This document is a set of mechanical and plumbing design drawings for a re-roofing project by the California Department of Corrections and Rehabilitation (CDCR) at the California State Prison in Los Angeles County. The project involves re-roofing multiple housing unit buildings (Buildings 270, 334, 346, and 347) with new insulation, which requires raising existing mechanical systems and installing new curb adaptors or curbs. The scope specifically does not include upgrading existing mechanical systems or resolving non-compliant system configurations, but focuses on preparing the roofs for new insulation while maintaining existing equipment placement.
The project is located at 44750 60th Street West in Lancaster, California, and is designed in compliance with multiple California building codes including the 2022 California Mechanical, Plumbing, Electrical, Building, and Fire Codes. The design was prepared by Turley Mechanical Engineering & Associates and Hibser Yamauchi Architects, with the project identified as Job Number JT 22107-PH1. The drawings include comprehensive mechanical and plumbing legends, notes, and schedules, detailing specific requirements for equipment reinstallation, testing, and startup procedures, with a strong emphasis on maintaining existing system functionality during and after the re-roofing process.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLD WATER LINE / INDUSTRIAL COLD WATER LINE
CONDENSATE DRAIN OR DISCHARGE DRAIN LINE
GAS
HOT WATER LINE
HOT WATER RETURN
OVERFLOW
PIPING OR EQUIPMENT TO BE REMOVED
RAINWATER LEADER
RISE OR DROP IN DIRECTION OF FLOW
SANITARY SOIL OR WASTE LINE
VENT
BALANCING VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
FLEXIBLE CONNECTION
PRESSURE REDUCING VALVE
REDUCER
PRESSURE & TEMPERATURE RELIEF VALVE
PRESSURE GAUGE
SHUT OFF COCK
GATE VALVE
STRAINER
SHUT OFF VALVE
FIRE SERVICE LINE
SOLENOID VALVE
THERMOMETER
UNION
STRAINER & DRAIN VALVE WITH HOSE FITTING
FIRE DEPARTMENT CONNECTION
HOSE BIBB/ WALL HYDRANT
TRAP PRIMER
TRAP
FLOOR/ GRADE CLEAN OUT
CLEANOUT & WALL CLEANOUT
FLOOR DRAIN
STAT
6"� 6x6 6"� 6x6
8x10
R(D)
10x12 AL
8x10
R(D)
10x12 AL
T
MAD
UNIT TYPE
UNIT NUMBER
DETAIL NUMBER
SHEET NUMBER ON WHICH DETAIL IS FOUND
SECTION NUMBER
SHEET ON WHICH SECTION IS FOUND
ACOUSTICALLY LINED DUCT - DIMENSIONS ARE OUTSIDE
BRANCH TAKE-OFF WITH SPLITTER DAMPER & W/ THROAT
SIZE AS INDICATED. TRANSITION TO DUCT SIZES SHOWN.
DUCT RISE (DROP) IN DIRECTION OF AIR FLOW
DUCT - WIDTH x DEPTH
LATERAL WITH CONICAL TRANSITION TO DUCT SIZES INDICATED
CONICAL TEE FROM RECTANGULAR TO ROUND BRANCH
45° ENTRY TEE, RECTANGULAR BRANCH, RECTANGULAR MAIN
45° WYE, CONICAL MAIN AND BRANCH WITH 45° ELBOW,
BRANCH 90° TO MAIN
TEE WITH ADJUSTABLE EXTRACTOR. RECTANGULAR MAIN,
RECTANGULAR BRANCH
RADIUS ELL. SEE SPECS.
