21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf

PDF 911 KB Posted

Attached to
FPCM-LAC-I001104-M035-RS
Solicitation number
0000036277
Issued by
Los Angeles County, California

About this file

This document is a detailed architectural drawing set from the California Department of Corrections and Rehabilitation (CDCR) for the Replace Roofs - Phase 1 project at California State Prison, Los Angeles County (LAC), located in Lancaster, California. The drawing set, dated August 31, 2023, and approved by the Office of the State Fire Marshal on 10/10/23, provides comprehensive technical specifications for roof replacement, including raised parapet/curb extensions, single-ply roof assemblies, cricket assemblies, scupper installations, and walkpad details. The drawings specify the use of new PVC roofing membrane, rigid insulation, protection boards, and associated metal components for both low and high roof areas.

The technical drawings indicate a systematic approach to roof replacement, with detailed cross-sections showing layered roofing components, slope specifications (typically 1/2":1'-0"), and specific materials like siliconized gypsum sheathing, fiberglass facer matting, and galvanized sheet metal components. The project involves replacing existing roof systems while maintaining structural integrity, with particular attention to water drainage, insulation, and weatherproofing. The drawings include precise measurements, material specifications, and installation guidelines for various roof elements, suggesting a comprehensive renovation of the facility's roofing infrastructure.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RAISED PARAPET/CURB EXTENSION

SCALE: 1 1/2" = 1'-0"

21'-6"

T.O. (E) PRECAST CONCRETE WALL

(N) PVC ROOFING

ASSEMBLY,

SEE DETAIL

A900

(E) PRECAST CONCRETE WALL

(N) TERMINATION BAR W/

FASTENER BY ROOFING MFR.

(N) PVC FLASHING TO WRAP OVER

PARAPET

HEAT WELD PVC FLASHING

TO ROOF MEMBRANE

8"

(E) METAL DECK W/

LIGHT WEIGHT

CONCRETE

TOPPING

S501

A902

(N) 22 GA G.S.M. COPING

CAP. SEE DETAIL

(N) CMU PARAPET

EXTENSION, SSD

M

IN

T.O. (N) PARAPET EXTENSION

(N) STEEL DOWEL

SINGLE PLY ROOF ASSEMBLY

SCALE: 3" = 1'-0"

(N) 1/2" PROTECTION

BOARD. BOARD TO BE

SILICONIZED GYP.

SHEATHING W/

FIBERGLASS FACER

MATT., FULLY ADHERED

(N) PVC MEMBRANELAP MEM. PER

MFR. REQ'S.

(N) 6" MIN. (R-30)

RIGID INSULATION,

EACH LAYER FULLY

ADHERED

(N) ADHESIVE PER

ROOFING MFR.

(E) CONC. ROOF DECK

(1988 UBC 43-C,

ITEM 1-1.1)

(N) PVC MEMBRANE

LAP MEM. PER MFR.

REQ'S.

(N) 6" MIN. (R-30)

RIGID INSULATION,

EACH LAYER FULLY

ADHERED

(N) ADHESIVE PER

ROOFING MFR.

(E) METAL DECK

WITH CONCRETE

TOPPING. (U.L. #D902)

A

B

(N) 1/2" PROTECTION

BOARD. BOARD TO BE

SILICONIZED GYP.

SHEATHING W/

FIBERGLASS FACER

MATT., FULLY ADHERED

OCCURS ON LOW ROOF

OCCURS ON HIGH ROOF

(N) VAPOR

RETARDANT

(N) STACKED TAPERED RIGID

INSULATION BOARD - FULLY

ADHERED

(N) PVC ROOFING SLOPED

TO DRAIN, SEE DETAILS THIS

SHEET

(N) 1/2" RIGID SILICONIZED

GYPSUM-SHEATHING BOARD,

WITH FIBERGLASS FACER.

ADHERE TO INSULATION

(N) PVC ROOFING

MEMBRANE, ADHERE TO

PROTECTION BOARD

1/2":1'-0"

S

LO

P E

1/2":1'-0"

SLOPE

1/2":1'-0"

S

LO

P E

1/2":1'-0"

SLOPE

1/2":1'-0"

S

LO

P E

1/2":1'-0"

SLOPE

NOTE: CRICKET RIDGE IS HORIZONTAL, TYP.

CRICKET ASSEMBLY

SCALE: 1/2" = 1'-0"

PVC UNIVERSAL

CORNERS

PVC ROOFING

ASSEMBLY,

SEE

PVC COATED

GALVANIZED SHEET

METAL (24 GA. MIN.)

