This document is an electrical demolition roof plan for the California Department of Corrections and Rehabilitation (CDCR) at the California State Prison, Los Angeles County (LAC) located in Lancaster, California. The project involves replacing roofs for 270 Housing Unit Buildings 346-347 during Phase 1 of a roof replacement project, with detailed electrical demolition specifications for existing conduits, electrical circuits, junction boxes, and mechanical equipment. The plan is dated August 29, 2023, with working drawings prepared by M. Neil Engineering and approved by the Office of the State Fire Marshal on October 10, 2023.

The electrical demolition plan includes specific instructions for safely disconnecting existing electrical circuits, removing portions of existing conduits and wiring, replacing junction boxes and service receptacles, and maintaining fire alarm devices and circuit continuity during construction. Key requirements include placing existing electrical circuits in a "safe-off" condition, not damaging HVAC ducts with duct detectors, and ensuring that new conduit, wiring, and electrical installations match existing specifications. The project involves careful coordination with mechanical systems and adherence to strict electrical safety and replacement protocols for the prison facility's roofing repair work.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_14.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(E) 3/4" CONDUIT UP

THROUGH ROOF

(E)

(R)

(E) (3) 3/4" CONDUITS

IN PITCH POCKET

(E) 1-1/2" CONDUIT UP

THROUGH ROOF

(E) (3) 3/4" CONDUITS

IN PITCH POCKET

(E) (2) 3/4" CONDUITS

IN PITCH POCKET

J

(E) (3) 3/4" CONDUITS

UP THROUGH ROOF

TO DUCT DETECTORS

AND CONTROLS

(E) 3/4" CONDUIT UP

THROUGH ROOF TO

J-BOX

(R)

(E) 1-1/2" CONDUIT UP

THROUGH ROOF

(E) MAIN CIRCUIT

BREAKER

DISCONNECT

J

(R)

(E) CONTROL

PANELS

(E) MAIN CIRCUIT

BREAKER

DISCONNECT

(E) 1-1/2" CONDUIT UP

THROUGH ROOF

(E) (4) 3/4" CONDUITS

UP THROUGH ROOF

(E) (3) 3/4" CONDUITS

UP THROUGH ROOF

TO DUCT DETECTORS

AND CONTROLS

(E) 3/4" CONDUIT UP

THROUGH ROOF TO

J-BOX

(E) (3) 3/4" CONDUITS

UP THROUGH ROOF

TO DUCT DETECTORS

AND CONTROLS

J

(E) 3/4" CONDUIT UP

THROUGH ROOF TO

J-BOX

(R)

(E) 1-1/2" CONDUIT UP

THROUGH ROOF

(E) (4) 3/4" CONDUITS

UP THROUGH ROOF

(E) CONTROL

PANELS

(E) MAIN CIRCUIT

BREAKER

DISCONNECT

3 1 1.8 2 6 4 5 7 8 9 1110

B.4

A

B

D

C

J

E

F

G

H

K

K.8

L

M

1 111.8 2 3 4 5 6 7 8 9 105.7 7.3

A

B

B.7

D

E.7

G.3

J

K.7

L

M

(E

S L O

P E

/4

(E) SLOPE

1/4" : 1'-0"

(E

S L O

P E

/4

(E

S L O

P E

/4

(E

S L O

P E

/4

(E

S L O

P E

/4

(E

S L O

P E

/4

RIDGE

(E) CONTROL

PANELS

(E) (4) 3/4" CONDUITS

UP THROUGH ROOF

EXISTING MECHANICAL UNIT TO BE DISCONNECTED FOR ROOF REPAIR. COORDINATE WITH

MECHANICAL. REINSTALL USING NEW ELECTRICAL CONDUIT, CONDUCTORS AND DEVICES.

CONDUIT SIZE, WIRING SIZE, QUANTITY AND TYPE SHALL MATCH EXISTING. SEE REMODEL PLAN

"1/EA301".

EXISTING NON-GFCI RECEPTACLE TO BE REPLACED. SEE REMODEL PLAN "1/EA301".