SQUARE ELL WITH TURNING VANES
TRANSITION ROUND TO RECTANGULAR
VERTICAL DUCT RISE OR DROP
DUCTS, PIPES, OR EQUIPMENT TO BE REMOVED
DUCT DROP OR RISE THRU ROOF OR FLOOR
RETURN, OUTSIDE, OR EXHAUST AIR DUCT
SUPPLY DUCT
ACCESS DOOR
AUTOMATIC CONTROL DAMPER
MANUAL AIR DAMPER
VOLUME DAMPER WITH REMOTE BALANCING DEVICE
FIRE DAMPER
FIRE SMOKE DAMPER
SMOKE DETECTOR
DUCT STATIC PRESSURE SENSOR
THERMOSTAT
�RADIUS=1.5x�
AE
AD
REFRIGERANT LIQUID
REFRIGERANT SUCTION
FLOW SENSOR
PETE'S PLUG
SIGHT GLASS
TWO WAY CONTROL VALVE
THREE WAY CONTROL VALVE
AAV AUTOMATIC AIR VENT
ABV ABOVE
ABC, OH ABOVE CEILING, OVERHEAD
AC AIR CONDITIONING
AD ACCESS DOOR
ADA AMERICANS W/ DISABILITIES ACT
AE AIR EXTRACTOR
AFR ABOVE FINISHED ROOF
AL ACOUSTICALLY LINED
AHU AIR HANDLING UNIT
APD AIR PRESSURE DROP
BHP BRAKE HORSEPOWER
BOD BOTTOM OF DUCT
BR BRANCH
BTU BRITISH THERMAL UNIT
BTUH BTU PER HOUR
CAV CONSTANT AIR VOLUME
CD CONDENSATE DRAIN
CFM, f CUBIC FEET OF AIR PER MINUTE
CFS CUBIC FEET PER SECOND
CL CENTERLINE
CO CLEANOUT
CONC. CONCRETE
CONN. CONNECT
CR CONDENSATE RETURN (STEAM)
CS CURRENT SENSOR
CU CONDENSING UNIT
CU FT CUBIC FEET
CU IN CUBIC INCHES
CVB CONSTANT VOLUME BOX
CW COLD WATER
DB DRY BULB
DF DOUGLAS FIR
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA, � DIAMETER
DSP DUCT STATIC PRESSURE
SENSOR
EA, OA, RA, SA EXHAUST, OUTSIDE, RETURN &
SUPPLY AIR
E.C. ELECTRICAL CONTRACTOR
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER
TEMPERATURE
FA FACE AREA (SQUARE FEET)
FC FLEXIBLE CONNECTION
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FLA FULL LOAD AMPS
FPI FINS PER INCH
FPM FEET PER MINUTE
FSR FIRE SPRINKLER RISER
GALV. GALVANIZED
GA GAUGE
GC GENERAL CONTRACTOR
GSM GALVANIZED SHEET METAL
HP HORSE POWER
HW HOT WATER
HWS HOT WATER SUPPLY
HWR HOT WATER RETURN
HZ FREQUENCY (HERTZ)
I.E. INVERT ELEVATION
ICW INDUSTRIAL COLD WATER
LBS POUNDS
LRA LOCKED ROTOR AMPS
LWT LEAVING WATER TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH BTU PER HOUR (THOUSAND)
MC MECHANICAL CONTRACTOR
MIN MINIMUM
MPS MEDIUM PRESSURE STEAM
(N) (E) NEW, EXISTING
N.C. NORMALLY CLOSED
NEG NEGATIVE
NIC NOT IN CONTRACT
N.O. NORMALLY OPEN
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OP OPERATING
PH PHASE
POC POINT OF CONNECTION
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTDF PRESSURE TREATED DOUGLAS FIR
