About this file

This is a mechanical/plumbing demolition roof plan drawing for the California State Prison, Los Angeles County (LAC) located in Lancaster, California, prepared by Turley Mechanical Engineering & Associates Group and Hibser Yamauchi Architects. The project involves a Phase 1 reroofing effort for multiple housing units (Buildings 331-349), with specific focus on removing and temporarily relocating existing mechanical equipment including air handling units (AHUs), air conditioning units, exhaust fans, water heaters, and various piping systems to facilitate roof replacement. The drawing is dated August 31, 2023, and includes detailed demolition notes for each type of existing roof equipment, with instructions for careful removal, labeling, protection, and potential reinstallation.

The document indicates that no as-built drawings were available, requiring contractors to field verify actual unit information for each building. Many air handling units were noted as leaking and requiring repair prior to reroofing. The project involves 33 exhaust fans, multiple AHUs, one air conditioning unit, and one water heater across the prison facility. The drawing has received approval from the Office of the State Fire Marshal on 10/10/23, with a final approval date of 11/20/2023. The project is being managed by the California Department of Corrections and Rehabilitation's Facility Planning, Construction and Management Division, with design services provided by Hibser Yamauchi Architects.

View the file

Other files

File Type Posted
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_30.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_36.pdf PDF
I-001104_-_21-040_-_002_-_Roof_Penetrations.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_10.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_37.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_9.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_13.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_32.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_48.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_26.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_21.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_51.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_6.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_31.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_25.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_38.pdf PDF
21-039_LAC_Replace_Roofs_Volume_1.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_34.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_27.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_40.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_7.pdf PDF
21-039_LAC_Replace_Roofs_Volume_2.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_23.pdf PDF
12_-_FPCM-LAC-I001104-M035-RS.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_47.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_42.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_33.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_12.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_16.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_3.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_20.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_18.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_46.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_39.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_35.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_22.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_5.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_24.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_28.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_43.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_15.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_50.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_4.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_19.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_49.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_8.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_29.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_17.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_41.pdf PDF
21-040-LAC_Replace-Roofs-Phase1_Final-Drawings_45.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3 1 1.8 2 6 4 5 7 8 9 1110

B.4

A

B

D

C

J

E

F

G

H

K

K.8

L

M

1 111.8 2 3 4 5 6 7 8 9 105.7 7.3

A

B

B.7

D

E.7

G.3

J

K.7

L

M

D04

TYP

D11

D07

D13

D05

D05

D05

D05

D19

D10

D10

D11

D14

D04

D08

D08

D21

D20

D20

D20

D11 D11 D11

D11 D11 D11

D11

D11

D11

D11

D10 D10 D10

D10 D10 D10

D10

D10

D10

D10

D04 D04 D04 D04 D04 D04 D04 D04 D04D04 D04 D04 D04

D04D04 D04D04 D04 D04 D04

D04

D04 D04 D04 D04 D04 D04

D08 D08 D08 D08 D08 D08 D08 D08

D08

D08

D08

D08

D08

D08

D08

D08

D08

D08

D08

D07 D07 D07 D07 D07 D07 D07 D07

D07D08D08 D08D08D08D08D08D08 D07D07D07D07D07D07D07D07

D07

D07

D07

D07

D07

(E)AC-1

(E)AHU-1

(E)AHU-2

(E)AHU-3

(E)EF-1(E)EF-2 (E)EF-3 (E)EF-4

(E)EF-5

(E)EF-6 (E)EF-7 (E)EF-8 (E)EF-9

(E)EF-32

(E)EF-10

(E)EF-11

(E)EF-12

(E)EF-13

(E)EF-30

(E)EF-14

(E)EF-15

(E)EF-16

(E)EF-17

(E)EF-29

(E)EF-28

(E)EF-18 (E)EF-19 (E)EF-20 (E)EF-21 (E)EF-22 (E)EF-23 (E)EF-24 (E)EF-25 (E)EF-26

D07

(E)EF-27

(E)EF-31

(E)EF-33

(E)WH-1

D22

D22

D22

(E)1 14"CD

(E)1 14"CD

(E)11

4"CD

D14

D14

D14

D14

D15

(E)34"ICW

D16

D16

D17

(E)11

2"MPG

D17

(E)34"MPG

D17

(E)34"MPG

D17

(E)34"MPG

(E)34"CD

D17

(E)34"MPG

D16A

D18

D18

D18

D18

Project Engineer:

U R L E YT M E C H A N IC A L

E N G I N E E R I N G

G R O U P, I N C.& ASSOCIATES

(916) 325-1065

FAX: (916) 325-1075

Email: office@turleymech.com

2431 Capitol Avenue

Sacramento, CA 95816

Project Manager:

