21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf

PDF 371 KB Posted

Attached to
FPCM-LAC-I001104-M035-RS
Solicitation number
0000036277
Issued by
Los Angeles County, California

About this file

This document is a set of mechanical and plumbing design drawings for a re-roofing project by the California Department of Corrections and Rehabilitation (CDCR) at the California State Prison in Los Angeles County. The project involves re-roofing multiple housing unit buildings (Buildings 270, 334, 346, and 347) with new insulation, which requires raising existing mechanical systems and installing new curb adaptors or curbs. The scope specifically does not include upgrading existing mechanical systems or resolving non-compliant system configurations, but focuses on preparing the roofs for new insulation while maintaining existing equipment placement.

The project is located at 44750 60th Street West in Lancaster, California, and is designed in compliance with multiple California building codes including the 2022 California Mechanical, Plumbing, Electrical, Building, and Fire Codes. The design was prepared by Turley Mechanical Engineering & Associates and Hibser Yamauchi Architects, with the project identified as Job Number JT 22107-PH1. The drawings include comprehensive mechanical and plumbing legends, notes, and schedules, detailing specific requirements for equipment reinstallation, testing, and startup procedures, with a strong emphasis on maintaining existing system functionality during and after the re-roofing process.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COLD WATER LINE / INDUSTRIAL COLD WATER LINE

CONDENSATE DRAIN OR DISCHARGE DRAIN LINE

GAS

HOT WATER LINE

HOT WATER RETURN

OVERFLOW

PIPING OR EQUIPMENT TO BE REMOVED

RAINWATER LEADER

RISE OR DROP IN DIRECTION OF FLOW

SANITARY SOIL OR WASTE LINE

VENT

BALANCING VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

FLEXIBLE CONNECTION

PRESSURE REDUCING VALVE

REDUCER

PRESSURE & TEMPERATURE RELIEF VALVE

PRESSURE GAUGE

SHUT OFF COCK

GATE VALVE

STRAINER

SHUT OFF VALVE

FIRE SERVICE LINE

SOLENOID VALVE

THERMOMETER

UNION

STRAINER & DRAIN VALVE WITH HOSE FITTING

FIRE DEPARTMENT CONNECTION

HOSE BIBB/ WALL HYDRANT

TRAP PRIMER

TRAP

FLOOR/ GRADE CLEAN OUT

CLEANOUT & WALL CLEANOUT

FLOOR DRAIN

STAT

6"� 6x6 6"� 6x6

8x10

R(D)

10x12 AL

8x10

R(D)

10x12 AL

T

MAD

UNIT TYPE

UNIT NUMBER

DETAIL NUMBER

SHEET NUMBER ON WHICH DETAIL IS FOUND

SECTION NUMBER

SHEET ON WHICH SECTION IS FOUND

ACOUSTICALLY LINED DUCT - DIMENSIONS ARE OUTSIDE

BRANCH TAKE-OFF WITH SPLITTER DAMPER & W/ THROAT

SIZE AS INDICATED. TRANSITION TO DUCT SIZES SHOWN.

DUCT RISE (DROP) IN DIRECTION OF AIR FLOW

DUCT - WIDTH x DEPTH

LATERAL WITH CONICAL TRANSITION TO DUCT SIZES INDICATED

CONICAL TEE FROM RECTANGULAR TO ROUND BRANCH

45° ENTRY TEE, RECTANGULAR BRANCH, RECTANGULAR MAIN

45° WYE, CONICAL MAIN AND BRANCH WITH 45° ELBOW,

BRANCH 90° TO MAIN

TEE WITH ADJUSTABLE EXTRACTOR. RECTANGULAR MAIN,

RECTANGULAR BRANCH

RADIUS ELL. SEE SPECS.