P&TRV PRESSURE & TEMPERATURE
RELIEF VALVE
(R) (D) RISE, DROP
RD, OFL ROOF DRAIN, OVERFLOW
REF ROOF EXHAUST FAN
REQ'D REQUIRED
RI ROUGH-IN
RL REFRIGERANT LIQUID
RPBP REDUCED PRESSURE BACKFLOW
PREVENTER
RPM REVOLUTIONS PER MINUTE
RO RUN-OUT
RS REFRIGERANT SUCTION
SAD SEE ARCHITECTURAL DRAWINGS
SED SEE ELECTRICAL DRAWINGS
SM SHEET METAL
SMS SHEET METAL SCREWS
SOV SHUT OFF VALVE
SS STAINLESS STEEL
SSD SEE STRUCTURAL DRAWING
STL STEEL
TA, FA TO ABOVE, FROM ABOVE
TB, FB TO BELOW, FROM BELOW
TBR TO BE REMOVED
TCC TEMPERATURE CONTROL
CONTRACTOR
TCP TEMPERATURE CONTROL PANEL
THK THICK
TP TRAP PRIMER
TR TO REMAIN
TSP TOTAL STATIC PRESSURE
TV TURNING VANES
TYP TYPICAL
UG, UF UNDERGROUND, UNDER FLOOR
UON UNLESS OTHERWISE NOTED
UTR UP THROUGH ROOF
V, VR, VTR VENT, VENT RISER, VENT THRU
ROOF
VAC VOLTS ALTERNATING CURRENT
VFD VARIABLE FREQUENCY DRIVE
VIF VERIFY IN FIELD
WB WET BULB
WG WATER GAUGE
WOG WATER OIL GAS PRESSURE RATING
WP WATER PRESSURE
WPD WATER PRESSURE DROP
WT, AT WATERTIGHT, AIRTIGHT
WCO WALL CLEAN OUT
ZV ZONE VALVE
APPLICABLE CODES AND STANDARDS
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE
REGULATIONS, INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
A) STATE OF CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24,
C) NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) LIFE SAFETY CODE
2022 EDITION OF THE CALIFORNIA MECHANICAL CODE.
2022 EDITION OF THE CALIFORNIA PLUMBING CODE.
2022 EDITION OF THE CALIFORNIA ELECTRICAL CODE.
2022 EDITION OF THE CALIFORNIA BUILDING CODE.
2022 EDITION OF THE CALIFORNIA FIRE CODE.
GENERAL NOTES
1. NOT ALL SYMBOLS OR ABBREVIATIONS ARE APPLICABLE TO THIS PROJECT.
2. REFER TO DETAILS AND NOTES FOR MOUNTING HEIGHTS.
D) CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION (CDCR)
DESIGN CRITERIA GUIDELINES (DCG)
SHEET NO.
SHEET INDEX
DESCRIPTION
MP001 MECHANICAL / PLUMBING LEGNED, NOTES AND SCHEDULES
MPA201 MECHANICAL / PLUMBING TYPICAL 270 HOUSING UNIT ROOF PLAN DEMOLITION
MPA301 MECHANICAL / PLUMBING TYPICAL 270 HOUSING UNIT ROOF PLAN REMODEL
MPA302 PLUMBING TYPICAL 270 HOUSING UNIT ROOF PLAN RAINWATER
MPB201 MECHANICAL / PLUMBING FACILITY A 270 HU BUILDINGS 334 ROOF PLAN DEMOLITION
MPB301 MECHANICAL / PLUMBING FACILITY 270 HU BUILDINGS 334 ROOF PLAN REMODEL
MPB302 PLUMBING 270 HU BUILDINGS 334 ROOF PLAN RAINWATER
MPC201 MECHANICAL / PLUMBING 270 HU BUILDINGS 346 THRU 347 ROOF PLAN DEMOLITION
MPC301 MECHANICAL / PLUMBING 270 HU BUILDINGS 346 THRU 347 ROOF PLAN REMODEL
MPC302 PLUMBING 270 HU BUILDINGS 346 THRU 347 ROOF PLAN RAINWATER
MP501 MECHANICAL / PLUMBING DETAILS
MP502 MECHANICAL / PLUMBING DETAILS
MP801 MECHANICAL / PLUMBING PHOTOS
MP802 MECHANICAL / PLUMBING PHOTOS
GENERAL MECHANICAL/PLUMBING NOTES
1. SEAL AIRTIGHT ALL SEAMS OF ALL SUPPLY RETURN AND EXHAUST DUCT WITH HARDCAST INC. FOIL GRIP 1402 181 BFX INDOOR/OUOTDOOR ROLL SEALANT WITH 12 MIL. BUTYL BACKING. ROLL SEALANT CAN ONLY BE APPLIED TO BARE (NOT PAINTED) GALVANIZED DUCTWORK. REMOVE PAINT WHERE PAINT EXIST.
2. WHERE EXISTING DUCT FLEX CONNECTION EXIST, PROVIDE NEW DUCT FLEX CONNECTOR ON INLET AND OUTLET OF AC UNIT, AIR HANDLER AND HEATING/EVAPORATIVE COOLING UNIT. FLEX CONNECTOR SHALL BE U.L. R 4462 COMPLIANT,15000 CYCLES RATED, MIN 22 OZ / SQ. YD., NFPA 90A, 90B COMPLIANT, WOVEN NYLON / POLYESTER EXCELON DURO DYNE OR, VENT FABRICS EQUAL. PROVIDE WITH SHEET METAL COVER
TO BLOCK U.V.
3. LEAVE ALL CONTROLS INTACT. PROVIDE TEMPORARY DISCONNECTION AND RECONNECTION FOR RE-ROOF.
VERIFY EQUIPMENT WORKS PRIOR TO DEMOLITION AND VERIFY AFTER WORK IS COMPLETE, THAT EQUIPMENT IS FUNCTIONING PROPERTY. REPORT ALL TEST FAILURES OF EXISTING SYSTEMS PRIOR TO DISCONNECTING. WHERE CONTROL WIRING IS EXTENDED DUE TO RAISED HEIGHT OF EQUIPMENT, REPLACE
FEEDERS WITH SIMILAR SIZED FEEDER.
4. BUILDINGS TO REMAIN OPERATIONAL DURING CONSTRUCTION. HVAC, EXHAUST FANS, FLUES, VENTS, ARE TO REMAIN IN PLACE EXCEPT FOR SCHEDULED QUICK LIFTS TO ALLOW NEW ROOFING, MATERIALS AND
MODIFICATIONS.