GYang

Job Number:

Project Drafter: Login:

Plot Date: Aug 25, 2023 - 4:07pm

22107-PH1JT

JT

SHEET NUMBER

S

TA

TE

O

F C

A

LI

FO

R N

IA

D

E P A R

TM

E N T

O F

C O

R R

E C

TI

O

N S A

N D R

E H

A B

IL

IT

A

TI

O N

FA

C

IL

IT

Y P

LA

N

N

IN

G , C

O N

S

TR

U C

TI

O

N A

N D

M A N A G

E M

E N

T D

IV

IS

IO

N

DE

SI

G N

SE

RV

IC

ES

A

ND

S

TA

ND

AR

DS

B

RA

NC

H

DE

SI

G

N

SE

RV

IC

ES

S

EC

TI

O N

APPROVAL

L A C

V1

C A L

IF

O R

N

IA

S T A T E P

R

IS

O N

L O

S A

N G

E L E S C

O U N T Y

T H

S T R

E E T , W

E S T

LA

N

C A S T E R

, C A

R E P L A C

E R

O O

F S

P H

A S E

A U

G U

S T

W O

R K

IN

G D

R A W

IN

G

S

.1

A rc h it e ct s, I n c.

H

IB

S E R Y

A M

A U C

H I n d S tr e e t, S u it e

D a vi s, C

A

.7

.1 o ff ic e

.7

.4 f a x

DEMOLITION NOTES

GENERAL NOTES

D07 (E) EXHAUST FAN TO BE REMOVED FROM THE EXISTING CURB AND PROTECTED

TO ALLOW FOR THE REROOF. INSPECT EXISTING BACKDRAFT DAMPER AND

LUBRICATE AND CLEAN DAMPER. LABEL FAN (STENCIL PAINT 2" HIGH LETTERS)

BEFORE REMOVAL. LABEL WITH CORRESPONDING NUMBERS LISTED ON PLANS.

PHOTO SEE

D11 (E) SCUPPER CONDUCTOR HEAD, TR, PHOTO SEE

H

MP801

1. WHERE PIPE SIZES ARE DIFFERENT THAN SHOWN, MATCH (E)SIZES TO

MAINTAIN THE SAME PIPE SIZE AS EXISTING CONDITIONS.

2. FIELD VERIFY EXACT HEIGHT OF EACH (E) CURB. IF TOP (E)CURB IS EQUAL

TO OR MORE THAN 8" ABOVE NEW FINISHED ROOF TOP, (E)UNIT ON THE

CURD CAN BE REMAIN IN PLACE AND PROTECTED DURING

CONSTRUCTION. INSTALL (N)FLASHING ON (E)CURB AFTER REROOFING.

D08 (E) ROOF VENT PIPE PENETRATION TO REMAIN. REMOVE/REPLACE

(E)FLASHING, EXTEND VENT THRU ROOF DUE TO NEW INSULATION HEIGHT.

TOTAL 29 VENT ON ROOF WITHIN CONSTRUCTION AREA. PHOTO SEE

D10 (E) 12X6 SCUPPER OPENING FOR LOW ROOF, TR, PHOTO SEE

H

MP801

G

MP801

D04 (E) SCUPPER OPENING FROM HIGH ROOM TO LOW ROOF, TBR, PHOTO SEE

B

MP801

F

MP801

D05 (E) AHU OR AC UNIT ON CURB TO BE TEMPORARILY REMOVED AND PROTECTED

TO ALLOW FOR THE REROOF. DISCONNECT ALL CONTROLS, PIPING, DRAINS,

AND DUCTING FOR REMOVAL. COORDINATE WITH CDCR REPRESENTATIVE FOR

CRANE IS REQUIRED TO MOVE UNIT. UNIT IS TO BE SET ON GROUND TO ALLOW

FOR NEW CURB ADAPTOR TO BE ADDED. LABEL UNIT (STENCIL PAINT 2" HIGH

LETTERS) BEFORE REMOVAL. LABEL WITH CORRESPONDING NUMBER ON PLAN.

