21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf

PDF 2 MB Posted

Attached to
FPCM-LAC-I001104-M035-RS
Solicitation number
0000036277
Issued by
Los Angeles County, California

About this file

This document is an electrical sheet for a roof replacement project for the California State Prison, Los Angeles County (LAC), prepared by M. Neil Engineering. The project involves replacing roofs for multiple housing units (Buildings 334, 336, and 337) at the prison facility located in Lancaster, California. The design is part of Phase 1 of the roof replacement work, dated August 29, 2023, with working drawings finalized on August 31, 2023. The electrical drawings provide detailed specifications for demolition, remodeling, and electrical system modifications, including conduit routing, voltage drop calculations, and compliance with various California building and electrical codes.

The project is governed by multiple 2022 California building standards, including the California Building Standards Administrative Code, California Electrical Code (based on the 2020 National Electrical Code), and other relevant state and local regulations. The electrical design includes specific requirements for existing equipment handling, utility shutdowns, coordination with other trades, and safety protocols. The drawings include comprehensive electrical symbol lists, abbreviations, demolition notes, and a branch circuit voltage drop table to ensure compliance with technical standards. The project has received approval from the Office of the State Fire Marshal, with a fire and panic approval issued on October 10, 2023.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EA01

ELECTRICAL SHEET INDEX, SYMBOL LIST, ABBREVIATIONS, AND DEMOLITION

GENERAL NOTES

EA201

No. OF

SHEETS

DRAWING

No.

DRAWING DESCRIPTIONS

ELECTRICAL SHEET INDEX

TYPICAL 270 HOUSING UNIT ROOF PLAN - DEMOLITION - ELECTRICAL

EA301 TYPICAL 270 HOUSING UNIT ROOF PLAN - REMODEL - ELECTRICAL

CONDUIT RUN CONCEALED IN CEILINGS OR WALLS. NUMBER OF HASH MARKS DENOTES

QUANTITY OF WIRES. CURVED HASH MARK DENOTES QUANTITY OF #12 GREEN GROUND

WIRES. CONDUCTORS OTHER THAN #12 ARE INDICATED ON PLANS. NO HASH MARKS

DENOTES 2 #12 AWG AND 1 #12 GREEN GROUND IN 1/2" CONDUIT. TYPICAL FOR ALL

CONDUITS.

CONDUIT RUN UNDERFLOOR OR UNDERGROUND MINIMUM 1" DIAMETER.

CONDUIT HOMERUN TO PANELBOARD, SWITCHBOARD OR TERMINAL CABINET

CONDUIT TURNED AND RISED UP

CONDUIT TURNED AND DROPPED DOWN

EXISTING CONDUIT AND WIRING

EQUIPMENT DISCONNECT SWITCH - EXTERNALLY OPERATED, NON-FUSIBLE

DRAWING SHEET NUMBERED NOTE DESIGNATION - APPLIES TO NUMBERED NOTE ON SAME

SHEET

DRAWING PLAN OR DETAIL DESIGNATION - "1" OR "A" DENOTES PLAN OR DETAIL NUMBER,

"E-1" DENOTES SHEET NUMBER

E-1

SYMBOL LIST NOTES:

1. EXISTING ELECTRICAL EQUIPMENT, OUTLETS, AND DEVICES ARE SHOWN THE SAME AS NEW, EXCEPT LIGHTLY AND ACCOMPANIED BY (E). SUCH ELECTRICAL EQUIPMENT, OUTLETS, AND DEVICES ARE TO

REMAIN AS IS, UNLESS OTHERWISE NOTED ON PLAN OR SPECIFICATION.

FLEXIBLE CONDUIT CONCEALED. NUMBER OF HASH MARKS DENOTES QUANTITY OF WIRES.

CURVED HASH MARK DENOTES QUANTITY OF #12 GREEN GROUND WIRES. CONDUCTORS

OTHER THAN #12 ARE INDICATED ON PLANS. NO HASH MARKS DENOTES 2 #12 AWG AND 1 #12

GREEN GROUND IN 1/2" MINIMUM DIAMETER CONDUIT.

CONDUIT WITH CAP

CONDUIT STUB WITH INSULATED BUSHING

EXISTING CONDUIT TO BE REMOVED OR ABANDONED, REMOVE WIRES. COORDINATE WITH

OWNER.