5. PRESSURE TEST ALL MODIFIED DOMESTIC WATER PIPING AT 50PSI HIGHER THAN OPERATION PRESSURE, 4
HOURS WITH NO PRESSURE LOSS.
6. PROVIDE ALL NEW FLASHING AT PIPES AND DUCT PENETRATIONS.
7. PROVIDE INSULATION AND JACKET FOR PIPES ON ROOF WHERE REQUIRED. REFER TO SPECIFICATION 22 07
19 FOR REQUIREMENTS.
8. INSPECT ALL HVAC EQUIPMENT AND IDENTIFY IF IT IS NOT WORKING PRIOR TO REMOVAL. DOCUMENT ISSUE AND SUBMIT TO CDCR PM. DOCUMENT ALL EQUIPMENT THAT IS DAMAGED. FAILURE TO DOCUMENT DAMAGE
OR NON-FUNCTIONAL SYSTEMS COULD CAUSE FOR CONTRACTOR TO REPAIR EQUIPMENT.
9. ROOF SHALL BE TESTED IN ACCORDANCE WITH CPC 2022 SECTION 1107.2.1 OR SECTION 1107.2.2 TO
DISCLOSE LEAKS AND DEFECTS.
10.ANY GAS PIPING DISCONNECTED AND THE RECONNECTED SHALL BE TESTED AND INSPECTED FOR LEAKS IN
ACCORDANCE WITH 2022 CPC SECTION 1213 AND NFPA 54.
11.PROVIDE TEMPORARY COVERS ON ALL EXPOSED OPEN EQUIPMENT, DUCTS AND PIPES AND REMOVE
COVERS AND DEBRIS UPON PLACEMENT OF TEMPORARILY REMOVED EQUIPMENT
12.ALL EXISTING HVAC UNITS ARE TO BE REINSTALLED AT THE ORIGINAL LOCATIONS. LABEL EACH UNIT WITH A UNIQUE STENCIL FOR THE PURPOSE OF KEEPING TRACK OF ORIGINAL LOCATION. REFER TO ROOF PLANS FOR NAMING DESIGNATIONS OR SUBMIT A SHOP DRAWING WITH A NAMING DESIGNATION MATCHING THE
STENCILED LABELS.
13.PLUMBING CONTRACTOR TO CHECK CONDUCTOR/DOWNSPOUT AND CLEAR THEM OF DEBRIS AFTER
INSTALLATION OF NEW ROOF DRAIN SYSTEM.
14.REINSTALLATION OF EXISTING COOLING SYSTEM SHALL NOT DECREASE ECONOMIZER CAPABILITY.
15.PROVIDE STARTUP PROCEDURES FOR ALL MECHANICAL EQUIPMENT THAT WAS REMOVED AND
REINSTALLED. STARTUP PROCEDURE SHALL INCLUDE THE FOLLOWING MINIMUM REQUIREMENTS.
A. VERIFY AND RECORD VOLTAGE, AMPERAGE, AND NAMEPLATE DATA FOR EACH MOTOR IN EACH PIECE OF EQUIPMENT (INCLUDES BUT NOT LIMITED TO EXHAUST FANS, AC UNIT FANS, AHU FANS, CIRCULATING
PUMPS).
B. VERIFY CORRECT ROTATION OF EACH FAN.
C. VERIFY START/STOP COMMANDS FUNCTION PROPERLY WITH THE CONTROLS.
D. VERIFY ALL MODES OF OPERATION FUNCTION PROPERLY (HEATING, COOLING, ECONOMIZER, ETC).
E. TEST DELTA T (°F) ACROSS HEATING AND COOLING UNITS TO SHOW THEY ARE PERFORMING
PROPERLY. IDENTIFY OUTSIDE AIR TEMP, MIXED AIR TEMPERATURE, AND DISCHARGE AIR
TEMPERATURE. RECORD RESULTS AND SUBMIT TO CDCR.
F. VERIFY SAFETY SHUTDOWNS PERFORM PROPERLY (i.e. DUCT SMOKE DETECTORS REINSTALLED ARE TO BE TESTED TO ENSURE THEY SHUT DOWN EQUIPMENT AND ALARM THE FIRE ALARM CONTROL PANEL
PER THEIR CURRENT OPERATION BEFORE PROJECT DEMOLITION).
G. PROVIDE STARTUP REPORT FOR EACH PIECE OF EQUIPMENT. IDENTIFY ISSUES FOUND (i.e. BROKEN BELTS, BELTS REQUIRING TIGHTENING OR ALIGNMENT, DAMPERS MALFUNCTIONING, LINKAGE BROKEN, etc). COMPANY PROVIDING STARTUP SHALL HAVE A MINIMUM OF 7 YEARS OF EXPERIENCE IN STARTUP
OF SIMILAR EQUIPMENT.