PVC COVER STRIP

OVER COATED

METAL

SCUPPER ISOMETRIC

SCALE: N.T.S.

FIRE RETARDANT

TREATED WOOD

NAILER

PVC FLASHING

MEMBRANE,

SEE DETAIL

12"

12"

M

IN

4" MIN

WALKPAD INSTALLATION

SCALE: N.T.S.

(N) PVC WALKPAD HEAT WELDED IN PLACE ALL 4

SIDES. DO NOT CROSS FIELD SEAMS. START AND

STOP WALK PAD INSTALLATION 2" FROM FIELD

SEAM.

(N) PVC FIELD SEAM

(N) PVC WALK PAD

(N) PVC FIELD

MEMBRANE

(N) HEAT WELDED OUTSIDE

EDGE

(N) 12" PROTECTION BOARD

(N) 6" MIN. RIGID INSULATION

NOTES:

1. (N) 22 GA. GALV. S.M. COPING & REGLETS TO

BE PAINTED. COLORS TO MATCH EXISTING.

3. SOLDER ALL JOINTS.

SCUPPER AT LOWER ROOF-NEW

SCALE: 3" = 1'-0"

SLOPE DN

1/2":1'-0"

(N) HEAT WELDED LAPS

PER MANUFACTURER

REQUIREMENTS

(N) PVC ROOFING

ASSEMBLY, SEE DETAIL

A900 (N) HEXAGON HEAD,

SLOTTED DRIVE, SELF-TAPPING

CONCRETE SCREW

W/ 1-1/2" MIN EMBED.,

@ 24" O.C., TYP.

(N) BACKER ROD AIR SEAL

ON ALL FOUR FLANGES

(N) ADHESIVE COLD APPLIED MEMBRANE

(N) 22 GA GALV. S.M. COPING CAP, SEE DETAIL

A902

(E) PRECAST CONCRETE

WALL TO REMAIN

(E) CONCRETE PLANK W/

CONCRETE TOPPING

18'-6"

T.O. (E) PRECAST

CONCRETE WALL

(N) SCUPPER TO MATCH

(E) EXISTING SCUPPER

8"

(N) SCUPPER S.S.D.

ELEVATION - B

(E) CONC. PLANK

(E) CONC.

TOPPING SLAB

TOP OF (E) DECK

/2

M

IN

A

LONG SECTION - C

S501

(N) OVERFLOW

SCUPPER

SLOPE DN

1/2":1'-0"

1'-0" 3" 1/2"

1'-6"

3" 1/2"

/2

/2

ELEVATION - A C

(N) OVERFLOW SCUPPER

TOP OF PRIMARY SCUPPER

10"

4"

B

SLOPE DN

4"

M

IN

(N) STEEL DOWEL, SSD

SLOPE DN

(N) HEAT WELDED LAPS

PER MANUFACTURER

REQUIREMENTS

4"

10"

CONDUIT/PIPE SUPPORT

SCALE: NTS

USE APPROPRIATE COMPATIBLE

COMPONENTS CLAMP W/ BOLT AND

NUTS PER MANUF.

(N) PVC ROOFING

ASSEMBLY, SEE DETAIL

RUBBER BASE PIPE SUPPORTS

(DURA-BLOK #DB10 BY EATON, OR

EQUAL)

(E) PIPE/CONDUIT, SIZE VARIES

1" GALVANIZED STEEL CHANNEL

(E) CONCRETE ROOF

DECK

(N) PVC WALKPAD HEAT

WELDED IN PLACE, SEE

DETAIL

A900

D E T A

IL

S

SHEET NUMBER

S

TA

TE

O

F C

A

LI

FO

R

N

IA

D E P A R

TM

E N

T O

F C

O R

R E C

TI

O

N S A

N D

R E H

A B

IL

IT

A

TI

O N

FA

C

IL

IT

Y P

LA

N

N

IN

G , C

O N

S

TR

U C

TI

O

N A

N D

M A N

A G

E M

E N

T D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G

N

SE

RV

IC

ES

S

EC

TI

O N

APPROVAL

L A C

V1

C A L

IF

O R

N

IA

S T A T E P

R

IS

O N

L O

S A

N G

E L E S C

O U

N T Y

T H

S T R

E E T , W

E S T

LA

N

C A S T E R

, C A

R E P L A C

E R

O O

F S

P H

A S E

A U

G U

S T

F

IN

A L D

R A W

IN

G

S

.1

V1

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp-491 #1317

File details come from the government source that posted it. Updated .