SQUARE ELL WITH TURNING VANES

TRANSITION ROUND TO RECTANGULAR

VERTICAL DUCT RISE OR DROP

DUCTS, PIPES, OR EQUIPMENT TO BE REMOVED

DUCT DROP OR RISE THRU ROOF OR FLOOR

RETURN, OUTSIDE, OR EXHAUST AIR DUCT

SUPPLY DUCT

ACCESS DOOR

AUTOMATIC CONTROL DAMPER

MANUAL AIR DAMPER

VOLUME DAMPER WITH REMOTE BALANCING DEVICE

FIRE DAMPER

FIRE SMOKE DAMPER

SMOKE DETECTOR

DUCT STATIC PRESSURE SENSOR

THERMOSTAT

�RADIUS=1.5x�

AE

AD

REFRIGERANT LIQUID

REFRIGERANT SUCTION

FLOW SENSOR

PETE'S PLUG

SIGHT GLASS

TWO WAY CONTROL VALVE

THREE WAY CONTROL VALVE

AAV AUTOMATIC AIR VENT

ABV ABOVE

ABC, OH ABOVE CEILING, OVERHEAD

AC AIR CONDITIONING

AD ACCESS DOOR

ADA AMERICANS W/ DISABILITIES ACT

AE AIR EXTRACTOR

AFR ABOVE FINISHED ROOF

AL ACOUSTICALLY LINED

AHU AIR HANDLING UNIT

APD AIR PRESSURE DROP

BHP BRAKE HORSEPOWER

BOD BOTTOM OF DUCT

BR BRANCH

BTU BRITISH THERMAL UNIT

BTUH BTU PER HOUR

CAV CONSTANT AIR VOLUME

CD CONDENSATE DRAIN

CFM, f CUBIC FEET OF AIR PER MINUTE

CFS CUBIC FEET PER SECOND

CL CENTERLINE

CO CLEANOUT

CONC. CONCRETE

CONN. CONNECT

CR CONDENSATE RETURN (STEAM)

CS CURRENT SENSOR

CU CONDENSING UNIT

CU FT CUBIC FEET

CU IN CUBIC INCHES

CVB CONSTANT VOLUME BOX

CW COLD WATER

DB DRY BULB

DF DOUGLAS FIR

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DIA, � DIAMETER

DSP DUCT STATIC PRESSURE

SENSOR

EA, OA, RA, SA EXHAUST, OUTSIDE, RETURN &

SUPPLY AIR

E.C. ELECTRICAL CONTRACTOR

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER

TEMPERATURE

FA FACE AREA (SQUARE FEET)

FC FLEXIBLE CONNECTION

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FLA FULL LOAD AMPS

FPI FINS PER INCH

FPM FEET PER MINUTE

FSR FIRE SPRINKLER RISER

GALV. GALVANIZED

GA GAUGE

GC GENERAL CONTRACTOR

GSM GALVANIZED SHEET METAL

HP HORSE POWER

HW HOT WATER

HWS HOT WATER SUPPLY

HWR HOT WATER RETURN

HZ FREQUENCY (HERTZ)

I.E. INVERT ELEVATION

ICW INDUSTRIAL COLD WATER

LBS POUNDS

LRA LOCKED ROTOR AMPS

LWT LEAVING WATER TEMPERATURE

MAV MANUAL AIR VENT

MAX MAXIMUM

MBH BTU PER HOUR (THOUSAND)

MC MECHANICAL CONTRACTOR

MIN MINIMUM

MPS MEDIUM PRESSURE STEAM

(N) (E) NEW, EXISTING

N.C. NORMALLY CLOSED

NEG NEGATIVE

NIC NOT IN CONTRACT

N.O. NORMALLY OPEN

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OP OPERATING

PH PHASE

POC POINT OF CONNECTION

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PTDF PRESSURE TREATED DOUGLAS FIR

P&TRV PRESSURE & TEMPERATURE

RELIEF VALVE

(R) (D) RISE, DROP

RD, OFL ROOF DRAIN, OVERFLOW

REF ROOF EXHAUST FAN

REQ'D REQUIRED

RI ROUGH-IN

RL REFRIGERANT LIQUID

RPBP REDUCED PRESSURE BACKFLOW

PREVENTER

RPM REVOLUTIONS PER MINUTE

RO RUN-OUT

RS REFRIGERANT SUCTION

SAD SEE ARCHITECTURAL DRAWINGS

SED SEE ELECTRICAL DRAWINGS

SM SHEET METAL

SMS SHEET METAL SCREWS

SOV SHUT OFF VALVE

SS STAINLESS STEEL

SSD SEE STRUCTURAL DRAWING

STL STEEL

TA, FA TO ABOVE, FROM ABOVE

TB, FB TO BELOW, FROM BELOW

TBR TO BE REMOVED

TCC TEMPERATURE CONTROL

CONTRACTOR

TCP TEMPERATURE CONTROL PANEL

THK THICK

TP TRAP PRIMER

TR TO REMAIN

TSP TOTAL STATIC PRESSURE

TV TURNING VANES

TYP TYPICAL

UG, UF UNDERGROUND, UNDER FLOOR

UON UNLESS OTHERWISE NOTED

UTR UP THROUGH ROOF

V, VR, VTR VENT, VENT RISER, VENT THRU

ROOF

VAC VOLTS ALTERNATING CURRENT

VFD VARIABLE FREQUENCY DRIVE

VIF VERIFY IN FIELD

WB WET BULB

WG WATER GAUGE

WOG WATER OIL GAS PRESSURE RATING

WP WATER PRESSURE

WPD WATER PRESSURE DROP

WT, AT WATERTIGHT, AIRTIGHT

WCO WALL CLEAN OUT

ZV ZONE VALVE

APPLICABLE CODES AND STANDARDS

ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE

REGULATIONS, INCLUDING BUT NOT LIMITED TO THE FOLLOWING:

A) STATE OF CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24,

C) NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) LIFE SAFETY CODE

2022 EDITION OF THE CALIFORNIA MECHANICAL CODE.

2022 EDITION OF THE CALIFORNIA PLUMBING CODE.

2022 EDITION OF THE CALIFORNIA ELECTRICAL CODE.

2022 EDITION OF THE CALIFORNIA BUILDING CODE.

2022 EDITION OF THE CALIFORNIA FIRE CODE.

GENERAL NOTES

1. NOT ALL SYMBOLS OR ABBREVIATIONS ARE APPLICABLE TO THIS PROJECT.

2. REFER TO DETAILS AND NOTES FOR MOUNTING HEIGHTS.

D) CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION (CDCR)

DESIGN CRITERIA GUIDELINES (DCG)

SHEET NO.

SHEET INDEX

DESCRIPTION

MP001 MECHANICAL / PLUMBING LEGNED, NOTES AND SCHEDULES

MPA201 MECHANICAL / PLUMBING TYPICAL 270 HOUSING UNIT ROOF PLAN DEMOLITION

MPA301 MECHANICAL / PLUMBING TYPICAL 270 HOUSING UNIT ROOF PLAN REMODEL

MPA302 PLUMBING TYPICAL 270 HOUSING UNIT ROOF PLAN RAINWATER

MPB201 MECHANICAL / PLUMBING FACILITY A 270 HU BUILDINGS 334 ROOF PLAN DEMOLITION

MPB301 MECHANICAL / PLUMBING FACILITY 270 HU BUILDINGS 334 ROOF PLAN REMODEL

MPB302 PLUMBING 270 HU BUILDINGS 334 ROOF PLAN RAINWATER

MPC201 MECHANICAL / PLUMBING 270 HU BUILDINGS 346 THRU 347 ROOF PLAN DEMOLITION

MPC301 MECHANICAL / PLUMBING 270 HU BUILDINGS 346 THRU 347 ROOF PLAN REMODEL

MPC302 PLUMBING 270 HU BUILDINGS 346 THRU 347 ROOF PLAN RAINWATER

MP501 MECHANICAL / PLUMBING DETAILS

MP502 MECHANICAL / PLUMBING DETAILS

MP801 MECHANICAL / PLUMBING PHOTOS

MP802 MECHANICAL / PLUMBING PHOTOS

GENERAL MECHANICAL/PLUMBING NOTES

1. SEAL AIRTIGHT ALL SEAMS OF ALL SUPPLY RETURN AND EXHAUST DUCT WITH HARDCAST INC. FOIL GRIP 1402 181 BFX INDOOR/OUOTDOOR ROLL SEALANT WITH 12 MIL. BUTYL BACKING. ROLL SEALANT CAN ONLY BE APPLIED TO BARE (NOT PAINTED) GALVANIZED DUCTWORK. REMOVE PAINT WHERE PAINT EXIST.

2. WHERE EXISTING DUCT FLEX CONNECTION EXIST, PROVIDE NEW DUCT FLEX CONNECTOR ON INLET AND OUTLET OF AC UNIT, AIR HANDLER AND HEATING/EVAPORATIVE COOLING UNIT. FLEX CONNECTOR SHALL BE U.L. R 4462 COMPLIANT,15000 CYCLES RATED, MIN 22 OZ / SQ. YD., NFPA 90A, 90B COMPLIANT, WOVEN NYLON / POLYESTER EXCELON DURO DYNE OR, VENT FABRICS EQUAL. PROVIDE WITH SHEET METAL COVER

TO BLOCK U.V.

3. LEAVE ALL CONTROLS INTACT. PROVIDE TEMPORARY DISCONNECTION AND RECONNECTION FOR RE-ROOF.

VERIFY EQUIPMENT WORKS PRIOR TO DEMOLITION AND VERIFY AFTER WORK IS COMPLETE, THAT EQUIPMENT IS FUNCTIONING PROPERTY. REPORT ALL TEST FAILURES OF EXISTING SYSTEMS PRIOR TO DISCONNECTING. WHERE CONTROL WIRING IS EXTENDED DUE TO RAISED HEIGHT OF EQUIPMENT, REPLACE

FEEDERS WITH SIMILAR SIZED FEEDER.