NUMBERED NOTES

GENERAL NOTES

1. PLACE ALL EXISTING ELECTRICAL CIRCUITS FEEDING EXISTING HVAC AND ELECTRICAL EQUIPMENT ON

ROOFTOP IN A "SAFE-OFF" CONDITION, PRIOR TO CONSTRUCTION. NO NEW LOADS ADDED TO

CIRCUITS.

2. REMOVE PORTIONS OF EXISTING CONDUITS AND WIRING NECESSARY TO RE-ROOF EXISTING

BUILDING.

3. DO NOT DAMAGE DURING CONSTRUCTION AND REUSE ALL EXISTING CIRCUITS, PROVIDE NEW HVAC DISCONNECTS, PROVIDE NEW WEATHERPROOF GFCI SERVICE RECEPTACLES TO REPLACE EXISTING

RECEPTACLES FOR REMODEL.

4. REMOVE EXISTING JUNCTION BOXES AND FLEX CONDUITS BACK TO ROOF PENETRATION POINT, AND DO NOT REUSE. REPLACE ALL ABOVE ROOF CONDUITS WITH NEW - WIRING SIZE, QUANTITY AND TYPE SHALL MATCH EXISTING. SPLICE IN POWER WIRING IS NOT ACCEPTABLE. NEW CONTROL WIRING TO HVAC EQUIPMENT MAY ONLY BE INSTALLED FOR THE RUN FROM THE EQUIPMENT CONTROL PANEL TO

THE NEAREST EXISTING TERMINATION POINT OR SPLICE LOCATION. INSTALL NEW EMT WITH

COMPRESSION FITTINGS AND LIQUID-TIGHT METAL CONDUIT TERMINATION AT THE MECHANICAL

EQUIPMENT .

5. DO NOT DAMAGE HVAC DUCTS WITH DUCT DETECTORS. MAINTAIN FIRE ALARM DEVICE AND CIRCUIT

DURING CONSTRUCTION.

6. DO NOT DAMAGE WP SERVICE RECEPTACLE BACK BOXES. REMOVE ANCHORING, AS NEEDED, TO

ALLOW MOVEMENT DURING ROOFING REPAIR. MAINTAIN CIRCUIT CONTINUITY AND RECEPTACLE

FUNCTIONALITY AFTER CONSTRUCTION.

7. REPLACE JUNCTION BOXES. REPLACEMENT BOX TO MATCH EXISTING TYPE AND SIZE.

SHEET NUMBER

S

TA

TE

O

F C

A

LI

FO

R N

IA

D

E P A R

TM

E N

T O

F C

O R

R E C

TI

O

N S A

N D

R E H

A B

IL

IT

A

TI

O N

FA

C

IL

IT

Y P

LA

N

N

IN

G , C

O N

S

TR

U C

TI

O

N A

N D

M A N

A G

E M

E N

T D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G

N

SE

RV

IC

ES

S

EC

TI

O N

APPROVAL

L A C

V1

C A L

IF

O R

N

IA

S T A T E P

R

IS

O N

L O

S A

N G

E L E S C

O U

N T Y

T H

S T R

E E T , W

E S T

LA

N

C A S T E R

, C A

.1

Electrical Engineers Lighting Designers

100 Howe Ave., Suite 235N

Sacramento, CA 95825-8217

PROJECT #:

www.mneilsengineering.com

Tel: (916) 923-4400

PROJECT MGR: Stuart LinGsa\

21318.21

08/29/2023

R E P L A C E R

O O

F S

P H

A S E

A U

G U

S T

W O

R K

IN

G D

R A W

IN

G

S

1/8"=1'-0"

270 HOUSING UNIT BLDGS 346-347 ROOF PLAN - DEMOLITION - ELECTRICAL1

EC201

EC201

H

O U

S

IN

G U

N

IT

B L D

G S

-3

R

O O

F P

L A

N D

E M

O L

IT

IO

N

E L E C

T R

IC

A L

5'

1/8" = 1'-0"

0 25'10' 15' 20'

GRAPHIC SCALE

N

N

BUILDING 347BUILDING 346

V1

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp-491 #1317