This document is a mechanical/plumbing roof plan remodel drawing for the California State Prison, Los Angeles County (LAC), located in Lancaster, California, prepared by Turley Mechanical Engineering and Associates Group and Hibser Yamauchi Architects. The project involves a Phase 1 roof replacement for multiple housing units (Buildings 331-349), specifically focusing on the mechanical and plumbing systems of the 270 Housing Unit. The drawing details the remodeling of existing equipment, including air handling units (AHUs), air conditioning units, exhaust fans, water heaters, and various piping systems, with specific instructions for reinstallation, reconnection, and adaptation of existing infrastructure.
The document includes a comprehensive existing equipment schedule noting that no as-built drawings were available and many units' nameplates were unreadable or missing, requiring contractors to field verify unit information. The project has received approval from the Office of the State Fire Marshal (approval number 23-0002) and includes a Certified Access Specialist (CASp) certification. The drawing provides detailed notes on reinstallation procedures, including reconnecting controls, piping, drains, and ducting, with specific instructions for curb extensions, pipe offsets, and maintaining existing equipment sizes and materials. The project is scheduled for implementation, with the plot date indicating preparation on August 25, 2023, and a project number of JT 22107-PH1.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 61.8 2 3 4 5 7 118 9 10
A
B
C
B.4
F
D
E
H
G
J
K
K.8
L
M
1 111.8 2 3 4 5 6 7 8 9 105.7 7.3
A
B
B.7
D
E.7
G.3
J
K.7
L
M
K
H
E
C
F
G
D14
08 08 08 08 08 08 08 08
07 07 07 07 07 07 07 07
070808 080808 08 08 08 07070707 07 07 07 07
(E)AC-1
(E)AHU-1
(E)AHU-2
(E)AHU-3
(E)EF-1(E)EF-2 (E)EF-3 (E)EF-4
(E)EF-5
(E)EF-6 (E)EF-7 (E)EF-8 (E)EF-9
(E)EF-32
(E)EF-10
(E)EF-11
(E)EF-12
(E)EF-13
(E)EF-30
(E)EF-14
(E)EF-15
(E)EF-16
(E)EF-17
(E)EF-29
(E)EF-28
(E)EF-18 (E)EF-19 (E)EF-20 (E)EF-21 (E)EF-22 (E)EF-23 (E)EF-24 (E)EF-25 (E)EF-26
(E)EF-27
(E)EF-31
(E)EF-33
(E)WH-1
(E)1 14"CD
(E)1 14"CD
(E)11
4"CD
D14
(E)3 4"ICW
(E)11
2"MPG
(E)3 4"MPG
(E)3 4"MPG
(E)3 4"MPG
(E)3 4"CD
(E)3 4"MPG
16A
Project Engineer:
U R L E YT M E C H A N IC A L
E N G I N E E R I N G
G R O U P, I N C.& ASSOCIATES
(916) 325-1065
FAX: (916) 325-1075
Email: office@turleymech.com
2431 Capitol Avenue Sacramento, CA 95816
Project Manager:
GYang
Job Number:
Project Drafter: Login:
Plot Date: Aug 25, 2023 - 4:07pm
22107-PH1JT
JT
SHEET NUMBER
S
TA
TE
O
F C
A
LI
FO
R N
IA
D E P A R
TM
E N T
O F
C O
R R
E C
TI
O
N S A
N D R
E H
A B
IL
IT
A
TI
O N
FA
C
IL
IT
Y P
LA
N N
IN
G , C
O N S
TR
U C
TI
O
N A
N D
M A N A G
E M
E N
T D
IV
IS
IO
N
DE
SI
G N
SE
RV
IC
ES
A
ND
S
TA
ND
AR
DS
B
RA
NC
H
DE
SI
G
N
SE
RV
IC
ES
S
EC
TI
O N
APPROVAL
L A C
V1
C A L
IF
O R
N
IA
S T A T E P
R
IS
O N L O
S A
N G
E L E S C
O U N T Y
T H
S T R
E E T , W
E S T
LA
N C
A S T E R
, C A
R E P L A C E R
O O
F S
P H
A S E
A U
G U
S T
W O
R K
IN
G D
R A W
IN
G
S
.1
A rc h it e ct s, I n c.