4. BUILDINGS TO REMAIN OPERATIONAL DURING CONSTRUCTION. HVAC, EXHAUST FANS, FLUES, VENTS, ARE TO REMAIN IN PLACE EXCEPT FOR SCHEDULED QUICK LIFTS TO ALLOW NEW ROOFING, MATERIALS AND

MODIFICATIONS.

5. PRESSURE TEST ALL MODIFIED DOMESTIC WATER PIPING AT 50PSI HIGHER THAN OPERATION PRESSURE, 4

HOURS WITH NO PRESSURE LOSS.

6. PROVIDE ALL NEW FLASHING AT PIPES AND DUCT PENETRATIONS.

7. PROVIDE INSULATION AND JACKET FOR PIPES ON ROOF WHERE REQUIRED. REFER TO SPECIFICATION 22 07

19 FOR REQUIREMENTS.

8. INSPECT ALL HVAC EQUIPMENT AND IDENTIFY IF IT IS NOT WORKING PRIOR TO REMOVAL. DOCUMENT ISSUE AND SUBMIT TO CDCR PM. DOCUMENT ALL EQUIPMENT THAT IS DAMAGED. FAILURE TO DOCUMENT DAMAGE

OR NON-FUNCTIONAL SYSTEMS COULD CAUSE FOR CONTRACTOR TO REPAIR EQUIPMENT.

9. ROOF SHALL BE TESTED IN ACCORDANCE WITH CPC 2022 SECTION 1107.2.1 OR SECTION 1107.2.2 TO

DISCLOSE LEAKS AND DEFECTS.

10.ANY GAS PIPING DISCONNECTED AND THE RECONNECTED SHALL BE TESTED AND INSPECTED FOR LEAKS IN

ACCORDANCE WITH 2022 CPC SECTION 1213 AND NFPA 54.

11.PROVIDE TEMPORARY COVERS ON ALL EXPOSED OPEN EQUIPMENT, DUCTS AND PIPES AND REMOVE

COVERS AND DEBRIS UPON PLACEMENT OF TEMPORARILY REMOVED EQUIPMENT

12.ALL EXISTING HVAC UNITS ARE TO BE REINSTALLED AT THE ORIGINAL LOCATIONS. LABEL EACH UNIT WITH A UNIQUE STENCIL FOR THE PURPOSE OF KEEPING TRACK OF ORIGINAL LOCATION. REFER TO ROOF PLANS FOR NAMING DESIGNATIONS OR SUBMIT A SHOP DRAWING WITH A NAMING DESIGNATION MATCHING THE

STENCILED LABELS.

13.PLUMBING CONTRACTOR TO CHECK CONDUCTOR/DOWNSPOUT AND CLEAR THEM OF DEBRIS AFTER

INSTALLATION OF NEW ROOF DRAIN SYSTEM.

14.REINSTALLATION OF EXISTING COOLING SYSTEM SHALL NOT DECREASE ECONOMIZER CAPABILITY.

15.PROVIDE STARTUP PROCEDURES FOR ALL MECHANICAL EQUIPMENT THAT WAS REMOVED AND

REINSTALLED. STARTUP PROCEDURE SHALL INCLUDE THE FOLLOWING MINIMUM REQUIREMENTS.

A. VERIFY AND RECORD VOLTAGE, AMPERAGE, AND NAMEPLATE DATA FOR EACH MOTOR IN EACH PIECE OF EQUIPMENT (INCLUDES BUT NOT LIMITED TO EXHAUST FANS, AC UNIT FANS, AHU FANS, CIRCULATING

PUMPS).

B. VERIFY CORRECT ROTATION OF EACH FAN.

C. VERIFY START/STOP COMMANDS FUNCTION PROPERLY WITH THE CONTROLS.

D. VERIFY ALL MODES OF OPERATION FUNCTION PROPERLY (HEATING, COOLING, ECONOMIZER, ETC).

E. TEST DELTA T (°F) ACROSS HEATING AND COOLING UNITS TO SHOW THEY ARE PERFORMING

PROPERLY. IDENTIFY OUTSIDE AIR TEMP, MIXED AIR TEMPERATURE, AND DISCHARGE AIR

TEMPERATURE. RECORD RESULTS AND SUBMIT TO CDCR.

F. VERIFY SAFETY SHUTDOWNS PERFORM PROPERLY (i.e. DUCT SMOKE DETECTORS REINSTALLED ARE TO BE TESTED TO ENSURE THEY SHUT DOWN EQUIPMENT AND ALARM THE FIRE ALARM CONTROL PANEL

PER THEIR CURRENT OPERATION BEFORE PROJECT DEMOLITION).