H. CERTIFIED BALANCE REPORT IS NOT REQUIRED AS EQUIPMENT IS BEING REINSTALLED WITHOUT MODIFICATION. IF DUCTWORK IS REMOVED THAT HAS BALANCE DAMPERS, CONTRACTOR IS REQUIRED TO MARK POSITIONS OF DAMPERS SO THEY CAN BE RESET TO THE SAME POSITION IF MOVED. TAKE
CARE NOT TO ADJUST EXISTING BALANCE DAMPERS.
16. EACH VENT SHALL TERMINATE NOT LESS THAN 10 FEET FROM OR NOT LESS THAN 3 FEET ABOVE, AN OPENABLE WINDOW, DOOR, OPENING, AIR INTAKE, OR SHAFT VENT, OR NOT LESS THAN 3 FEET IN EVERY
DIRECTION FORM A LOT LINE, ALLEY AND STREET EXCEPTED.
PROJECT SCOPE OF WORK
THE PROJECT IS RE-ROOFING PROJECT WITH NEW INSULATION ON ROOF. THE ADDITION OF NEW
INSULATION ON ROOF REQUIRES THE EXISTING MECHANICAL SYSTEMS TO BE RAISED FOR
RE-ROOFING AND FOR INSTALLATION OF NEW CURB ADAPTORS OR NEW CURBS. THE PROJECT
SCOPE DOES NOT INCLUDE UPGRADE OF EXISTING MECHANICAL SYSTEM OR REPLACE EXISTING
NON COMPLIANT SYSTEMS. THE PROJECT SCOPE IS NOT TO RESOLVE EXISTING NON-COMPLIANT
SYSTEM SUCH AS MINIMUM DISTANCE OF FRESH AIR INTAKE FROM VENTS & EXHAUSTS.
REFER TO DRAWINGS FOR SPECIFICS. B) 2023 COUNTY OF LOS ANGELES CODE AMENDMENTS
RD-1 ROOF DRAIN, "ZURN" Z121-DP-E, TOP SET DECK PLATE, STATIC EXTENSION AND LOW
SILHOUETTE DOME.
OFD-1 ROOF RECEPTOR, "ZURN" Z121-DP-89, 2" WATER DAM COLLAR, TOP SET DECK PLATE,
STATIC EXTENSION AND LOW SILHOUETTE DOME.
EQUAL PRODUCTS: JR SMITH, JONESPEC.
PLUMBING FIXTURE SCHEDULE
Project Engineer:
U R L E YT M E C H A N IC A L
E N G I N E E R I N G
G R O U P, I N C.& ASSOCIATES
(916) 325-1065
FAX: (916) 325-1075
Email: office@turleymech.com
2431 Capitol Avenue Sacramento, CA 95816
Project Manager:
GYang
Job Number:
Project Drafter: Login:
Plot Date: Aug 25, 2023 - 4:07pm
22107-PH1JT
JT
SHEET NUMBER
S
TA
TE
O
F C
A
LI
FO
R
N
IA
D E P A R
TM
E N
T O
F C
O R
R E C
TI
O
N S A
N D
R E H
A B
IL
IT
A
TI
O N
FA
C
IL
IT
Y P
LA
N
N
IN
G , C
O N
S
TR
U C
TI
O
N A
N D
M A N
A G
E M
E N
T D
IV
IS
IO
N
DE
SI
G N
SE
RV
IC
ES
A
ND
S
TA
ND
AR
DS
B
RA
NC
H
DE
SI
G
N
SE
RV
IC
ES
S
EC
TI
O N
APPROVAL
L A C
V1
C A L
IF
O R
N
IA
S T A T E P
R
IS
O N
L O
S A
N G
E L E S C
O U
N T Y
T H
S T R
E E T , W
E S T
LA
N
C A S T E R
, C A
R E P L A C
E R
O O
F S
P H
A S E
A U
G U
S T
W O
R K
IN
G D
R A W
IN
G
S
.1
A rc h it e ct s, I n c.
H
IB
S E R Y
A M
A U C
H I n d S tr e e t, S u it e
D a vi s, C
A
.7
.1 o ff ic e
.7
.4 f a x
MP001
M E C
H A N
IC
A L P
L U M
B
IN
G L
E G
N E D
N
O T E S A
N D S
C H
E D
U L E S
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
10/10/23
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
23-0002
11/20/2023 CASp 491 #1317
File details come from the government source that posted it. Updated .