H
IB
S E R Y
A M
A U C
H I n d S tr e e t, S u it e
D a vi s, C
A
.7
.1 o ff ic e
.7
.4 f a x
MPA301
M E C
H A N
IC
A
L P
L U
M B
IN
G
T Y P
IC
A L
H
O U
S
IN
G U
N
IT
R O
O F P
L A N
R E M
O D
E L
GENERAL NOTES
16A (E) INDUSTRIAL COLD WATER PIPING PENETRATE INTO CURB, TEMPORARY
DISCONNECTED, RE-ROUTED AND RECONNECTED. DETAIL SEE
18 RECONNECT (E) NATURAL GAS PIPING CONNECT TO AC OR AHU W/ (E)PRESSURE
REGULATOR. DETAIL SEE
1. PROVIDE START UP OF ALL EQUIPMENT TO ENSURE IT IS OPERATING
PROPERLY. SEE GENERAL MECHANICAL/PLUMBING NOTES ON MP001.
2. WHERE SIZES ARE LARGER THAN SHOWN, MATCH (E)SIZES TO
MAINTAIN THE SAME SIZE AS EXISTING CONDITIONS.
3. FIELD VERIFY EXISTING GAS PIPE MATERIAL AT EACH BUILDING.
MATERIAL OF NEW GAS PIPING AND FITTINGS SHALL MATCH EXISTING
PIPING MATERIAL.
4. FIELD VERIFY EXACT HEIGHT OF EACH (E) CURB. IF TOP (E)CURB IS
EQUAL TO OR MORE THAN 8" ABOVE NEW FINISHED ROOF TOP, (E)UNIT
ON THE CURD CAN BE REMAIN IN PLACE AND PROTECTED DURING
CONSTRUCTION. INSTALL (N)FLASHING ON (E)CURB AFTER
REROOFING.
RE-INSTALL (E) AHU ON (N) RAISED CURB. RECONNECT ALL CONTROLS, PIPING,
DRAINS AND DUCTING. PROVIDE EXACT MEASUREMENTS OF CURB FOR THE
ADDITION OF A CURB EXTENDER. VERIFY DUCT SIZE. MOUNTING DETAIL SEE
, PIPING (GAS, WATER AND DRAIN) CONNECTION SEE
05 RE-INSTALL (E) AC UNIT ON (N) RAISED CURB. RECONNECT ALL CONTROLS,
PIPING, DRAINGS AND DUCTING. VERIFY DUCT SIZE. PROVIDE EXACT
MEASUREMENTS OF CURB FOR THE ADDITION OF A CURB ADAPTOR. MOUNTING
DETAIL SEE , GAS PIPE CONNECTION DETAIL SEE ,
CONDENSATE DRAIN CONNECTION SEE
RE-INSTALL (E) EXHAUST FAN ON (N) RAISED CURB, PROVIDE EXACT
MEASUREMENTS OF CURB FOR THE ADDITION OF A CURB ADAPTOR. SEE
DETAIL
(N) PLUMBING VENT PIPE @ (E) PENETRATION, TOTAL 29 VENT ON ROOF WITHIN
CONSTRUCTION AREA. RAISE VENT TO MAINTAIN REQUIRED DISTANCE FROM
TOP OF VENT TO TOP OF ROOF. DETAIL SEE
(E) CONDENSATE DRAIN (D) THRU ROOF, RECONNECTED, PROVIDE NEW FLASHING
AND NEW OFFSET. DETAIL SEE
(E) CONDENSATE DRAIN PIPING, TO BE REINSTALLED. PROVIDE NECESSARY
OFFSET FOR NEW HEIGHT OF CURB. NEW PIPE SIZE IS TO MATCH EXISTING.
REPLACE (E)PIPING WITH SAME SIZE (N)PIPING IS ACCEPTABLE. PIPE SUPPORT
DETAIL SEE
(E) INDUSTRIAL COLD WATER PIPING, TO BE REINSTALLED. PROVIDE NECESSARY
OFFSET FOR NEW HEIGHT OF CURB. NEW PIPE SIZE IS TO MATCH EXISTING.