G. PROVIDE STARTUP REPORT FOR EACH PIECE OF EQUIPMENT. IDENTIFY ISSUES FOUND (i.e. BROKEN BELTS, BELTS REQUIRING TIGHTENING OR ALIGNMENT, DAMPERS MALFUNCTIONING, LINKAGE BROKEN, etc). COMPANY PROVIDING STARTUP SHALL HAVE A MINIMUM OF 7 YEARS OF EXPERIENCE IN STARTUP

OF SIMILAR EQUIPMENT.

H. CERTIFIED BALANCE REPORT IS NOT REQUIRED AS EQUIPMENT IS BEING REINSTALLED WITHOUT MODIFICATION. IF DUCTWORK IS REMOVED THAT HAS BALANCE DAMPERS, CONTRACTOR IS REQUIRED TO MARK POSITIONS OF DAMPERS SO THEY CAN BE RESET TO THE SAME POSITION IF MOVED. TAKE

CARE NOT TO ADJUST EXISTING BALANCE DAMPERS.

16. EACH VENT SHALL TERMINATE NOT LESS THAN 10 FEET FROM OR NOT LESS THAN 3 FEET ABOVE, AN OPENABLE WINDOW, DOOR, OPENING, AIR INTAKE, OR SHAFT VENT, OR NOT LESS THAN 3 FEET IN EVERY

DIRECTION FORM A LOT LINE, ALLEY AND STREET EXCEPTED.

PROJECT SCOPE OF WORK

THE PROJECT IS RE-ROOFING PROJECT WITH NEW INSULATION ON ROOF. THE ADDITION OF NEW

INSULATION ON ROOF REQUIRES THE EXISTING MECHANICAL SYSTEMS TO BE RAISED FOR

RE-ROOFING AND FOR INSTALLATION OF NEW CURB ADAPTORS OR NEW CURBS. THE PROJECT

SCOPE DOES NOT INCLUDE UPGRADE OF EXISTING MECHANICAL SYSTEM OR REPLACE EXISTING

NON COMPLIANT SYSTEMS. THE PROJECT SCOPE IS NOT TO RESOLVE EXISTING NON-COMPLIANT

SYSTEM SUCH AS MINIMUM DISTANCE OF FRESH AIR INTAKE FROM VENTS & EXHAUSTS.

REFER TO DRAWINGS FOR SPECIFICS. B) 2023 COUNTY OF LOS ANGELES CODE AMENDMENTS

RD-1 ROOF DRAIN, "ZURN" Z121-DP-E, TOP SET DECK PLATE, STATIC EXTENSION AND LOW

SILHOUETTE DOME.

OFD-1 ROOF RECEPTOR, "ZURN" Z121-DP-89, 2" WATER DAM COLLAR, TOP SET DECK PLATE,

STATIC EXTENSION AND LOW SILHOUETTE DOME.

EQUAL PRODUCTS: JR SMITH, JONESPEC.

PLUMBING FIXTURE SCHEDULE

Project Engineer:

U R L E YT M E C H A N IC A L

E N G I N E E R I N G

G R O U P, I N C.& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capitol Avenue Sacramento, CA 95816

Project Manager:

GYang

Job Number:

Project Drafter: Login:

Plot Date: Aug 25, 2023 - 4:07pm

22107-PH1JT

JT

SHEET NUMBER

S

TA

TE

O

F C

A

LI

FO

R

N

IA

D E P A R

TM

E N

T O

F C

O R

R E C

TI

O

N S A

N D

R E H

A B

IL

IT

A

TI

O N

FA

C

IL

IT

Y P

LA

N

N

IN

G , C

O N

S

TR

U C

TI

O

N A

N D

M A N

A G

E M

E N

T D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G

N

SE

RV

IC

ES

S

EC

TI

O N

APPROVAL

L A C

V1

C A L

IF

O R

N

IA

S T A T E P

R

IS

O N

L O

S A

N G

E L E S C

O U

N T Y

T H

S T R

E E T , W

E S T

LA

N

C A S T E R

, C A

R E P L A C

E R

O O

F S

P H

A S E

A U

G U

S T

W O

R K

IN

G D

R A W

IN

G

S

.1

A rc h it e ct s, I n c.

H

IB

S E R Y

A M

A U C

H I n d S tr e e t, S u it e

D a vi s, C

A

.7

.1 o ff ic e

.7

.4 f a x

MP001

M E C

H A N

IC

A L P

L U M

B

IN

G L

E G

N E D

N

O T E S A

N D S

C H

E D

U L E S

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp 491 #1317

File details come from the government source that posted it. Updated .