SEE OR

C

MP801

D

MP801

D19

N

MP801

(E) WATER HEATER TO BE REMOVED FROM THE EXISTING CURB AND

PROTECTED TO ALLOW FOR THE REROOF. DISCONNECT ALL CONTROLS AND

PIPING PIPING, AND DRAIN TO EMPTY THE TANK FOR REMOVAL. LABEL UNIT

(STENCIL PAINT 2" HIGH LETTERS) BEFORE REMOVAL. LABEL WITH

CORRESPONDING NUMBER ON PLAN. SEE

D22 (E) DUCT THRU ROOF, TO BE TEMPORARY DISCONNECTED. FIELD MEASURE

DUCT SIZE. PHOTO SEE

O

MP801

(E)36X24 DUCT ON ROOF, TO REMAIN. DISCONNECT AND TEMPORARILY

REMOVE DURING RE-ROOFING, PROTECT IN PLACE. DUCT WILL BE

REQUIRED TO BE ON NEW SUPPORT. REPLACE WITH (N) DUCT AT SAME SIZE

IF NECESSARY. SIZE TO BE FIELD VERIFIED AND RECORD, PHOTO SEE

D20

O

MP801

(E) G, CW, HW, HWR UTR, TEMPORARY DISCONNECT DURING

CONSTRUCTION. PHOTO SEE

D21

N

MP801

D13 (E) CONDENSATE DRAIN PIPING ON ROOF, TEMPORARY REMOVED DURING

CONSTRUCTION. REMOVE ALL PIPING SUPPORT. PHOTO SEE

I

MP801

D14 (E) CONDENSATE DRAIN PIPING (D)THRU ROOF, TR. PHOTO SEE

I

MP801

D15 (E) INDUSTRIAL COLD WATER PIPING ON ROOF, TEMPORARY REMOVED DURING

CONSTRUCTION. REMOVE ALL PIPING SUPPORT. PHOTO SEE

J

MP801

D16 (E) INDUSTRIAL COLD WATER PIPING (D)THRU ROOF, TR. PHOTO SEE

L

MP801

D17 (E) MEDIUM PRESSURE NATURAL GAS PIPING ON ROOF, TEMPORARY REMOVED

DURING CONSTRUCTION. REMOVE ALL PIPING SUPPORT. PHOTO SEE

M

MP801

D16A (E) INDUSTRIAL COLD WATER PIPING PENETRATE INTO CURB, TEMPORARY

DISCONNECTED AND TO BE RE-ROUTED. PHOTO SEE

K

MP801

D18 (E) NATURAL GAS PIPING CONNECT TO AC OR AHU W/ PRESSURE REGULATOR.

TEMPORARY DISCONNECT DURING CONSTRUCTION. PHOTO SEE

M

MP801

MPA201

M E C

H A N

IC

A

L P

L U

M B

IN

G

T Y P

IC

A L

H

O U

S

IN

G U

N

IT

R O

O F P

L A

N D

E M

O L

IT

IO

N

BUILDING 332 BUILDING 331

N

N

N

BUILDING 333 BUILDING 335

N

BUILDING 336 BUILDING 337 BUILDING 338 BUILDING 339 BUILDING 3310 BUILDING 341 BUILDING 342 BUILDING 343 BUILDING 344

N

N N N

N

N

BUILDING 345

N N

N

N

BUILDING 348 BUILDING 349 BUILDING 3410

N N

N

(E)AHU-1 THRU 3 EXISTING HANDLING UNIT, "ENERGY LAB" UNIT W/

"REZNOR" NATURAL GAS FURNACE AND EVAP COOLER,

MODEL# AND DETAILED INFORMATION UNKNOWN.

(E)AC-1 EXISTING AIR CONDITIONING UNIT ON HIGH ROOF,

ROOF TOP UNIT W/ NATURAL GAS FURNACE,

MANUFACTURE, MODEL# AND DETAILED INFORMATION

UNKNOWN.

(E)EF-1 THRU 33 EXISTING EXHAUST FAN, UNIT MODEL# AND DETAILED

INFORMATION UNKNOWN.

(E)WH-1 EXISTING WATER HEATER ON HIGH ROOF.

"TURBOPOWER" LOW NOX CATEGORY I FAN-ASSISTED

STORAGE WATER HEATER, 500 LHE 250A-TPL, 250

GALLON, 399,000 BTU/HR NATURAL GAS INPUT,

4.5"-10.5" W.C. GAS INLET PRESSURE, 120V/1PH/60 HZ,

5AMPS.

NOTES:

1. NO AS-BUILT DRAWING FOR THE BUILDINGS. NAMEPLATE FOR

MOST UNITS CANNOT BE FOUND OR NOT READABLE. CONTRACTOR

SHALL FIELD VERIFY ACTUAL UNIT INFORMATION FOR EACH BUILDING.

2. MANY AHU'S WERE FOUND TO BE LEAKING. THEY MUST BE

REPAIRED PRIOR TO REROOFING.

EXISTING EQUIPMENT SCHEDULE

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

10/10/23

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

23-0002

11/20/2023 CASp 491 #1317

File details come from the government source that posted it. Updated .