ELECTRICAL SYMBOL LIST

A AMPERES

AC ALTERNATING CURRENT

A.F.F. ABOVE FINISHED FLOOR

A.I.C. AMPERE INTERRUPTING CAPACITY

AMP AMPERE

AWG AMERICAN WIRE GAUGE

BKR BREAKER

C. CONDUIT

C.B. CIRCUIT BREAKER

CD CANDELA

CKT CIRCUIT

C.O. CONDUIT ONLY, WITH PULL WIRE

C.T. CURRENT TRANSFORMER

DC DIRECT CURRENT

(E) EXISTING

EL EVENING LIGHT

EM EMERGENCY

(ER) EXISTING RELOCATED

EMT ELECTRICAL METALLIC CONDUIT

(F) FUTURE

FACP FIRE ALARM CONTROL PANEL

FAPS FIRE ALARM POWER SUPPLY

FATC FIRE ALARM TERMINAL CABINET

GA. GAUGE

GND GROUND

GFCI GROUND FAULT CIRCUIT INTERRUPTER

HP HORSEPOWER

HVAC HEATING, VENTILATING AND AIR

CONDITIONING

HZ. HERTZ (CYCLES/SEC)

Isc SHORT CIRCUIT AMPERES

ISO ISOLATED

K THOUSAND

KV KILO VOLT

KVA KILO VOLT AMPERE

KW KILO WATT

KWH KILO WATT HOUR

LT. LIGHT

LV LOW VOLTAGE

MAX. MAXIMUM

MDF MAIN DISTRIBUTION FRAME

MFR. MANUFACTURER

MIN. MINIMUM

MTD. MOUNTED

N NEUTRAL

(N) NEW

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

N.I.C. NOT IN CONTRACT

NL NIGHT LIGHT

NM NON-METALLIC CABLE

PFB PROVISIONS FOR FUTURE CIRCUIT

BREAKER

PH PHASE

(R) REMOVE

(RE) RELOCATE EXISTING

RCPT. RECEPTACLE

RSC RIGID STEEL CONDUIT

S.M.S SHEET METAL SCREW

SWBD SWITCHBOARD

SYS SYSTEM

TV TELEVISION

TYP. TYPICAL

UG UNDERGROUND

UL UNDERWRITERS LABORATORY

V VOLT

VA VOLT-AMPERES

VIF VERIFY IN FIELD

W WIRE, WATT

WP WEATHER PROTECTED

WR WEATHER RESISTANT

XFMR TRANSFORMER

ABBREVIATIONS

DUPLEX CONVENIENCE OUTLET - NEMA 5-20R. TYPICAL FOR ALL CONVENIENCE OUTLETS,

UNLESS NOTED OTHERWISE.

EB201

EB301

FACILITY A 270 HU BUILDING 334 ROOF PLAN - DEMOLITION - ELECTRICAL

ELECTRICAL DETAILS

BRANCH CIRCUIT VOLTAGE DROP TABLE

MAXIMUM BRANCH

CIRCUIT LENGTH

CONDUCTOR SIZE

MAXIMUM CIRCUIT

LOAD FOR 20 AMP

CIRCUIT BREAKER

120 VOLT

#8 AWG

VOLTAGE

9 AMPS (1.08 KVA)

240 VOLT

9 AMPS (2.16 KVA)

#10 AWG

#12 AWG

#8 AWG

#10 AWG

#12 AWG

115 FEET

180 FEET

285 FEET

210 FEET

135 FEET

85 FEET

IN LIEU OF VOLTAGE DROP CALCULATIONS FOR EACH BRANCH CIRCUIT IN SCOPE OF WORK, THE GENERAL

DESIGN STANDARD BELOW HAS BEEN FOLLOWED TO ENSURE A VOLTAGE DROP OF 3% IS NOT EXCEEDED.

WHERE THE CIRCUIT LOAD OR CIRCUIT LENGTH LISTED HAS BEEN EXCEEDED, A DETAILED VOLTAGE DROP CALCULATION FOR THAT CIRCUIT HAS BEEN PROVIDED WITH THE TITLE 24 COMPLIANCE DOCUMENTATION.

