surface replacements, flashing, and structural supports. The project is focused on Phase 1 of roof replacements, with precise scaled drawings showing elevations, sections, and plan views of various structural elements.

The drawings were approved by the Office of the State Fire Marshal on 10/10/23 with the project number 23-0002, and include technical specifications for roofing materials such as PVC roofing assembly, galvanized metal screens, and continuous caulking. The plans indicate careful preservation of existing structural elements like precast concrete walls, catwalk, and structural support framing, with specific instructions for new installations and modifications. The document includes detailed technical annotations for roof termination strips, flashing, and specific dimensional requirements, suggesting a highly technical and precise approach to the facility's infrastructure improvements.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STAIR CAGE ENLARGED PLAN

SCALE: 1/2" = 1'-0"

TOP OF METAL COPING

ROOF FINISH

SURFACE

ATTACHMENT, SEE SECTION A

GALVANIZED

METAL SCREEN

(E) PRECAST

CONC. WALL

SECTION A

B

18'-6"

TOP OF (E) PARAPET

TOP OF (E) DECK

STAIR CAGE

FRAME PER

STRUCTURAL

STAIR CAGE

18'-6"

T.O. (E) PARAPET

ELEVATION - A

PLAN

7'-6"

STAIR CAGE FRAME

PER STRUCTURAL

STAIR CAGE DOOR

GALV. METAL ROOF

MATCH (E) SLOPE

STAIR CAGE DOOR

SECTION - B

GALV. METAL ROOF

MATCH (E) SLOPE

A

B

ELEVATION - B

DN

GALVANIZED

METAL SCREEN

BEYOND

(E) PRECAST

CONC. WALL

SECTION - C

C

/1

V E

R

IF

Y

(E) PRECAST

WALL BEYOND

REMOVE AND REINSTALL

STAIR CAGE FRAME PER

STRUCTURAL

(E) STAIR

(E) CONC.

DECK

T.O. (E) WALL

VERIFY

(N) CMU WALL

EXTENSION ,

ALIGN / FLUSH W/

T.O. (E) PARAPET

SEE DET.

A904

17'-1"

T.O CONC. SLAB

(E) STAIR C12

STRINGER

(E) METAL

GRATING

(E) ROOF

STRUCTURE

(E) CMU WALL

PVC ROOF

MEMBRANE

GUARDRAIL

BEYOND

(E) HANDRAIL

TO REMAIN

V A

R

IE

S

(E) HANDRAIL

TO REMAIN

18'-6"

T.O. (E) PARAPET

A

1.8 2

1.8 2

1.8 2 A

2 1.8

A

MECHANICAL BIRD DETERRENT CAGE ENLARGED PLAN

SCALE: 1/2" = 1'-0"

ROOF FINISH

SURFACE

GALVANIZED

METAL SCREEN

(E) PRECAST

CONC. WALL

B

BIRD CAGE

T.O. (E) PARAPET

T.O. (E) PARAPET

ELEVATION - A

PLAN

CAGE FRAME

PER STRUCTURAL

CAGE DOOR

GALV. SHEET METAL ROOF

MATCH (E) SLOPE

MECH BIRD CAGE DOOR

SECTION - B

A

MECH UNIT

LADDER

OPEN

PARAPET

14'-0" (VERIFY)

(E) FRAME

B

STAIR

PLAN

A

B

(N) PVC ROOFING

ASSEMBLY, SEE DETAIL

(E) PRECAST CONCRETE WALL TO REMAIN

(E) CONCRETE PLANK W/ CONCRETE TOPPING

V E

R

IF

Y

SECTION - 1

(N) PVC ROOFING

ASSEMBLY, SEE DETAIL

A900

(E) CONCRETE WALL

T.O.(E) CONC. DECK

AT LOW ROOF

(E) ROOF DECKING

GUN POST

SCALE: 1/2" = 1'-0"

(E) CATWALK

C

D

1 1.8

1 1.8

(E) GUN POST

TO REMAIN.

A900

GUN POST

(E) STRUCTURAL

SUPPORT FRAMING

TO REMAIN

18'-6"

T.O.(E) PRECAST CONC.

WALL

TERMINATION

STRIP AT (E)

COPING,

SEE DETAIL

(N) VERTICAL FULLY

ADHERED FLASHING

TERMINATION STRIP AT COPING

SCALE: 3'-0" = 1'-0"

(E) PARAPET

(E) GSM COPING CAP

(N) FASTENERS

(N) CONT CAULKING, TYP.

(N) 22 GA GSM

COUNTER FLASHING

CONT. ALUMINUM TERMINATION

BAR W/ FASTENER

KEEP (E) VERTICAL MEMBRANE

IF EXISTS. OVERLAP NEW

MEMBRANE FLASHING WITH

CONT. TERMINATION BAR.

A903

D E T A

IL

S

SHEET NUMBER

S

TA

TE

O

F C

A

LI

FO

R

N

IA

D E

P A

R

TM

E N

T O

F C

O R

R E

C

TI

O N

S A

N D

R E

H A

B

IL

IT

A

TI

O

N

FA

C

IL

IT

Y

P

LA

N N

IN

G

, C O

N S

TR

U

C

TI

O N

A N

D M

A N

A G

E M

E N

T D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G

N

SE

RV

IC

ES

S

EC

TI

O N

APPROVAL

L A C

V1

C A

L

IF

O R

N

IA

S T

A T

E P

R

IS

O N

L O

S A

N G

E L E

S C

O U

N T

Y

T

H S

T R

E E

T , W

E S

T

LA

N C

A S

T E

R , C

A

R E

P L

A C

E R

O O

F S

P H

A S

E

A U

G U

S T

F

IN

A L D

R A

W

IN

G S

.1

V1

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp-491 #1317