REPLACE (E)PIPING WITH SAME SIZE (N)PIPING IS ACCEPTABLE. PIPE SUPPORT
DETAIL SEE
(E) INDUSTRIAL COLD WATER PIPE (R) THRU ROOF, RECONNECTED, PROVIDE NEW
FLASHING AND NEW OFFSET. DETAIL SEE
(E) MEDIUM PRESSURE NATURAL GAS PIPING, TO BE REINSTALLED. PROVIDE
NECESSARY OFFSET FOR NEW HEIGHT OF CURB. NEW PIPE SIZE IS TO MATCH
EXISTING. REPLACE (E)PIPING WITH SAME SIZE (N)PIPING IS ACCEPTABLE. PIPE
SUPPORT DETAIL SEE
G
MP501
H,I
MP501
A
MP502
E
MP501
H
MP501
I
MP501
A
MP501
B
MP501
C
MP501
F
MP501
D
MP501
F
MP501
C
MP502
D
MP501
H
MP501
BUILDING 332 BUILDING 331
N
N
N
BUILDING 333 BUILDING 335
N
BUILDING 336 BUILDING 337 BUILDING 338 BUILDING 339 BUILDING 3310 BUILDING 341 BUILDING 342 BUILDING 343 BUILDING 344
N
N N N
N
N
BUILDING 345
N N
N
N
BUILDING 348 BUILDING 349 BUILDING 3410
N N
N
(E)AHU-1 THRU 3 EXISTING HANDLING UNIT, "ENERGY LAB" UNIT W/
"REZNOR" NATURAL GAS FURNACE AND EVAP COOLER,
MODEL# AND DETAILED INFORMATION UNKNOWN.
(E)AC-1 EXISTING AIR CONDITIONING UNIT ON HIGH ROOF,
ROOF TOP UNIT W/ NATURAL GAS FURNACE,
MANUFACTURE, MODEL# AND DETAILED INFORMATION
UNKNOWN.
(E)EF-1 THRU 33 EXISTING EXHAUST FAN, UNIT MODEL# AND DETAILED
INFORMATION UNKNOWN.
(E)WH-1 EXISTING WATER HEATER ON HIGH ROOF.
"TURBOPOWER" LOW NOX CATEGORY I FAN-ASSISTED
STORAGE WATER HEATER, 500 LHE 250A-TPL, 250
GALLON, 399,000 BTU/HR NATURAL GAS INPUT,
4.5"-10.5" W.C. GAS INLET PRESSURE, 120V/1PH/60 HZ,
5AMPS.
NOTES:
1. NO AS-BUILT DRAWING FOR THE BUILDINGS. NAMEPLATE FOR
MOST UNITS CANNOT BE FOUND OR NOT READABLE. CONTRACTOR
SHALL FIELD VERIFY ACTUAL UNIT INFORMATION FOR EACH BUILDING.
2. MANY AHU'S WERE FOUND TO BE LEAKING. THEY MUST BE
REPAIRED PRIOR TO REROOFING.
EXISTING EQUIPMENT SCHEDULE
REMODEL NOTES
(E) G, CW, HW, HWR UTR, RECONNECTED, PROVIDE (N)CURB ADAPTOR FOR
MULTIPLE PIPES OR (N)FLASHING FOR SINGLE PIPE. PROVIDE NECESSARY
OFFSET. SINGLE PIPE PENERTRATION DETAIL SEE
MULTIPLE PIPE PENETRATION DETAIL SEE
(E) 36X24 DUCT ON ROOF, REINSTALLED AND PROVIDE NEW DUCT SUPPORT.
DETAIL SEE
(E) DUCT THRU ROOF. PROVIDE NEW CURB EXTENSION AND EXTEND/MODIFY
DUCT. RE-INSULATE DUCT. DETAIL SEE
D
MP502
B
MP502
G
MP502
F
MP501
19 RE-INSTALL (E) WATER HEATER ON (N) CURBS. RECONNECT ALL CONTROLS
AND PIPING, MOUNTING DETAIL SEE AND , WATER PIPE
CONNECTION DETAIL SEE ,
NATURAL GAS PIPE CONNECTION SEE
A906 F
MP502
H
MP501
S501
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
10/10/23
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
23-0002
11/20/2023 CASp 491 #1317
File details come from the government source that posted it. Updated .