#8 AWG

#10 AWG

#12 AWG

#8 AWG

#10 AWG

#12 AWG

200 FEET

330 FEET

510 FEET

380 FEET

250 FEET

150 FEET

12 AMPS (1.44 KVA)

12 AMPS (2.88 KVA)

#8 AWG

#10 AWG

#12 AWG

130 FEET

85 FEET

55 FEET

#8 AWG

#10 AWG

#12 AWG

285 FEET

185 FEET

110 FEET

16 AMPS (1.92 KVA)

16 AMPS (3.84 KVA)

208 VOLT

9 AMPS (1.87 KVA)

#8 AWG

#10 AWG

#12 AWG

#8 AWG

#10 AWG

#12 AWG

170 FEET

285 FEET

440 FEET

330 FEET

215 FEET

130 FEET

12 AMPS (2.49 KVA)

#8 AWG

#10 AWG

#12 AWG

250 FEET

160 FEET

95 FEET

16 AMPS (3.33 KVA)

E9.001

GFCI DUPLEX CONVENIENCE OUTLET - NEMA 5-20R

1. INFORMATION SHOWN RELATIVE TO EXISTING CONDITIONS IS BASED UPON AVAILABLE RECORDS AND

DATA. THEREFORE, IT SHALL BE REGARDED AS AN APPROXIMATION ONLY. CONTRACTOR AGREES THAT IN

ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONTRACTOR WILL BE

REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE

COURSE OF CONSTRUCTION OF THE PROJECT. PRIOR TO SUBMITTING BID AND/OR BEFORE START OF ANY ELECTRICAL WORK, INSPECT ALL EXISTING LOCATIONS AND CONDITIONS AND ASCERTAIN WORK

REQUIRED TO CLEAR PROJECT AREA OF ALL EXISTING ELECTRICAL ITEMS NOT BEING REUSED OR

EXISTING TO REMAIN AS IS. REPORT ALL DISCREPANCIES AND COORDINATE ALL DEMOLITION WORK WITH THE OWNER'S REPRESENTATIVE. MAINTAIN SERVICE TO EXISTING ELECTRICAL EQUIPMENT IN AREAS

ADJACENT TO REMODEL AREA, UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING ELECTRICAL EQUIPMENT NOT REQUIRED TO BE DEMOLISHED UNLESS OTHERWISE NOTED. DELIVER ALL EXISTING ELECTRICAL EQUIPMENT IN REMODELED AREAS, THAT ARE REMOVED AND

NOT REUSED ELSEWHERE, AND ARE DEEMED TO BE SALVAGEABLE IN THE JUDGMENT OF THE

CONTRACTOR AND OWNER'S REPRESENTATIVE, TO THE OWNER. DELIVER ALL SALVAGED ELECTRICAL EQUIPMENT AND OTHER ITEMS TO A LOCATION DESIGNATED BY THE OWNER'S REPRESENTATIVE.

REMOVE FROM SITE, ALL OTHER ELECTRICAL EQUIPMENT, HARDWARE, AND OTHER ITEMS THAT ARE

DEEMED UNSALVAGEABLE BY CONTRACTOR AND THE OWNER'S REPRESENTATIVE.

3. CUT, PATCH AND MATCH IN ALL AREAS AFFECTED BY REMOVAL OF ELECTRICAL EQUIPMENT AND DEVICES.

4. CAUSE AS LITTLE INTERFERENCE OR INTERRUPTION OF EXISTING UTILITIES AND SERVICES AS POSSIBLE.

SCHEDULE ANY POWER OR OTHER UTILITY SHUTDOWN WITH THE OWNER'S REPRESENTATIVE.

SHUTDOWNS WHICH MAY BE REQUIRED SHALL BE PRESENTED IN WRITING TO THE OWNER'S

REPRESENTATIVE FOR APPROVAL TWO WEEKS PRIOR TO COMMENCEMENT OF WORK. SHUTDOWN WORK

SHALL BE PERFORMED ON OVERTIME HOURS IF SO DIRECTED BY OWNER'S REPRESENTATIVE.

5. COORDINATE WITH OTHER TRADES AND PROMPTLY TRANSMIT ALL INFORMATION REQUIRED BY THEM.

COORDINATE THE SEQUENCE OF DEMOLITION WITH OTHER TRADES TO ENSURE THAT ALL WORK

PROCEEDS WITH A MINIMUM OF INTERFERENCE AND DELAY.

6. RELOCATE ALL CONDUITS THAT ARE TO REMAIN IN SERVICE WHICH ARE IN A LOCATION TO CONFLICT

WITH NEW WORK.

7. WHEREVER EXISTING ELECTRICAL DEVICES, PANELS, CONDUITS, CABLES, AND OTHER ITEMS, CONFLICT

WITH REMODEL WORK, WHETHER SHOWN OR NOT, RELOCATE THESE ITEMS TO COORDINATE WITH NEW

CONSTRUCTION.

8. ALL EXISTING ABOVE ROOF CONDUIT AND WIRING MUST BE REPLACED WITH NEW - WIRE SIZE, QUANTITY

AND TYPE SHALL MATCH EXISTING. NEW CONTROL WIRING TO HVAC EQUIPMENT MAY ONLY BE INSTALLED

FOR THE RUN FROM THE EQUIPMENT CONTROL PANEL TO THE NEAREST EXISTING TERMINATION POINT OR SPLICE LOCATION. INSTALL EMT WITH COMPRESSION FITTINGS AND LIQUID-TIGHT FLEXIBLE METAL

CONDUIT TERMINATION AT THE MECHANICAL EQUIPMENT.

9. PROVIDE PROTECTIVE COVERING OVER EXISTING EQUIPMENT WHEN INSTALLING ALL NEW WORK.

10. ASBESTOS REMOVAL: IN THE EVENT ASBESTOS IS FOUND TO BE PRESENT IN AREAS CONFLICTING WITH

ELECTRICAL WORK, BEFORE CONTINUATION OF WORK IN THOSE AREAS, NOTIFY THE OWNER'S

REPRESENTATIVE FOR THE REMOVAL OF SUCH HAZARDOUS MATERIAL BY A CERTIFIED ASBESTOS

CONTRACTOR.

11. ALL CONTRACTORS PERFORMING WORK ON THIS PROJECT SHALL COMPLY WITH THE REQUIREMENTS OF

2022 CFC S.901.7, SPECIFICALLY 901.7.4, CH. 11, CH. 33, AND 2022 NFPA 241.

DEMOLITION GENERAL NOTES

EC201

EC301

270 HU BUILDINGS 336 THRU 337 ROOF PLAN - DEMOLITION - ELECTRICAL

FACILITY A 270 HU BUILDING 334 ROOF PLAN - REMODEL - ELECTRICAL

270 HU BUILDINGS 336 THRU 337 ROOF PLAN - REMODEL - ELECTRICAL

CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE

(PART 1, TITLE 24, CALIFORNIA CODE OF REGULATIONS (CCR)).

CALIFORNIA BUILDING CODE (CBC) - PART 2, TITLE 24, CCR, BASED ON THE 2021 INTERNATIONAL

BUILDING CODE (IBC).

CALIFORNIA ELECTRICAL CODE (CEC) - PART 3, TITLE 24, CCR, BASED ON THE 2020 NATIONAL

ELECTRICAL CODE (NEC).

CALIFORNIA MECHANICAL CODE (CMC) - PART 4, TITLE 24, CCR, BASED ON THE 2021 UNIFORM

MECHANICAL CODE (UMC).

CALIFORNIA PLUMBING CODE (CPC) - PART 5, TITLE 24, CCR, BASED ON THE 2021 UNIFORM

PLUMBING C0DE (UPC).

CALIFORNIA FIRE CODE (CFC) - PART 9, TITLE 24, CCR, BASED ON THE 2021 INTERNATIONAL FIRE

CODE (IFC).

CALIFORNIA GREEN BUILDING STANDARDS CODE - PART 11, TITLE 24

N.F.P.A. 101 LIFE SAFETY CODE

N.F.P.A. 72 FIRE ALARM CODE

EDITION TITLE 19, CALIFORNIA CODE OF REGULATIONS, PUBLIC SAFETY, STATE FIRE MARSHAL

REGULATIONS.

TITLE 8, CALIFORNIA CODE OF REGULATIONS, INDUSTRIAL STANDARDS.

TITLE 22, CALIFORNIA CODE OF REGULATIONS, SOCIAL SECURITY DIVISIONS 5, 7.

OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA).

FACTORY MUTUAL SYSTEM (FM) REQUIREMENTS.

ALL APPLICABLE STATE AND LOCAL CODES AND REGULATIONS

APPLICABLE CODES AND REGULATIONS

SHEET NUMBER

S

TA

TE

O

F C

A

LI

FO

R N

IA

D

E P A R

TM

E N

T O

F C

O R

R E C

TI

O

N S A

N D

R E H

A B

IL

IT

A

TI

O N

FA

C

IL

IT

Y P

LA

N

N

IN

G , C

O N

S

TR

U C

TI

O N

A N

D M

A N

A G

E M

E N

T D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G N

SE

RV

IC

ES

S

EC

TI

O

N

APPROVAL

L A C

V1

C A L

IF

O R

N

IA

S T A T E P

R

IS

O N

L O

S A

N G

E L E S C

O U

N T Y

T H

S T R

E E T , W

E S T

LA

N

C A S T E R

, C A

.1

Electrical Engineers Lighting Designers

100 Howe Ave., Suite 235N

Sacramento, CA 95825-8217

PROJECT #:

www.mneilsengineering.com

Tel: (916) 923-4400

PROJECT MGR: Stuart LinGsa\

21318.21

08/29/2023

R E P L A C E R

O O

F S

P H

A S E

A U

G U

S T

W O

R K

IN

G D

R A W

IN

G

S

EA01

E L E C

T R

IC

A L S

H E E T I N

D E X S Y M

B O

L L

IS

T A

B B

R E V

IA

T

IO

N S

A N

D D

E M

O L

IT

IO

N

G E N

E R

A L N

O T E S

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp 491 #1317

File details come from the government source that posted it. Updated .